You are on page 1of 17

PROJECT

AZITO PHASE IV PROJECT


COMBINED CYCLE POWER PLANT EXPANSION PROJECT
(CÔTE D’IVOIRE)

ANNEX

INTÉGRATION DANS LE SYSTÈME DE CONTRÔLE EXISTANT

DOCUMENT NUMBER

AZ-0014-PRO-AEE-0004

REVISION 00
DOCUMENT ISSUED FOR: REVIEW
DATE 11/03/2021

VLT-AEE POWER YEB-AEE POWER JIV-AEE POWER

Issued by: Revised by: Approved by:

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION AND CAN NOT BE DUPLICATED, MODIFIED OR DISCLOSED TO
THIRD PARTIES FOR ANY USE OTHER THAN THIS PROJECT AND THE PURPOSE FOR WHICH IT IS INTENDED FOR, WITHOUT
THE WRITTEN CONSENT OF COBRA.

Test Documentation
Site Acceptance Test-Report

Project Azito IV 225 kV

Customer Azito Energies

Main Contractor AEE

ABB Order No. 23108

Station Azito Combined Cycle Power Plant

Equipment RTU, SAS, P&C System

ABB Responsible Click here to enter text Client Click here to enter text

X X
Project Manager Site Manager

Title Test Documentation Prepared G. Riemer Date 2021-01-12

Project Azito IV 225 kV Approved T. Wittich Date 2021-01-12

Azito Energies

23108 Customer Document No: [Customer Number] Rev: A

Language EN
ABB Switzerland Ltd Doc. No. 1KHF374450
Page 1/16

© Hitachi Power Grids. 2020. All rights reserved.



Contents
Site Acceptance Test-Report ............................................................................................................................ 3
Azito IV ..............................................................................................................................................................................3
A1 SAS ................................................................................................................................................................................3
Loose Devices Loose Devices ...................................................................................................................................3
Monitor, 52" LCD Monitor NEC MultiSync P554, SN: 95111390NB ................................................................3
MicroSCADA Server SCADA .......................................................................................................................................3
Computer, KA1 MicroSCADA Server, SN: - ..........................................................................................................3
RTU560 Gateway SCADA .......................................................................................................................................... 4
Panel, Panel RTU560 Gateway, SN: -................................................................................................................... 4
RTU Module, -A100 RTU560, SN: 1KGT022200R0001 560SFR02 W2040 0372 ...........................................5
D1 220kV........................................................................................................................................................................... 6
Loose Devices Loose Devices .................................................................................................................................. 6
Loose Material, Prometer 100 -, SN: WP023515 ............................................................................................... 6
Loose Material, Prometer 100 -, SN: WP023516 ................................................................................................ 7
Q14 Incomer ................................................................................................................................................................. 7
Panel, Panel -, SN: - .................................................................................................................................................. 7
IED, REC670 Bay Control and Protection, SN: T2020045 ............................................................................... 7
IED, REB500 BU BBP & BFP, SN: 23108-100 ...................................................................................................... 13
MFM, Sineax AM1000 -, SN: 12033710001 ........................................................................................................ 15

Title Station Document No: Customer Document No: Revision Page

Azito Combined Cycle


Test Documentation 1KHF374450 [Customer Number] A 2/16
Power Plant
© Hitachi Power Grids. 2020. All rights reserved.

Site Acceptance Test-Report
Azito IV
A1 SAS
Loose Devices Loose Devices
Monitor, 52" LCD Monitor NEC MultiSync P554, SN: 95111390NB

52" LCD Monitor Device Test Monitor


Step Name Expected Result Passed Failed Comment
1) Mechanical test 1) No visible damages ☐ ☐

2) Function test 1) Monitor is working correctly ☐ ☐

MicroSCADA Server SCADA


Computer, KA1 MicroSCADA Server, SN: -

S10-PICS Process related pictures Single Line Diagram


Step Name Expected Result Passed Failed Comment
1) Verify Display of Single Line Diagram Display complies with document. ☐ ☐

2) Verify Static Objects Static objects are shown with the correct symbols and colors ☐ ☐

3) Check Dynamic Objects 1) Process state is updated correctly ☐ ☐


2) Subdialog shows correct values
3) Controls in subdialogs can be operated

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 3/16
© Hitachi Power Grids. 2020. All rights reserved.
S10-PICS Process related pictures Bay Picture
Step Name Expected Result Passed Failed Comment
1) Verify Display of Bay Picture Display complies with document. ☐ ☐

2) Verify Static Objects Static objects are shown with the correct symbols and colors ☐ ☐

3) Check Dynamic Objects 1) Process state is updated correctly ☐ ☐


2) Subdialog shows correct values
3) Controls in subdialogs can be operated

S10-PICS Process related pictures System Supervision Display


Step Name Expected Result Passed Failed Comment
1) Check appearance of System Supervision Display complies with document ☐ ☐
Display

2) Check connection between devices Connection status is indicated correctly ☐ ☐

3) Check devices status information 1) Device status is shown with actual value. ☐ ☐
2) Subdialog shows the correct values

S10-PICS Process related pictures Busbar Coloring


Step Name Expected Result Passed Failed Comment
1) Check correct Busbar color Correct Busbar colors displayed ☐ ☐

2) Dynamic Busbar coloring (de-energized) De-energized section appears in correct color according ☐ ☐
Functional Description
3) Dynamic Busbar coloring (energized) Color changed back according voltage level ☐ ☐

RTU560 Gateway SCADA


Panel, Panel RTU560 Gateway, SN: -

Panel Device Test Final checks (ST)


Step Name Expected Result Passed Failed Comment
1) Mechanical Assembly 1) Cubicle is earthed ☐ ☐
2) No visual damages

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 4/16
© Hitachi Power Grids. 2020. All rights reserved.
Panel Device Test Final checks (ST)
Step Name Expected Result Passed Failed Comment
3) Labels are complete
2) Terminals check All terminals are in the position they should be ☐ ☐

3) As built drawing Drawing ready for as built version ☐ ☐

RTU Module, -A100 RTU560, SN: 1KGT022200R0001 560SFR02 W2040 0372

COMM RTU Communikation Host lines


Step Name Expected Result Passed Failed Comment
1) Define location, protocol and amount of 1) Location correct ☐ ☐
host lines 2) Protocol correct
3) Amount of host lines correct
2) Verify communication protocol setting 1) RTU is communicating with host or host simulator ☐ ☐
and connection 2) All typical signals are transmitted

COMM RTU Communikation Sub lines


Step Name Expected Result Passed Failed Comment
1) Define Location, Protocol and Amount of 1) Location correct ☐ ☐
Sub lines 2) Protocol correct
3) Amount of Host lines correct
2) Verify Communication protocol setting 1) RTU is communicating with slave device or slave device ☐ ☐
and connection simulator
2) All typical signals are transmitted

SIG RTU Signaltest Point to Point test


Step Name Expected Result Passed Failed Comment
1) Define name, date and revision of 1) Name, date and revision correct ☐ ☐
signallist document

2) Check signals according signallist All tested signals have to be marked in signallist ☐ ☐

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 5/16
© Hitachi Power Grids. 2020. All rights reserved.
SPLYREDUN RTU Supply Redundancy Redundant Power Supply
Step Name Expected Result Passed Failed Comment
Make sure system is running on primary 1) Supply should not get interrupted ☐ ☐
power supply 2) Error reported in RTU system

Check automated switching to secondary 1) Secondary power supply takes over without interruption ☐ ☐
power supply 2) Error reported in RTU system

Check automated switching to primary 1) Primary power supply takes over without interruption ☐ ☐
power supply 2) Error reported in RTU system

Time Synchronization Time Synchronization Time Synchronization


Step Name Expected Result Passed Failed Comment
Check time synchronization The RTU time is correct, the SEV in the hardware tree is not on ☐ ☐
status "IV"

Time Stamp Time Stamp Time Stamp


Step Name Expected Result Passed Failed Comment
Check time stamp 1) Signal time stamps of the simulated signals from the process ☐ ☐
verified and it replicates the RTU time which synchronized with
GPS

D1 220kV
Loose Devices Loose Devices
Loose Material, Prometer 100 -, SN: WP023515

Energy Energy Measurement Function Test


Step Name Expected Result Passed Failed Comment
1) Active Power Active Power Measurement and Pulse Outputs are according ☐ ☐
injection (Export / Import)

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 6/16
© Hitachi Power Grids. 2020. All rights reserved.
Energy Energy Measurement Function Test
Step Name Expected Result Passed Failed Comment
2) Reactive Power Reactive Power Measurement and Pulse Outputs are according ☐ ☐
injection (Export / Import)

Loose Material, Prometer 100 -, SN: WP023516

Energy Energy Measurement Function Test


Step Name Expected Result Passed Failed Comment
1) Active Power Active Power Measurement and Pulse Outputs are according ☐ ☐
injection (Export / Import)
2) Reactive Power Reactive Power Measurement and Pulse Outputs are according ☐ ☐
injection (Export / Import)

Q14 Incomer
Panel, Panel -, SN: -

Panel Device Test Final checks (ST)


Step Name Expected Result Passed Failed Comment
1) Mechanical Assembly 1) Cubicle is earthed ☐ ☐
2) No visual damages
3) Labels are complete
2) Terminals check All terminals are in the position they should be ☐ ☐

3) As built drawing Drawing ready for as built version ☐ ☐

IED, REC670 Bay Control and Protection, SN: T2020045

-A201 BCU Device Test User and Password


Step Name Expected Result Passed Failed Comment
1) Users Note the result of the discussion under actual result. ☐ ☐

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 7/16
© Hitachi Power Grids. 2020. All rights reserved.
Communication Signaltest and Timesync Function Test
Step Name Expected Result Passed Failed Comment
1) Signal Test Tested Signals are marked in the signal list and stored on ☐ ☐
project drive
2) Check of Time & Time-zone 1) Time is synchronized with GPS time ☐ ☐
2) Timezone is according country local time

25 Synchrocheck, energizing check and Function Test


synchronizing
Step Name Expected Result Passed Failed Comment
1) Energizing Check Energizing Check: BOTH ☐ ☐

1) DeadBus & LiveLine = CloseEnable: Yes
2) DeadBus & LiveLine, BusVTMCB Off = CloseEnable: No
3) LiveBus & DeadLine = CloseEnable: Yes
4) LiveBus & DeadLine, LineVTMCB Off = CloseEnable: No
5) DeadBus & DeadLine = CloseEnable: Yes

Note 1: In case of a coupler replace Bus and Line with Bus1 and
Bus2
Note 2: In case of a busbar image replace BusVTMCB with
BBImageOK
2) Synchrocheck Synchrocheck-Release: ☐ ☐
(Values to be updated accordingly)

dU: 16.5V
dPhi: 25°
3) Synchrocheck Bypass Synchrocheck Bypass is active if: Q1 open & Q2 open & Q9 open ☐ ☐

4) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 8/16
© Hitachi Power Grids. 2020. All rights reserved.
BLK Blocking conditions Function Test
Step Name Expected Result Passed Failed Comment
1) Cranke Handle The corresponding switch or the complete feeder is blocked ☐ ☐
(according concept)
2) SF6 Gas 1) The corresponding alarms are generated ☐ ☐
2) The corresponding alarms and blockings are according
blocking concept
3) Double Operation Interlocking 1) Each selection is sending a reservation signal (Hardwired ☐ ☐
Output or GOOSE-Signal)
2) All switching objects are blocked
4) Spring Pressure 1) Circuit breaker can be operated. Corresponding alarm is given ☐ ☐
after x seconds. Autoreclosure is not released
2) CB open command is possible. CB close command is blocked.
Corresponding alarm(s) is/are given
3) CB open and close commands are blocked. Corresponding
alarm(s) is/are given
5) Drive Not Ready 1) Alarm e.g. "drive not ready" ☐ ☐
2) Operation is still possible in cubicle as blocking is done in
drive itself
6) Trip Circuit Supervision CB close command is not possible ☐ ☐

7) Protection Lockout CB close command is not possible ☐ ☐

8) Protection Not Ready CB close command is not possible ☐ ☐

CMD Command handling Command handling


Step Name Expected Result Passed Failed Comment
1) Indications Positions are according to the primary equipment status ☐ ☐

2) Selection Timeout Selection is cancelled after x seconds (according to setting) ☐ ☐

3) Operating Mode OFF: Operation is not possible from Local and Remote ☐ ☐
LOCAL: Operation is possible from control unit only
REMOTE: Operation is possible from SAS only
EMERGENCY: Operation is possible from Mimik only

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 9/16
© Hitachi Power Grids. 2020. All rights reserved.
CMD Command handling Antipumping
Step Name Expected Result Passed Failed Comment
1) Precondition Circuit Breaker opens ☐ ☐

2) Antipumping 1) Circuit breaker closes and reopens ☐ ☐


2) No further CLOSE command will be executed. "Pumping" is
inhibited

ITL Interlocking Function Test


Step Name Expected Result Passed Failed Comment
1) Interlocking Conditions The switching objects are interlocked according the ☐ ☐
interlocking description
2) Interlocking Override Interlocking Override ON = All Interlocking conditions are ☐ ☐
bypassed

SUP Supervision Runtime Supervision


Step Name Expected Result Passed Failed Comment
1) Runtime Supervision After the project specific timeout a switch runtime alarm or ☐ ☐
position error alarm is generated

SUP Supervision Counters


Step Name Expected Result Passed Failed Comment
1) Circuit Breaker Operating Counter Circuit breaker counter counts up +1 for each close command ☐ ☐

Current Current Measurement Function Test


Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band ☐ ☐

2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 10/16
© Hitachi Power Grids. 2020. All rights reserved.
Power Power Measurement Function Test
Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band ☐ ☐

2) Nominal Values Active and Reactive Power are according injection and single ☐ ☐
line diagram
3) Power Factor CosPhi is according injection ☐ ☐

Voltage Voltage Measurement Function Test


Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band ☐ ☐

2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram

50 Instantaneous phase overcurrent protection Function Test


Step Name Expected Result Passed Failed Comment
1) Pick-up Values Pick-up values and tripping times according to setting ☐ ☐
calculations
2) Trip / Close Block The function trips and close block is according to the trip ☐ ☐
matrix concept
3) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
4) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
5) Function as Backup Protection Protection Function is blocked and is not tripping ☐ ☐

50N Instantaneous earth fault protection Function Test


Step Name Expected Result Passed Failed Comment
1) Pick-up Values Pick-up values and tripping times according to setting ☐ ☐
calculations
2) Trip / Close Block The function trip and close block is according to the trip matrix ☐ ☐
concept

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 11/16
© Hitachi Power Grids. 2020. All rights reserved.
50N Instantaneous earth fault protection Function Test
Step Name Expected Result Passed Failed Comment
3) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
4) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
5) Function as Backup Protection Protection Function is blocked and is not tripping ☐ ☐

51 Time delayed overcurrent protection Function Test


Step Name Expected Result Passed Failed Comment
1) Pick-up Values Pick-up values and tripping times according to setting ☐ ☐
calculations
2) Trip / Close Block The function trip and close block is according to the trip matrix ☐ ☐
concept
3) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
4) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
5) Function as Backup Protection Protection Function is blocked and is not tripping ☐ ☐

51N Earth fault protection Function Test


Step Name Expected Result Passed Failed Comment
1) Pick-up Values Pick-up values and tripping times according to setting ☐ ☐
calculations
2) Trip / Close Block The function trip and close block is according to the trip matrix ☐ ☐
concept
3) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
4) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
5) Function as Backup Protection Protection Function is blocked and is not tripping ☐ ☐

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 12/16
© Hitachi Power Grids. 2020. All rights reserved.
TCS Trip circuit suppervision Function Test
Step Name Expected Result Passed Failed Comment
1) Pre-Conditions No Supervision Alarms ☐ ☐

2) Supervision Trip circuit alarm is indicated ☐ ☐

IED, REB500 BU BBP & BFP, SN: 23108-100

-F331 BBP Device Test User and Password


Step Name Expected Result Passed Failed Comment
1) Users Note the result of the discussion under actual result. ☐ ☐

Communication Signaltest and Timesync Function Test


Step Name Expected Result Passed Failed Comment
1) Signal Test Tested Signals are marked in the signal list and stored on ☐ ☐
project drive
2) Check of Time & Time-zone 1) Time is synchronized with GPS time ☐ ☐
2) Timezone is according country local time

50BF Breaker failure protection Function Test


Step Name Expected Result Passed Failed Comment
1) Pick-up Values Pick-up values according to setting calculations ☐ ☐

2) Initiation with current The function is only tripping if the current is above the pick-up ☐ ☐
value
3) Initiation without current The function is only tripping if the CB Position is closed ☐ ☐
(independently of the current)
4) ReTrip Time (t1) Tripping times according to setting calculations ☐ ☐

5) Backup Time (t2) Tripping times according to setting calculations ☐ ☐

6) Trip / Close Block The function trips and close block is according to the trip ☐ ☐
matrix concept

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 13/16
© Hitachi Power Grids. 2020. All rights reserved.
50BF Breaker failure protection Function Test
Step Name Expected Result Passed Failed Comment
7) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
8) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept

87B Busbar protection Function Test


Step Name Expected Result Passed Failed Comment
1) Pick-up Values Pick-up values and tripping times according to setting ☐ ☐
calculations
2) Trip / Close Block The function trip and close block is according to the trip matrix ☐ ☐
concept
3) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram ☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
4) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
5) Differential Current Alarm The Busbar Protection is blocked. The alarm: "Diff. current ☐ ☐
alarm" is indicated
6) Isolator Alarm 1) The Busbar Protection is blocked. The "Isolator alarm" is ☐ ☐
indicated
2) The Busbar Protection is not blocked anymore. The alarm:
"Isolator alarm" disappears

7) Switch Inhibit 1) The Busbar Protection is blocked. The alarm "Switch inhibit" ☐ ☐
is indicated
2) The Busbar Protection is not blocked anymore. The alarm:
"Switch inhibit" is still indicated
3) The alarm "Switch inhibit" disappears

8) Undervoltage Release Pick-up values according to setting calculations ☐ ☐

9) Inspection and Maintenance Isolator positions are simulated accordingly and an alarm is ☐ ☐
indicated

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 14/16
© Hitachi Power Grids. 2020. All rights reserved.
87B Busbar protection Stability check (ST)
Step Name Expected Result Passed Failed Comment
1) Isolator auxiliary conctacts operation Auxilliary contact opens/closes according isolator sequence in ☐ ☐
sequence schematic attached

2) Breaker auxiliary contacts operation 1) Close command is active till CB is actually closed ☐ ☐
sequence 2) All CB close comands are connected to busbar protection
device (LCC, Mimic, AR, etc.)
3) Stability check The system is stable ☐ ☐

MFM, Sineax AM1000 -, SN: 12033710001

-A205 Measures Device Test HW and Measurements (SAT)


Step Name Expected Result Passed Failed Comment
Check of nominal voltage and current Note the Name of the Person / Company / Organisation who ☐ ☐
tested the whole CT/VT Circuit

Check of Analog Inputs 1) Download the attachment and fill out the analog values ☐ ☐
2) Upload attachment

-A205 Measures Device Test Final checks (SAT)


Step Name Expected Result Passed Failed Comment
CT/VT Circuits CT and VT Circuits are closed and not short-circuited ☐ ☐

Current Current Measurement Function Test


Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band ☐ ☐

2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 15/16
© Hitachi Power Grids. 2020. All rights reserved.
Power Power Measurement Function Test
Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band ☐ ☐

2) Nominal Values Active and Reactive Power are according injection and single ☐ ☐
line diagram
3) Power Factor CosPhi is according injection ☐ ☐

Voltage Voltage Measurement Function Test


Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band ☐ ☐

2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram

Title Station Document No: Customer Document No: Revision Page

Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 16/16
© Hitachi Power Grids. 2020. All rights reserved.