SUBSTATION AUTOMATION SOLUTIONS

OFFER FOR

Control and Relay Panels for 132kV


SS at Azure
_____________________________

COMMERCIAL PROPOSAL
SASCOM1 - COMMERCIAL
SUBSTATION AUTOMATION SOLUTIONS
PROPOSAL
Control and Relay Panels for 132kV SS at Azure Page : 2/7

Infrastructure Business

Automation

Azure
SUBSTATION AUTOMATION SOLUTIONS
Control and Relay Panels for 132kV SS at Azure
SASCOM1 - COMMERCIAL PROPOSAL

Reference : SASCOM1– OP-140223-2348990


Version : A
Date 21-05-2014

Distribution : Limited to Azure, Azure


Confidentiality level : Confidential
Reproduction : Unauthorised externally to distribution list above

Document modification:

Version : Date Modification

A Original Issue

FUNCTION DATE FUNCTION DATE


NAME SIGNATURE NAME SIGNATURE

Author : Munaswamy M 21-05-2014 Munaswamy MArea Sales 21-05-2014


Manager
E-mail : munaswamy.mungara@schneider- Munaswamy M
eletcric.com

Azure\OP-140223-2348990 21-05-2014
© SCHNEIDER ELECTRIC Infrastructure Business
This document is strictly confidential and its reproduction is restricted to the distribution list
SASCOM1 - COMMERCIAL
SUBSTATION AUTOMATION SOLUTIONS
PROPOSAL
Control and Relay Panels for 132kV SS at Azure Page : 3/7

TABLE OF CONTENTS

1. INTRODUCTION 4

1.1. Objective 4

1.2. Application area 4

2. GLOSSARY OF TERMS 5

3. BASE PRICE FOR CONTROL AND RELAY PANELS FOR 132KV SS AT AZURE 6

Azure\OP-140223-2348990 21-05-2014
© SCHNEIDER ELECTRIC Infrastructure Business
This document is strictly confidential and its reproduction is restricted to the distribution list
SASCOM1 - COMMERCIAL
SUBSTATION AUTOMATION SOLUTIONS
PROPOSAL
Control and Relay Panels for 132kV SS at Azure Page : 4/7

1. INTRODUCTION
In this document, the following shorten names are used :
Azure
Azure
SCHNEIDER ELECTRIC for SCHNEIDER ELECTRIC Infrastructure Automation

1.1. OBJECTIVE
The objective of this document is to provide to Azure during bid phase with a comprehensive description of the
substation automation solution from SCHNEIDER ELECTRIC for the above mentioned project..

This document is also associated with the following documents provided by SCHNEIDER ELECTRIC as a part
of our offer :
Limits of supply document No SASCOM2
Equipment list document No SASTEC2

Our offer has been fully based on the following specifications and documents from Azure and/or Azure :

1.2. APPLICATION AREA


This document is to be used for tendering purpose only, as part of the proposal of SCHNEIDER ELECTRIC

Azure\OP-140223-2348990 21-05-2014
© SCHNEIDER ELECTRIC Infrastructure Business
This document is strictly confidential and its reproduction is restricted to the distribution list
SASCOM1 - COMMERCIAL
SUBSTATION AUTOMATION SOLUTIONS
PROPOSAL
Control and Relay Panels for 132kV SS at Azure Page : 5/7

2. GLOSSARY OF TERMS

SUBSTATION AUTOMATION SOLUTIONS


ACRONYMS
MAIN COMPONENTS
Wide Area Network, Computers network, Upper network ETHERNET

Wide Area Network protocols IEC 61850, UCA2


Subnetwork protocols MODBUS, IEC-60870-5-103, DNP3
Gateway Computer, Terminal Equipment, Gateway to the remote
GATEWAY COMPUTER
control point
Human Machine Interface HMI
Industrial computer connected to the Ethernet with management
PLC, RTU, BC
of electrical database (with or without HMI)
MICOM Intelligent Electronic Devices Range MICOM IEDs
MICOM Protection Range MICOM Pxxx
MICOM Measurement Range MICOM Mxxx
MICOM Computer Range MICOM Cxxx
Non-Conventional Instrument Transformer NCIT
Miniature Circuit Breaker MCB
Cubicle Protection Category IPxx
Cubicle Color Code RALxxxx
Remote Terminal Unit RTU
Feeder Remote Terminal Unit FRTU
Fault Passage Indicator FPI
Multi Function Transducer MFT
Contact Multiplying Relay CMR
Heavy Duty Relay HDR
Ring Main Unit RMU
Telecom standards 3G/GPRS/GSM/CDMA
Supervisory Control And Data Acquisition SCADA
Distribution Management System DMS
Fault Detection and Intelligent Restoration, Fault Management
FDIR, FMSR
and System Restoration

Azure\OP-140223-2348990 21-05-2014
© SCHNEIDER ELECTRIC Infrastructure Business
This document is strictly confidential and its reproduction is restricted to the distribution list
SASCOM1 - COMMERCIAL
SUBSTATION AUTOMATION SOLUTIONS
PROPOSAL
Control and Relay Panels for 132kV SS at Azure Page : 6/7

3. BASE PRICE FOR CONTROL AND RELAY PANELS FOR 132KV SS AT


AZURE

ITEM DESIGNATION QTY Unit Price INR Total Price INR


CCS
1- SUBSTATION 1 16,40,300.00
1.1 132kV Line Feeder Control and Relay Panel 1 5,35,500.00 5,35,500.00
1.2 132kV Transformer Control and Relay Panel 2 5,52,400.00 11,04,800.00
2- SUBSTATION 2 21,72,700.00
2.1 132kV Line Feeder Control and Relay Panel 1 5,35,500.00 5,35,500.00
2.2 132kV Transformer Control and Relay Panel 3 5,52,400.00 16,06,575.00
Total Price CCS 38,33,500.00

DCS
1- SUBSTATION 1 34,30,500.00
1.1 HMI 1
1.2 GATEWAY 1
1.3 LAN Accessories 1 34,30,500.00 34,30,500.00
1.4 PACiS TOOLS 1
1.5 Station Auxilary RTU 1
2- SUBSTATION 2 37,53,700.00
2.1 HMI 1
2.2 GATEWAY 1
2.3 LAN Accessories 1 37,53,700.00 37,53,700.00
2.4 PACiS TOOLS 1
2.5 Station Auxilary RTU 1
Total Price DCS 71,84,200.00

Total Price 1,10,17,200.00

1. The price quoted above is Ex - Works (Chennai)

2. The date of contract coming into force will be reckoned from the date of receipt of technically and
commercially clear P.O.(with details of Billing & shipping details, CST & TIN nos and Pin code),
advance and clear technical inputs.

3. Our quoted price is exclusive of any taxes and duties applicable. (ED/CST/VAT/OCTROI/Entry Tax
will be charged extra as applicable)

Azure\OP-140223-2348990 21-05-2014
© SCHNEIDER ELECTRIC Infrastructure Business
This document is strictly confidential and its reproduction is restricted to the distribution list
SASCOM1 - COMMERCIAL
SUBSTATION AUTOMATION SOLUTIONS
PROPOSAL
Control and Relay Panels for 132kV SS at Azure Page : 7/7

4. Any additional tax impact on manufactured items/bought out goods(domestic, imported & services)
that will arise because of GST implementation, shall be entirely in the account of Purchaser.

5. Freight charges will be extra at actuals

6. Our scope includes 1 no. of visits . Any increase in no. of man-days/visits for the reasons not
attributable to SEIL, will have price implications. Commissioning is not considered in present scope.
Commissioning will be based on man-day basis.

7. Drawings will be submitted within 4 to 6 weeks from the date of receipt PO, advance and clear
technical inputs. Customer to give comments within 2 weeks from the date of submission of the
drawings. SEIL will resubmit the drawings incorporating the changes suggested by customer within 2
weeks after receiving the comments. Customer to give the final approval within 1 week from the date
of re-submission of drawings. Equipments will be delivered within 10 to 12 weeks from the date of
receipt of final approved drawings and manufacturing clearance.

8. Notwithstanding anything in the Contract to the contrary and to the extent permitted by applicable
law, (a) in no event shall either Party, its officers, directors, or employees be liable for any form of
incidental, consequential, indirect, special or punitive damages of any kind, or for loss of revenue or
profits, loss of business, loss of information or data, or other financial loss, whether such damages
arise in contract, tort or otherwise, irrespective of fault, negligence or strict liability or whether such
Party has been advised in advance of the possibility of such damages; and
(b) the maximum liability of the Seller for any and all claims, losses, damages, costs and expenses
arising from or on connection with this Contract shall not exceed the amounts actually received by the
Seller under this Contract.

9. All sort of statutory variation including change, addition, deletion, abolition, repeal or
reclassification due to change in Law and/ or directive or interpretation of authorized agency, shall be
exclusively to the owner/client’s account.

10. For Terms and conditions , please refer document "Standard T&Cs -Supply of Equipment and
Services (Solution Center)" attached. Letter of Credit (LC) should be established by purchaser at the
time of manufacturing clearance.

11. It is to be noted that 40% is contribution from imported material. Total prices quoted by
SE in INR are based on conversion rate @ 83 INR per Euro. Any variation in above foreign
currency exchange Rate shall be to the account of customer. The final prices shall be
adjusted based on the prevailing foreign currency exchange rate as on the day of billing .The
forex rate as published by SBI shall be considered in computations.

****************************************

Azure\OP-140223-2348990 21-05-2014
© SCHNEIDER ELECTRIC Infrastructure Business
This document is strictly confidential and its reproduction is restricted to the distribution list