Emergency Test in case S2-F26

of Partial Power Outage Version 2


This document and the information it contains are property of Enova and confidential. They shall not be reproduced nor disclosed to any person except to those having a need to know them without
prior written consent of the HSEQ Manager of Enova.

Emergency Test in case of Partial Power Outage


Contract: Site:

Tested person : Controller:


designation: Date:

Resources needed:
Prior to start the test make sure that all PPE & tools are available : pair of gloves suitable for electrical tasks, pair of safety shoes ; Tools (Torch, clamp metter,
screw driver, cutting plier, LOTO, Warning and insulation tape, Panel keys)
Supervisor as controller of the test and technicians to be chosen for the test.

Scenario:
A sudden power outage takes place in the facility. The client called the helpdesk to open a complaint without being able to describe the extent of the power
outage.

Assessment
SN Check points
Yes No NA Comments
Starting time:

1 Has the technician identified the area that is affected? (partial area of the facility)

2 Has he identified & browsed the right DB to identify any breaker that tripped?MCB, MCCB or ELCB ?

If no breaker tripped, has he checked if current runs in the main incoming cable feeding the DB (with clamp
3
meter) and investigate any loose connection of breaker?
If current doesn't run in the main incoming cable, has he browsed the electrical panels upstream of
4
thefacility grid (SMDB, then MDB)?

5 If a breaker tripped (MCB, MCCB or ELCB), has he identified the equipment trigerring the trip?

6 If equipment identified, has he figured out any rectification?

If there was no way to resume power supply within few minutes, has the technician identified the critical
7
building services compromised by the power outage meanwhile the failure is being investigated & fixed?

8 If any critical building service compromised, has he informed the supervisor/engineer/facility manager?

9 If any critical building service compromised, has he checked proper operation of UPS?

Ending time:

(number of YES/ number of check points) result in % =

Note: Molded-case Circuit Breakers (MCCB) Earth-leakage Circuit Breakers (ELCB) Miniature Circuit Breakers (MCB)
If any No is recorded in the assessment, preventive/corrective action(s) must be undertaken and recorded in the below table and the HSEEQ action plan for
Action Plan: follow up

Ref Action selected Why? (result expected) Who When

Technician sign off: Site manager sign off: Controller sign off: