Professional Documents
Culture Documents
Adding a link in admin menu to assign 2.Design the page to display the user details with assigned
reports for the user reports and unassigned reports
Daily Status - Date(15-12-2021)
Estimate (in
Task/Sub Task details (if any) Priority JIRA#
hours)
3/12/2021
In Progress 29/11/2021 10/12/2021
17/12/2021 6
Total Actual Effort (in hrs) Comments
024 Introduction
025 Package.json
026 Installing a Node Package
027 Using a Package
028 Package Dependencies
029 NPM Packages and Source Control
030 Semantic Versioning
031 Listing the Installed Packages
https://codewithmosh.com/p/the- 03 Node Package 032 Viewing Registry Info for a Package
1
complete-node-js-course Manager(48mins) 033 Installing a Specific Version of a
Package
034 Updating Local Packages
035 DevDependencies
036 Uninstalling a Package
037 Working with Global Packages
038 Publishing a Package
039 Updating a Published Package
lf Learning
Estimate (in Effort Total Effort on
Status Start Date End Date Comments
hours) (15.12.2021) the course