Project Working Methodology and Process

Step 1:
We prepare the tools and materials needed so that we can easily get want is needed.

Step 2:
We measure the exact length of each electrical pipe according to there sizes.
Step 3:
We cut the electrical pipe according to there sizes.

Step 4:
We heated the electrical pipe slowly so that it will not going to burn.
Step 5:
We slowly bend the electrical pipe to avoid deformation of the pipe.

Step 6:
We used a wet towel to harden back the electrical pipe.