You are on page 1of 42

QUESTIONS ON ARCHITECTURE

S. 1

QUESTIONS ON ARCHITECTURE

‘IT'S NECESSARY TO DEVELOP A PEDAGOGY ABOUT QUESTIONING. WE ARE ALWAYS APPLYING A


PEDAGOGY OF RESPONSE: TEACHERS ANSWER QUESTIONS THAT STUDENTS HAVE NOT ASKED’.

PAULO FREIRE

S. 2

QUESTIONS ON ARCHITECTURE

‘IT'S NECESSARY TO DEVELOP A PEDAGOGY ABOUT QUESTIONING. WE ARE ALWAYS APPLYING A


PEDAGOGY OF RESPONSE: TEACHERS ANSWER QUESTIONS THAT STUDENTS HAVE NOT ASKED’.

‘IF THE STRUCTURE DOES NOT PERMIT DIALOGUE THE STRUCTURE MUST BE CHANGED’.

PAULO FREIRE

S. 3

QUESTIONS ON ARCHITECTURE

‘IT'S NECESSARY TO DEVELOP A PEDAGOGY ABOUT QUESTIONING. WE ARE ALWAYS APPLYING A


PEDAGOGY OF RESPONSE: TEACHERS ANSWER QUESTIONS THAT STUDENTS HAVE NOT ASKED’.

‘IF THE STRUCTURE DOES NOT PERMIT DIALOGUE THE STRUCTURE MUST BE CHANGED’.

‘WHOEVER TEACHES LEARNS IN THE ACT OF TEACHING, AND WHOEVER LEARNS TEACHES IN THE ACT OF
LEARNING’.

PAULO FREIRE

S. 4

QUESTIONS ON ARCHITECTURE

EVERYTHING YOU EVER WANTED TO KNOW ABOUT ARCHITECTURE AND NEVER DARED TO ASK, EVEN TO YOURSELF!

S. 5

QUESTIONS ON ARCHITECTURE

HOW…?
WHY…?

S. 6

4 SESSIONS X 45 MINUTES/SESSION X 8 GROUPS X 2 QUESTIONS/GROUP = 16 QUESTIONS

S. 7
ACADEMIC YEAR 2021-2022

THEME

S. 8

ACADEMIC YEAR 2021-2022

COHOUSING TIME FEELING



ACADEMIC YEAR 2021-2022

HABITATION

ACADEMIC YEAR 2021-2022

HABITATION FEELING

HOME
HOMING

S. 13
S. 14
What is home? Home sick

Where is home? Homeless

When is home? Home grown

Who is home? Home run

Bring it home

Home Depot

Home (webpage)

Apple Home (app)

Apple Homepod

S. 15

FEELINGS

S. 16
The nature of feelings. Evolutionary and neurobiological
origins.

Feelings are mental experiences of body states.

They signify
physiological need: hunger
tissue injury: pain
optimal function: well-being
threats to the organism: fear or anger
specific social interactions: compassion, gratitude or love

FEELINGS

S. 17

Feel

sad

tired

hungry

pain

good

FEELINGS scared

love

at home

S. 18

Feel

sad

tired

hungry

pain

good

FEELINGS scared

love

at home

S. 19

Feelings are complex.

You can feel happy, nervous and tired at the same time.

Probably feeling at home, or feeling home, is one of these


feelings made of several feelings.

FEELINGS

S. 20

How does it feel to be at home?

Under which circumstances can one feel home?

Is feeling home just a sense of place?

Can we describe this feeling?

What are its causes?

Can we design this feeling?

FEELING (AT) HOME Can we design this feeling through a built habitat?

Can we design this feeling in a new collective housing


building in a new neighbourhood?

Does this concern architects?

S. 21

SPRING ASSIGNMENT

THE HOMING CHOICE

S. 22

“One might suppose that the ultimate home is one that you
do not need to leave or travel to”

Bernd Heinrich, The Homing Instinct

THE HOMING CHOICE


HOUSES IN LISBJERG

S. 23

Stay at home

THE HOMING CHOICE


HOUSES IN LISBJERG

S. 24

THE HOMING CHOICE


HOUSES IN LISBJERG

S. 25

THE HOMING CHOICE


HOUSES IN LISBJERG

S. 26

U dvi k l i n g sp l an
Lisbjerg – en del af Aarhus midt i landskabet
December 201 7

SITE
LISBJERG UDVIKLINGSPLAN
PLOT E.1.36

S. 27

E45
Universitets- Lisbjerg
Hospitalet
Ringvejen

e rsvej
Rand Risskov
Vestervang
Universitetsparken
Trøjborg
Aarhus C.
Domkirken Aarhus Ø
DOKK1

Arealer til boliger og erhverv


Det samlede boligareal for Lisbjerg udgør
ca. 1 mio. m² svarende til 140 fodboldbaner,
der vil skulle rumme op til 25.000 nye

SITE indbyggere. Med en udviklingsperiode


på forventeligt op til 65 år svarer det til
gennemsnitligt ca. 400 nye indbyggere pr. år,
LISBJERG UDVIKLINGSPLAN hvilket igen svarer til en årlig tilvækst i
boligareal på gennemsnitligt ca. 16.000 m².
Dertil kommer et erhvervsområde på mere end
PLOT E.1.36 250.000 m², der udbygges sideløbende.

INDLE DNING UDVIK LINGSPL AN F OR LIS BJE RG 9

S. 28

Det gyldne alter fra Lisbjerg Kirke


Det enestående, gyldne Lisbjergalter, der i dag befinder sig på Nationalmuseet, stammer

SITE fra 1100-tallet. Det er et af kun 17 bevarede af sin slags på verdensplan og fortæller om
den tidlige kristendoms historie i Danmark.

LISBJERG UDVIKLINGSPLAN
PLOT E.1.36
Lisbjergs historiske stjerneudskiftning

I NDL EDNING UDV IKL INGS PL AN FOR LISBJ ERG 13

S. 29

overordnet disponering af Lisbjerg

Randersvej
Kraftvarmeværk

Bol
ig

Bolig
lig
Bo
Lisbjerg Kirke

Bo
lig

lig
Bo

/Er
erv

hv
Er hv

er
ig/

v
l
Bo
Lisbjergskolen

erv
hv
Er
SITE Erh
Klo
khø
jen

Bolig
Bolig

ver /Erh
v

LISBJERG UDVIKLINGSPLAN Samlet udviklingsområde

Bolig/Erhverv
Randersvej

Lisbjerg Bygade
verv

Erhverv Klokhøjen Erhverv

PLOT E.1.36

Mo
15 min. med letbane

20 min. - supercykelsti
Boliger Letbane

til Aarhus C

til Aarhus C

d
Aar
Etape 1 Supercykelsti

hus
Bymidte Stjerneudskiftning

Loop

Grønne område

D ISPOSITIONSPL ANEN F OR LISBJ ERG UDV IKL INGS PL AN FOR LISBJ ERG 15

S. 30

SITE
LISBJERG UDVIKLINGSPLAN
PLOT E.1.36
View mod Bagsti, Bynatur og havezoner

D ELST RATE GI 4 - NATUR- OG L ANDSKABSKVALITE T UDV IKL INGS PL AN FOR LISBJ ERG 37

S. 31

etapeplan
I overensstemmelse med planlovens ”indefra og
ud-princip udbygges Lisbjerg i første omgang i for-
Lisbjerg Skov længelse af den allerede igangsatte etape 0 rundt
Ny Høgemosevej om de vestlige og sydlige sider af den eksisterende
landsby.
Etape Nord
I denne etape 1 vil den vestlige side primært udgøre
en boligbydel med tilhørende funktioner i form
af institutioner, byrum, legepladser og lignende,
mens den sydlige side vil rumme de kommende
Lisbjerg Kirke
Etape Øst bymidtefunktioner. Derved sikres sammenhæng
Etape 1 mellem udbygningen af områdets infrastruktur og
AL2 udviklingen af delområder i den nye by. Denne første
Etape 0 etape forventes at være fuldt udbygget frem imod
Etape Vest Lisbjerg Skole Kirke
stien 2026 og her rumme op til 8.000 nye indbyggere og
Ringgården
et betydeligt antal arbejdspladser.
gade
rg By
Lisbje

Ran
Rækkefølgebestemmelsen i udbygningen af de

der
sve
efterfølgende etaper (øst, vest og nord) vil afhænge

j
af blandt andet konjunkturer, efter-spørgsel,
Etape 0 Randersvej
bæredygtighed i udbygningen samt funktions-
Etape 1 Lisbjerg Bygade
delinger med bysamfundene syd og øst for Lisbjerg.
Klokhøjen
Etape Nord Kirkestien
Etape Erhverv Stillingtagen til rækkefølgen vil derfor blive taget

SITE
Etape Vest Ny Høgemosevej

Etape Øst Letbane


i forbindelse med igangsætningen af detail-
planlægningen for de kommende etaper

Mod
Supercykelsti
Etape Erhverv Supercykelsti

Aae
Letbane
Bymidte

hus
Fremtidig trafikvej

LISBJERG UDVIKLINGSPLAN Grønne område

Matrikel

Eksisterende bygninger
Fremtidig fordelingsgade

Fremtidig boliggade

Fremtidig stiforbindelse
Erhvervsetapen mod syd udbygges løbende.

PLOT E.1.36

E TAPE- OG TIDSPL AN UDV IKL INGS PL AN FOR LISBJ ERG 47

S. 32

etape 1 Re kr ea t iv t ba kk ela nds ka b

Illustrationsplan Lis bje rg sk o v

lokal plads
lokal plads
7P
Fæ lle s hu s
E.1 02 E.1 03
bagsti E.1 01

M eje ri p la d se n
E.1 06

bagsti lokal plads


L i sb j er g k i rk e

G rø n t lo o p
E.1 05 AL2

bagsti
E.1 04 E.1 36

E.1 09
lokal plads
MASTERPLAN 1/1000
20/03/2017
Lo ka l p l ad s
E.1 11 LENDAGER GROUP

Ba ne rn e K i rk e st ie n
E.1 08

B lå pla ds

E.1 07 E.1 10

Sk o le pa r ken

lokal plads
L is b je rg sk o l en
E.1 12 R a n der s v ej
S ko l epl a ds en lokal plads
C

E.1 35

SITE §3 beskyttet sø B y f æl led


E.1 13

E.1 14
L et ba ne s t o p
E.1 30
G rø n t b yr um

E.1 33
E.1 34

E.1 27

E.1 31 E.1 32

LISBJERG UDVIKLINGSPLAN Blandet bolig/erhverv


§3 beskyttet sø
E.1 15
E.1 16

L i sb je rg B yg a de
Pl a ds en
E.1 26

E.1 18 E.1 28
E.1 24

PLOT E.1.36 Le tb a ne s t o p
E.1 17 lokal plads

lsti
E.1 22
lokal pladsunderføring E.1 19

Udviklingsområde
lokal plads E.1 20

rcyke
§ 3 be sk y t t et s ø bro

Gr ø nt by r um E.1 25
E.1 29

Forskønnelsesområde

Supe
E.1 19
E.1 23

E.1 21

Bymidte
1:2000
§3 beskyttet eng L isb jerg - E ta pe 1 11

S. 33

ETAPE 1 Arealopgørelse Etape 1


DATO: 08.11.2017

Byggefelter i alt: 331.413 m2


Etagemeter i alt: minimum 233.900 m2 - maksimum 278.700 m2
Arealopgørelse Etape 1
Etape 1 Byggefelt DATO:
Bebyggelse (%) 08.11.2017
Etagemeter (m2) min-maks Anvendelse
E.1 01 43802 65-75% 28500 - 32900 bolig 1-3 etg.
E.1 02 15285 65-75% 9900-11500 bolig 1-3 etg.
E.1 03 10168
Byggefelter
65-75%
i alt: 6600-7600
331.413 m 2
bolig 1-3 etg.
E.1 04 27370 Etagemeter
65-75% i alt: minimumbolig
17800-20500 233.900
1-3 etg. m2 - maksimum 278.700 m2
E.1 05 14319 65-75% 9300-10700 bolig 1-3 etg.
E.1 06 14978 65-75%
Etape 1 Byggefelt 9700-11200
Bebyggelse (%)bolig 1-3 etg.
Etagemeter (m2) min-maks Anvendelse
E.1 07 15921 65-80%
E.1 01 4380210300-12700 65-75%
bolig 1-3 etg. 28500 - 32900 bolig 1-3 etg.
E.1 08 7751 65-75%
E.1 02 15285 5000-5800 65-75%
bolig 1-3 etg. 9900-11500 bolig 1-3 etg.
E.1 09 6254 65-75%
E.1 03 10168 4100-4700 65-75%
bolig 1-3 etg. 6600-7600 bolig 1-3 etg.
E.1 01 E.1 02 E.1 03
E.1 10 4092 65-75%
E.1 04 27370 2700-3100 65-75%
bolig 1-3 etg. 17800-20500 bolig 1-3 etg.
E.1 11 6224 65-75%
E.1 05 14319 4000-4700 65-75%
bolig 1-3 etg. 9300-10700 bolig 1-3 etg.
E.1 12 11309 65-80%
E.1 06 14978 7400-9000 65-75%
bolig 1-4 etg. 9700-11200 bolig 1-3 etg.
E.1 06
E.1 13 13904 65-80%
E.1 07 15921 9000-11100 65-80%
bolig 1-4 etg. 10300-12700 bolig 1-3 etg.
E.1 05 E.1 14 5022 80-100%
E.1 08 7751 4000-5000 65-75%
bolig/erhverv 2-5 etg. 5000-5800 bolig 1-3 etg.
E.1 04 E.1 09 E.1 15 7399 65-80%
E.1 09 6254 4800-5900 65-75%
bolig 1-4 etg. 4100-4700 bolig 1-3 etg.
E.1 01 E.1 02 E.1 03 E.1 16 7939 80-100%
E.1 36 E.1 10 4092 6400-7900 65-75%
bolig/erhverv 2-5 etg. 2700-3100 bolig 1-3 etg.
E.1 11
E.1 08 E.1 17 7506 65-80%
E.1 11 6224 4900-6000 65-75%
bolig 1-4 etg. 4000-4700 bolig 1-3 etg.
E.1 18 6554 80-100%
E.1 12 11309 5200-6600 65-80%
bolig/erhverv 2-5 etg. 7400-9000 bolig 1-4 etg.
E.1 06
E.1 07 E.1 10 E.1 19 10503 65-80%
E.1 13 13904 6800-8400 65-80%
bolig 1-4 etg. 9000-11100 bolig 1-4 etg.
E.1 05 E.1 20 5640 80-100%
E.1 14 5022 4500-5600 80-100%
bolig/erhverv 2-5 etg. 4000-5000 bolig/erhverv 2-5 etg.
E.1 04 E.1 09 E.1 21 7746 65-80%
E.1 15 7399 5000-6200 65-80%
bolig 1-4 etg. 4800-5900 bolig 1-4 etg.
E.1 12 E.1 22 4542 80-100%
E.1 16 7939 3600-4500 80-100%
bolig/erhverv 2-5 etg. 6400-7900 bolig/erhverv 2-5 etg.
E.1 36
E.1 11
E.1 08 E.1 35 E.1 23 7075 65-80%
E.1 17 7506 4600-5700 65-80%
bolig 1-4 etg. 4900-6000 bolig 1-4 etg.
E.1 13 E.1 34 E.1 24 5355 90-110%
E.1 18 6554 4800-5900 80-100%
bolig/erhverv/detail 2-5 etg.
5200-6600 bolig/erhverv 2-5 etg.
E.1 14 E.1 27
E.13310
E.1 E.1 25 5313 65-80%
E.1 19 10503 3500-4300 65-80%
bolig 1-4 etg. 6800-8400 bolig 1-4 etg.
E.1 30E.1 07
E.1 16 E.1 31 E.1 32 E.1 26 E.1 26 9250 90-110%
E.1 20 5640 8300-10200 80-100%
bolig/erhverv/detail 2-5 etg.
4500-5600 bolig/erhverv 2-5 etg.
E.1 15 E.1 27 6578 90-110%
E.1 21 7746 5900-7200 65-80%bolig/erhverv/detail 2-5 etg.
5000-6200 bolig 1-4 etg.
E.1 12 E.1 28 4747 80-100%
E.1 22 4542 3800-4700 80-100%
bolig/erhverv/detail 2-5 etg.
3600-4500 bolig/erhverv 2-5 etg.
E.1 17 E.1 18 E.1 24 E.1 28
E.1 22 E.1 29 5824 80-100%
E.1 23 7075 4700-5800 65-80%
bolig/erhverv/detail 2-5 etg.
4600-5700 bolig 1-4 etg.
E.1 20 E.1 35
E.1 13 E.1 34 E.1 30 5043 80-100%
E.1 24 5355 4000-5000 90-110%
bolig/erhverv/detail 2-5 etg.
4800-5900 bolig/erhverv/detail 2-5 etg.
E.1 14 E.1 29 E.1 27 4533
E.1 19 E.1 25 E.1 33 E.1 31 80-100%
E.1 25 5313 3600-4500 65-80%
bolig/erhverv/detail 2-5 etg.
3500-4300 bolig 1-4 etg.
E.1 21 E.1 23 E.1 30
E.1 31 E.1 32 E.1 32 4315 80-100%
E.1 26 9250 3500-4300 90-110%
bolig/erhverv/detail 2-5 etg.
8300-10200 bolig/erhverv/detail 2-5 etg.
E.1 16 E.1 26
E.1 15 Etape Nord 1:6.000 E.1 33 6073 90-110%
E.1 27 6578 5500-6700 90-110%
bolig/erhverv/detail 2-5 etg.
5900-7200 bolig/erhverv/detail 2-5 etg.
E.1 34 3357 90-110%
E.1 28 4747 3000-3700 bolig/erhverv/detail
80-100% 2-5 etg.
3800-4700 bolig/erhverv/detail 2-5 etg.
E.1 17 E.1 18 E.1 24 E.1 28
E.1 35 4549 90-110%
E.1 29 5824 4100-5000 80-100%
bolig/erhverv/detai 2-54700-5800
etg. bolig/erhverv/detail 2-5 etg.
E.1 20 EtapeE.1
1 22
E.1 36 5173 65-75%
E.1 30 5043 3400-3900 80-100%
bolig 1-3 etg. 4000-5000 bolig/erhverv/detail 2-5 etg.
E.1 29
Byggefelter E.1 25 E.1 31 4533 80-100% 3600-4500 bolig/erhverv/detail 2-5 etg.

SITE
E.1 19 E.N XX
E.1 21 E.1 23
E.1 32 4315 80-100% 3500-4300 bolig/erhverv/detail 2-5 etg.

Etape Nord 1:6.000 E.1 33 6073 90-110% 5500-6700 bolig/erhverv/detail 2-5 etg.
TOTAL 331413 E.1 34 min. 233925
3357- max. 27874090-110% 3000-3700 bolig/erhverv/detail 2-5 etg.
E.1 35 4549 90-110% 4100-5000 bolig/erhverv/detai 2-5 etg.
Etape 1
E.1 36 5173 65-75% 3400-3900 bolig 1-3 etg.

LISBJERG UDVIKLINGSPLAN E.N XX Byggefelter

TOTAL 331413 min. 233925 - max. 278740

PLOT E.1.36

38 L isb jerg - E ta pe 1

S. 34

The program of this semester will be a group of several homes, where a bunch of people who want or have to
spend a long time at home have joined forces to nd an architect who will design a community responding to
their speci cities. The architect they chose is you.

Your project should accommodate the needs of the following citizens:


-A widowed retiree with no family or friends.
-A truck driver who has been paralysed from the waist down due to an accident.
-A refugee family that has recently arrived to Denmark (couple with two children of ve and 12 years old and a
grandmother).
-A young couple with one and three year old children who have decided to do homeschooling.
-An engineer who is a wind energy consultant and works from home.

You can choose if each of those live alone or with others, and their gender and place of birth. However, at least
one of the inhabitants is born and raised in Lisbjerg.

You should choose the occupations and/or characteristics of other ve inhabitants for whom you design the
houses, with the premise that each spends most of her or his days at home.

PROGRAM

S. 35
fi

fi

fi

fi

However, there are guidelines that should be followed:

- Number of units: between 20 and 30


- You should follow the guidelines established at the Udviklingsplan for Lisbjerg
- The structure should be mainly built out of wood
- The empty space close to your building and within your site is also part of your proposal, including the public
space suggestes in the Udviklingsplan.

From these initial requirements, each student should develop her/his own speci c program that responds to her/
his approach to the assignment.

As an opportunity to further develop the knowledge on timber building systems, we encourage you to use wood
as the structural material.

PROGRAM

S. 36

fi
SF Special Focus
Third semester (Special Focus) students will work on a project which shares the area and theme of the rst and
second semester students assignment. However SF have slightly different guidelines, on top of the ones for 1 and
2 semesters:

- The project needs to include a common facilty for the neighbours (your own project and the whole Lisbjerg).

- You can choose a different site within Lisbjerg’s new development area, included in phase 1 of the
Udviklingsplan.

SF students will exercise critical and re ective writing within the thesis format. This includes the preparation of a
Summary Report.

PROGRAM SF

S. 37

fl
fi

Process
The semester is divided in ve phases:

Phase 1: Contextual analysis. Understanding the place.


- One drawing that explains the main quality you have discovered while visiting the site.

Phase 2: Diagnose, strategies and exploration of architecture ideas


- Diagnose and critical revision of the commission and its requirements in light of the learnings of Phase 1.
- Study of relation with the surroundings (site, neighbourhood, town, region).
- Exploration and de nition of the fundamental architecture ideas, also but not exclusively related to the theme of
feeling at home.
- Development of strategies that will guide the project’s materialisation.
- De nition of the new neighbourhood’s inhabitants.
- Analysis of a case study of your own choice relevant to the assignment, through a 1:20 scale model of a room
within that case that explains the main idea contained in it.

Phase 3: Design development


- Analysis and development of program.
- Diagrammatic study of spatial organisation.
- Detailed de nition of between 5 to 10 living units and its immediate surroundings, which include half of the
inhabitants suggested in the assignment, and the other half of your choice.
- Model study of building volume/s and context.
- Process models and drawings.

Phase 4: Systems de nition


- Study and de nition of the building’s anatomy as a whole. Building systems.
PROCESS - Detailed study of the building’s physiology and how it is inhabited. Energy and uids.

Phase 5: Critical revision and communication


- Critical revision of the whole project in its various scales.
- Graphical and oral communication of the project.

S. 38
fi

fi
fi

fi
fi
fi



fl

Final requirements
Site
- Context plan, e.g. 1:2000
- Site plan w/ roof plan, e.g. 1:500
- Exterior spatial representation (collage, watercolour, rendering, model pictures etc.)

Building
- Plans, sections and elevations 1:100
- Diagrams / Sketches
- Physical working volumetric model in context, 1:500

Living units
- One unit plan and sections, 1:50
- Interior spatial representation (collage, watercolour, rendering, etc.)
- Physical model of one unit, 1:50

Process material
-Models
-Most relevant sketches, plans etc…

SF Summary report
Summary report (maximum 25 pages): The report should present the background studies on which the project is
based, summarised in the form of a document that can inform the conclusion of the project. The report should not
exceed 2000 words and comprise more than 25 pages including text and optional supporting material in the form
of illustrations, photos, drawings, etc. The summary report should brie y address:
- The relevance of the assignment (Why?)
FINAL REQUIREMENTS - Description and delimitation of the program (What?)
- Re ection on the chosen location (Where?)
- Method to develop the assignment (How?)

S. 39
fl

fl

SPRING ASSIGNMENT

PHASE 1

S. 40

Phase 1: Contextual analysis. Understanding the place.

- One drawing that explains the main quality you have discovered while visiting the site that relates to the academic year’s
topic of ‘Feeling at home’.

Format: 1 DIN A1 portrait.

This phase will be carried in groups (8 of 3).


Pin-up
Friday, February 4
Seminarrum 2.4 12:30pm-2:30pm

PHASE 1

S. 41
TAK!
QUESTIONS?

You might also like