You are on page 1of 1

Per Unit

,005 ,01 ,03 ,05 ,1 ,3 ,5 1 3 5 10 30 50 100


1K 1K
Normalized (shifted) TCC
3-Phase (Sym) fault: 1,103kA @ 20kV
500 Faulted Bus: Bus Saluran 1% 500
SQOP File: Untitled
300 Data Rev: Base 300
Configuration: Normal
Date: 10-13-2021

100 100

50 50

30 30

10 Relay Incoming - P - 51 10

OC1
5 1,003 kA @ 20 kV 5
Seconds

Seconds
t1: 0,701 s
3 3

1 1

,5 ,5

,3 ,3

I> Relay Incoming

,1 ,1
Relay Outgoing - P - 51
OC1
,05 1,003 kA @ 20 kV ,05
t1: 0,299 s
,03 ,03

I> Relay Outgoing


,01 ,01
,005 ,01 ,03 ,05 ,1 ,3 ,5 1 3 5 10 30 50 100

Per Unit ETAP Star 16.0.0C

Star2

Project: Prak. ASTL Ganjil 2021/2022 Date: 10-13-2021


Location: Lab. Sistem Tenaga Listrik SN: 4359168
Contract: Rev: Base
Engineer: Zulhanifah Nur Ari Safitri Fault: Phase(Normalized)
Filename: E:\ETAP 1600\Rangkaian M3_ZULHANIFAH NUR ARI SAFITRI_20181