Introduction

Pertamina through the Refinery Development Master Plan (RDMP) is planning to upgrade the existing
RU-V Balikpapan Refinery by expanding the existing capacity from 260 MBSD to 360 MBSD to
produce high quality fuel products and to meet Indonesian growing fuel demand, named the RDMP
RU-V Balikpapan Project. All crudes processed in Balikpapan refinery are received in the Lawe-Lawe
Terminal. For which, the Lawe-Lawe Terminal will be provided new facilities such as unloading facility
from tanker, crude storage tank, utility units and crude transfer line to RU-V Balikpapan refinery.
Meanwhile, in Balikpapan refinery will be built several new process units such as RFCC complex,
Hydrotreating plants, Isomerization unit, Alkylation unit, Naphtha reforming unit etc.
Facility to Develop in RDMP RU-V Balikpapan Project

The facility to be developed in RDMP RU-V Balikpapan Project will covered works in Refinery Unit-V
at Balikpapan area and Crude terminal at Lawe-Lawe area as describe in diagram below.

Detail works for Crude Terminal Lawe-Lawe Facilities is described in diagram below.
Project
EPC ISBL (Inside Battery Limit) and OSBL
(Outside Battery Limit) RDMP Project RU-V

Location
Refinery Unit V Balikpapan, East Kalimantan, Indonesia

Project Scope
IPMT Services in a Shadow PMC structure
■ Refinery Units (EPC Bidding to Final Acceptance)
■ Lawe-Lawe (EPC Bidding to Final Acceptance)
■ Early Works (Supervision for Construction)
■ Duration of Work (60 Months Total)
■ EPC Bidding – 9 Months
■ EPC – 48 Months
■ Close out period – 3 Months
■ PMC size: 224 positions,1,500,000 Hours

Process Unit/Facilities
■ GSH/RFCC NHT Unit, DHT-I, DHT-II, NHT/CCR Reforming, Isomerization, Alkylation, Saturated
GCU, Amine Treater, Amine Regenerator, SWS, Spent Caustic Treater, Sat. LPG Treater, Caustic
Treater, SRU and Hydrogen Plant
■ Revamp CDU/VDU, HCU, LPG Recovery
■ Water Treatment Plant: Sea Water Intake, Sea Water Treatment, Water Demineralizer, Effluent
Water Treatment, Cooling Tower, Waste Water Treatment and Fire Water System
■ Steam & Power Generator Plant: Utility Boiler, Steam Turbine Generator/Gas Turbine Generator
and Emergency Diesel Generator
■ Air Plant: Nitrogen and Instrument air
■ Tankage System.
GRASSROOT
MAJOR PROCESSING UNITS REVAMP
LICENSED OPEN ART
CDU + VDU ✓
NHT ✓
Hydrocracker (HCU) ✓
RFCC ✓
RFCC LPG Treating ✓
Propylene Recovery ✓
CCR Platforming ✓
RFCC Naphtha Hydrotreater ✓
Diesel Hydrotreater x2 ✓
Alkylation ✓
Naphtha Hydrotreater ✓
ALKY, ISOM, Wet Gas Sulphur Acid ✓
SGP, Sat Gas Treating, ARU, SWS, SRU, H2 ✓