SITA Order Number IATA Created OOSD Oder Date COF Approval Date SITA OCDD RTDD Gold

RTDD Gold ref Carrier


PRIMARY CONNECTION
N-58116-60434-REV00 BOM 28/Sep/21 28/Sep/21 04/Oct/21 31/Dec/21 30/Mar/22 10-1287300 TATA (Via OBS)
N-58116-60399-REV00 BOM 27/Sep/21 27/Sep/21 29/Sep/21 05/Feb/22 30/Mar/22 10-1371232 TATA (Via OBS)
N-58116-60488-REV00 MAA 29/Sep/21 30/Sep/21 06/Oct/21 07/Feb/22 20/Mar/22 10-1287324 TATA (Via OBS)
N-58116-60190-REV00 MAA 22/Sep/21 22/Sep/21 28/Sep/21 31/Jan/22 20/Mar/22 10-1370349 TATA (Via OBS)
N-58116-60487-REV00 HYD 29/Sep/21 25/Oct/21 02/Dec/21 07/Feb/22 25/Mar/22 10-1284937 TATA (Via OBS)
N-58116-47356-REV00 CCU 02/Dec/20 11/Dec/19 16/Dec/19 04/Mar/21 NA 10-1287330 TATA (Via OBS)
N-58116-65175 DEL 08/Feb/22 09/Feb/22 14/Feb/22 20/May/22 NA 10-1412973 TATA (Via SITA)
SECONDARY CONNECTIONS
N-58116-65021  BOM 03/Feb/22 03/Feb/22 10/Feb/22 15/May/22 NA 10-1410937 MTNL (Via SITA)
N-58116-65019 BOM 03/Feb/22 04/Feb/22 09/Feb/22 15/May/22 NA 10-1411085 MTNL (Via SITA)
N-58116-65023 MAA 03/Feb/22 03/Feb/22 09/Feb/22 15/May/22 NA 10-1410779 BSNL (Via SITA)
 N-58116-65025 MAA 03/Feb/22 04/Feb/22 11/Feb/22 15/May/22 NA 10-1412415 BSNL (Via SITA)
N-58116-65020 HYD 03/Feb/22 04/Feb/22 10/Feb/22 15/May/22 NA 10-1412098 BSNL (Via SITA)
N-58116-65022 CCU 03/Feb/22 03/Feb/22 09/Feb/22 15/May/22 NA 10-1410940 BSNL (Via SITA)
N-58116-65180 DEL 08/Feb/22 09/Feb/22 15/Feb/22 20/May/22 NA 10-1413208 MTNL (Via SITA)
App Router Name Hardware Status CCT EDD

Pre Fans PBOM2471 Delivered at site Pending EDD


Fans.X25 PBOM2780 Delivered at site Pending EDD
Pre Fans PMAA903 Delivered at site 15-Feb-22
Fans.X25 PMAA930 At Warehouse 15-Feb-22
Pre Fans PHYD462 Delivered at site 15-Feb-22
Pre Fans PCCU333 Delivered at site Delivered
Pre Fans PDEL2844 Reserved Pending EDD

Fans.X.25 PBOM2864 Reserved Pending EDD


Pre Fans PBOM2865 Reserved Pending EDD
Pre Fans PMAA957 Reserved Pending EDD
Fans-X.25 TBA Reserved Pending EDD
Pre Fans TBA Reserved Pending EDD
Pre Fans TBA Reserved Pending EDD
Pre Fans TBA Reserved Pending EDD
History

15-Feb: As received the call from TCL that MIAL Debashish called to the TCL as they can't submit the BG on letter
head so, TCL requested to provide the old payments details of any thing made on past then MIAL agreed and told
15-Feb:
that he will As received
provide the the same, call from Next TCL actionthat MIAL pending Debashishfrom MIAL. called to the TCL as they can't submit the BG on letter
head
10-Feb: so,TCL TCLhas requestedcompleted to provide its task the
and old
only payments
pending details
for the of any thing
07-meter made onwork
trenching pastwhich then MIAL requires agreed and told
15
that Feb:
he Power
will provideissue the observed same, at
Next customer
action end on 3rd
pending from floor MIAL. ,expected to be resolved by this week endBank - Feb
Guarantee,
18 .Post TCL Bank Guarantee
resolution of powerits format
issue is pending
carrier willpending from MIAL
complete configto provide and splicing on company and will letterhead.
take 4-5 days After completing the
10-Feb:
15 Feb: Power hasissue completed observed task and07-meter only for thework 07-meter trenching work which requires endBank
letter
14
Guarantee, Feb: head Thedoc. MUX
Bank
TCL will complete
installation
Guarantee isatplanned
format
customer
the
is forend
pending 14 fromon
and 3rd
trenching15.
MIAL
floor
Access to
,expected and POP
permission
provide
to
on
be
endhas
company
resolved
connectivity
beenletterhead. by
granted thisinweek 3-4TCL.
to After
days - Feb
and
completing
after
18
that
10-Feb: .Post
TCL resolution
plan
The MUXthe mux of
installation power
installation issue
is plannedcarrier
with will
customer
for 14 complete
and and 15. within config
Access next and week
permission splicing they has and
willbeen will
complete take
granted 4-5 thetodays.
circuit
TCL. delivery. the
15-Feb:
letter
14
07-Feb-22: Feb: head Port
TheBG doc.details
MUX TCL
format is
will
installation pending
and complete
bank to
is plannedshare
the 07-meter
details by
hasfor the LDM
14 and
already trenchingto
15.
been TTSL
Access
shared and
workpermissionafterthat
and
withPOP TCL, Cross-connect
endhasconnectivity
TCL beenThe
finance granted
team PO will
inisto
3-4 be
TCL. processed.
days and
reviewing to after
create
07-Feb-22:
Cross-connect
that TCLand plan Circuit
theat POP EDDend
mux is pushedexpected
installation towith 25th
to be Feb'22
completed
customer due
and to
inwithinpending
next 03is works
weeks .at POP
Post end.
cross-connect MUX installation
implementation was (mux
10-Feb:
the DD
03-Feb-22:
planned The
for MUX
expected
Migration
7th Feb'22installationresponse
completed.
but LCON istimeplanned
SITA
didn't SAT for
is Wednesday
arrange 14 and
shared 915.
and
access. Feb. Access
waiting
New Thisnext datefor
week
permission
for 7being
approval
is meterthey has to
will
checked been
trenching
close
completegranted
the
with approval.
order
LCON.
thetoin circuit
TCL.
HW POP
tool. EDD
delivery.
end is 8th
installation
07-Feb-22:
07-Feb-22:
configuration nottoformat
BG
Circuit required
be EDD done and
is )once
within
bankcable
pushed 01-2
details
to 25th
is weeks
has Feb'22
joined ,circuit
already
from due to
been
to
manhole. be
pendingdelivered
shared withatTCL,
works site
at POPTCL end. finance The teamMUX isinstallation
reviewing to was create
04-Jan-22:
Feb'22.
10-Feb:
the DD and Case
The Migration
handed
circuit
expected EDD completed.
over revised
response to ESD time Order
team
todidn't
1stis week is ready
for further
Wednesday of for
Mar'22 closure.
escalation.
9 Feb. due to
This pending
is to
foris 7being cross
meter connect
trenching challenge
approval. at POP
POP end.
end
15-Feb-22:
planned
03-Feb-22:
Need
04-Feb-22: forCircuit
to discuss 7th
Cabling
Circuit Feb'22 order
further.
EDDwork but
is isispushed
placed
LCON
completed towith 25th TATA
arrange
from Feb'22 and
MIAL they
access.
entrancetoraised New gateissue
date with
customer addresschecked
rack mismatch.
onThewithboth LCON.It is
floors, being
HW only EDD the isis78th mtr
07-Feb-22:
configuration
investigated(Re-feasibility
Feb'22.
trenching Case The
work tois
handedcircuit
be done
pending EDD
over once revised
raised
to
as ESD
MIALcable by to
team
is 1st
isagain
TATA). joined
for weekIHW- from
further
asking ofdue
OTCmarch
for manhole. PO
escalation.
the
pending
due
has
DD Cross
been
Bank
works connect
generated
Guarantee
at POP end.
challenge
and
hence shared atMUX
TCL Control-S
iswith
installation
working WAISL. DC upon with
SITA
being
itCarrier
need
with to
16-Dec:
planned
TTSL. IHW Migration
for 8th
isCabling
fully Feb'22. completed.
completed. Order
Case handed is ready over for toclosure.
ESD team for to further
03-Feb-22:
sign
theirthe
04-Feb-22:
09-Dec: Finance ServiceCircuit
Migration team RequestEDDwork
butcompleted
completed is ispushed
itsForm completed
expected to to
for add toIHW
25th
PCCU333.
from
be Feb'22MIALin
MRC
completed
4G SIMdueentrance
existing
to
within pending gate
contract
this works
week customer
with atescalation.
once &WAISL
POP rack
the isend.for
DD onbackoffice
The both
submit MUX floors, only
connectivity.
installation
toCircuit
MIAL they thewill is7being
mtr
Once
03-Feb-22:
03-Feb-22:
trenching
signed,
planned
provide they
for
the
The
IHW
work will
8th
permission
carrier
isisproceed
fully
pending
Feb'22. completed.Carrier
copy as to
with MIALdelivery.
TCL.
Fiber
is again pulling stillwork
isasking forcard
working for
theboth removed
on
DDthe PMAA903
Bank and
circuit
Guarantee router PMAA930.
provisioning up with
hence forTCL ATCL
Circuit and
is EDD
B end
working isnow.received
connectivity.
upon it with
15-Feb-22:
07-Dec:
around
EDD 15th
isFinance
15th COF
Migration Feb'22.
Feb. is approved.
Thereisbut planned
The itsisMUX
are some Router
for 9thto
installation name
Dec'21 generated.
is @14:00
being IST.
planned CCT SITAordering
and FEOBS is done.
is arrranged
access request MTNL
for the
submittedhas shared
migration. for a
7th document
Feb'22 to be to
their
10-Feb-22:
03-Feb-22:
31-Jan-22:
filled
02-Dec:
LCON/TPM.Access and The
The
signed.
Migration
team
Circuit carrier
agreement
VMOorder
plan
required completed
is
is
expected
placed
copy
checking
under at both islegal
with
Fiber
ready
with
discussion
2nd
issues
be
TATA
pulling
and
the
and with
at work
completed
and
with
exact
3rd
POPthey
OBS. MIAL end
within
for
requirement raised
Router
Floor.Separate
hence
both
now. this
issue
isTCLand
up
week
PMAA903
MUX with
isand is working
ready
ETA
once
address
is&16th
running
will with
be
the
PMAA930. toDD
1.5L resolve
mismatch.
Feb'22.
with
installed
submit
DD
TCL Circuit
at but it.to
circuit.
2nd
MIAL
Itstamp
is
EDD
and being isisthey
3rd missing
Floor.
will
investigated.
received and
31-Jan-22:
provide
15-Feb-22:
IHW-
around
expected OTC the
15th to IHW
PO permission
COF
be has
Feb'22. is
is fully
approved.
been
stamped The completed.
copy
generated
MUX
by toinstallation
Router
tomorrow. TCL. Carrier
and name shared
Once will
is complete
generated.
with
being
done- WAISL
planned
TCL CCT circuit
will ordering
andand
complete provisioning
MRC
access is
SOF done.
the tois
request be
build bygenerated
MTNL end
submitted
work hasof(IHW)
this
shared month
manual
forby aend
7th . of
document
and EDD
Feb'22 istoweek
uploaded
this 15th
to beFeb. in
or
14-Feb-22:
28-Nov:
TCL
Follow
31-Jan-22: team Router
upnext COF
details
toThe be is :
done apporved.
installation
agreement today. copy Router
completed. is ready name Routerto
andWAILS be is generated.
live
withFloor.Separate
MIAL with now. TCL CCT TCL ordering
circuit.
is ETA
readyRanjan with done.
to advise
1.5L DDat how
but we
stamp can do
is missing the and
filled
Domestic
LCON/TPM.Access
latest
08-Feb-22:
Migration
Mr. Janakiraman-9840496367/8667474216, and
by signed.
Connect
New
from week. 4G VMO
order for
required
to is
has
TCL checking
non-standard
been at
circuit. both placedwith billing.
2nd the
and
to OBS exact
3rd and requirement
shared
SITA PO agreement
is andMUX
created to
will
and is 16th
signed
beshared Feb'22.
it.
installed SOF
with is
ISP pending
2nd and
supplier. from
3rd VMO.
Floor.
15-Feb-22:
27-Jan-22: COF
IHW is approved.
: fully completed. Router name
Carrier generated.
will complete TCLCCT Ordering
circuit is the
provisioning done and
by to endBSNL has
ofcreated.
this asked to.OTC fillthis
and sign the
expected
14-Feb-22:
08-Feb-22:
TCL
ESD
04-Feb-22: team
will follow to be up
COF
CPQ
details
New
stamped
is
quoteapporved.
orderwith is
Mr.
has
by Shailesh
tomorrow.
approved.
been Router placed name
Ranjan
from Once
to to
TCL
OBStodone-
be
raise
on generated.
the
stampping will
order complete
CCT
andwith ordering
backOBS and
gaurantee build
is done.
PO work be
related (IHW) tomonth
byIHW
DD. end
toMr.
EDD
of +91- is week
PO 15th Feb.
or
23-Nov:
Mr.
documents
20-Jan-22:
latest
08-Feb-22:
generated
Mr.
9167659090.
Parthiban
by Router
next before
IHW
New
and week. installation
9566005342
OFC
order
shared
Janakiraman-9840496367/8667474216,
If there
proceeding
cable
anyhas
with is completed.
been layed
WAISL
backend
further. between
placed
supplier
activity,
Router
to OBS AAIand
but
TCL
israck
and
they
to
live SITA
SITA
start
with
till
are
ISPTCL
TCL
PO
demanding
right
PO
MUX
is
created.
circuit.
created
away. for
A
, splicingand
TPM
call
MRC andtohas
sharedPO
be
as
been
scheduled
termination
withwell
asked
ISP
to
with
will
supplier.
proceed
place
be the
aSE/Tim/Sunil
completed
further.
ISP byto
MRC
15-Feb-22:
request
handover
Hardware
14-Feb-22:
20th Janto COF
the
this
Status:
COF
evening. is Router
supplier
connection
is approved.
apporved.
The and to
provisioning Router
secure
toShailesh
SFA.
beRouterstaged the name
name
expected EDD.
before to by
to be
sending
be generated.
generated.
end ofto thissite. CCT
CCT
month. Ordering
Vanilla
ordering isis done.
configuration
Telco to done
be and
alerted BSNL
is pendingfor has
expeditefromasked CPTA. to fill
delivery. TPM andis
ESD
04-Feb-22: will
the follow New up orderwith Mr.
has been placed from to TCL
OBS onand stampping
SITA ISPTCL and
PO back
created. gaurantee related toto DD. toMr. +91-
PO
Mr.
27-Jan-22:
sign
03-Feb-22:
01-Nov:
working
08-Feb-22:
Escalation
9167659090.
15-Feb-22:
can't
Parthiban be
with generated
TCL
documents
Router New
New
closed
COF
9566005342
LCON
If
had order
order
there
is from
started
installationbefore
to
approved.
as
has
provide
anyhas
ESD
MRC the
been
side
backend
charges
proceeding
been work
completed.
GSTN
Router
created
placed
now
of to
number
usual
activity,
name
fiber
to
be
further.
and
Router
OBS
added
cable
will
follow
toTCL to
be
isto
and be
live
get ups
start
generated.
in
clamping
placed
the
SITA withAQM.
can router
PO
right be is
Once
along
with OBS
circuit.
done
away.
CCT shipped
created
done-
the
by
Ordering andtoTPM
wall
+aPM/PC. we
Supplier.
theas
shared
is
has
will
done
per
site.
ForPObeen
proceed
customer
with
and
needs
Cabling
asked
ISP
BSNL
to raise
rqst
be
supplier.
vendor
has
place
the
, for
created
asked
the
please
theand
PO
to
7andISP
meters
connect
fill and
share
send
request
with
Hardware
Digging
14-Feb-22:
to
26th WAISL.
supplier. to the
Status:
permission
Oct :InstalationCOF supplier
is Router
from
apporved. and
iscompleted to
MIAL
planned secure
beRouterstaged
is still
for the
28thname EDD.
before
awaited Oct to sending
,all
be
at work necessary
generated.
06:30 GMTto site. Vanilla
documents
CCT ordering configuration
are is submitted
done. is pending
to MIAL from
by TCL. CPTA. and TPM
MIAL is
27-Jan-22:
04-Feb-22:
with
27-Jan-22:
sign
03-Feb-22: SHiva
the The
:New
TCL
documents
New
carrier
8790903391
had order
order started
before has
has been
and the for
proceeding
been work Fiber
placed
local
created of pulling
to
site
fiber OBS
further.
and support
cable
willand be
for
SITA
regarding
clamping
placed ISPfor
both PO AT
PMAA903
billing
along &the
created. Final
please
wall &config.
toTPM
PMAA930.
take
as has
per been
support
customer Circuit
asked
from EDD
rqstto , is
Bhanu forreceived
place theand
Prakash
the 7ISP meters( SITA
working
shared
08-Feb-22:
31-Jan:
14th
around
15-Feb-22:
request Oct with
the
Order
15th
to: IHW
OBSform
New
COF
the
LCON
to PO
is for
order
be
Response
Feb'22.
supplier
generated
to bank
created
approved.ODM provide
has
and guarantee
been
awaited and
requested and
GSTN
Router
secure placed
forshared
the
number
,Instalation
As
LDM
name to
with
EDD.
with
discussed
OBS
to to WAISL
and
supplier
ship
be get
. the
generated.the
with
SITA + routerTCLwith
limited
router
PO
OBS is
onthey
CCTon to OBS
start
shipped
created
1st will
site. +submit
Feb'22.
Ordering
Supplier.
the
and work.
the
shared
is donesite.
the PO
They
BG
with
and
needs
will
soon ISP
BSNL
to
start be
supplier.
has
created
work
asked
once
to fill
send
payment
and
Employee).
Digging Emails
permission are
from already
MIAL shared.
isplaced
still awaited ,all necessary documents are submitted to MIAL
14-Feb-22:
to
is
27-Jan-22:
TCL
04-Feb-22:
27-Jan:
HW
25-Jan-22:
sign
03-Feb-22:
18-Jan-22:
supplier.
cleared.
Email
theOrder
Delivered ID COF
New
The
New
The
documents
New
PO to
at
has
isorder
order
carrier
be apporved.
Site
carrier
orderbeen .to
created
before TATA be
completed
:PradeepR.Yadav@tatacommunications.com;
has
completed
has been
assigned
Router
raised
and
Has
proceeding
been
in name
Fiber
delivered
Fiber
created
for
tool
the
by toRanjan.
pulling
to
with OBS
the
pulling
further.
and
vendor
be work
and
supplier
CCT
willwork
generated.
be
and as Last
for
SITA
for+well
placed
as OBS quote
both
ISP
both
per
CCT
PO
on
SRF2
with
PMAA903
.AMRAPALI
vendor
ordering
was
created.
28th
PMAA903 shared
OBS
expired
Jan'22.
they +submit
&
KADAM
&. is
TPM IHW done.
and
PMAA930.
PMAA930.
Supplier.
will behas aSE
been
Completed.
PO
starting
isCircuit
working
asked
Circuit
needs the toby
EDD
Instalation
to delivery
IHWbe
TCL.
extend
is
place
workprogress
created
and
receivedtheISP
the
awaited
from
MIAL
and20th
expiry.
send.
to
shared
08-Feb-22:
31-Jan:
02-Feb:
around
Amrapali.Kadam1@contractor.tatacommunications.com
15-Feb-22:
request the
Order
IHW
15th
to form
New
COF
the PO to
Feb'22. is for
order
be
requested
supplier pending bank
created
ODM has
and guarantee
been andEDD
raised
requested
from
secure placed
OBS.for
the ,WAISL
As
LDM to
Router
EDD. discussed
with OBS
to and
supplier
limited
ship
name the with
SITA
to +be
under routerTCL
PO
OBS PR is
onthey
generated. oncreated
ID:1st will
Feb'22.
5868.
site. CCTand The shared
ordering the
cost BG
with
centre
is soon
done. ISP
used supplier.
CCT as 26321
ordering and is done.
20-Jan:
be
14-Feb-22:
to
Feb
TCL shared
supplier.
Onwards
Email BSNL by
ID COF quotes
next
with is week.
apporved.
expectedare available
Circuit
:PradeepR.Yadav@tatacommunications.com; Router
completion and is
name to be
pending.
dateto updated
be
of Hardware
generated.
28th in
Jan. tool to within
CCT be
AMRAPALI today.
shipped
ordering KADAM to
isRanjan
the
done. site.can proceed with ordering now.
04-Feb-22:
27-Jan:
requester
25-Jan-22:
Phone
MTNL
03-Feb-22: Order
no.
has as New
The
Pradeep
shared
New toteam
Prem order
be
carrieramadala
order created
:document has
completed
9415721356
has been
been and
(Only toat placed
for
beFiber
created OTC,
filled to
with OBS
MRC
pulling
and
and and
supplier
PO
work
signed.
will be SITA
will for+VMO
placed be ISP
OBS
both PO
on
raised
is created.
28th
PMAA903
checking Jan'22.
differently TPM
&
with as
PMAA930.
thehas
per been
exactYassine). asked
Circuit
requirement to place
delivery and the
progress
ETA ISPissendto
16th
SLA
20-Jan-22:
08-Feb-22:
31-Jan:
13-Jan-22:
Amrapali.Kadam1@contractor.tatacommunications.com
request
20-Jan:
documentation
Order
toby
BSNL
TCL
New
IHW
the to order
be
quotation
supplier
quotes
to has
created
are
becompleted
has
and
done
been
has and
arebeen
secure
available
later
placedthe
and
Fiber
shared, stage.
to
with
EDD.
to be
laying
OBS and
supplier
once
updated
work
POSITA +from
isin PO with
OBS
raised
tool
2nd
is
on for
within
OBS
and
created
1st +and
3rd
Feb'22.
vendor
today.
Supplier.
Floor
is IHW shared can PO
Customer beneeds
with ISP
completed to
server be
supplier. created
room
within till1-2 and
the Entry
week ,
31-Jan:
be
MIAL
Feb'22.
to
18-Jan:
gate,
04-Feb-22: shared Email
supplier.
aroundTATA
MTNL New next
id:60 %orderweek.
of details
Debasish.Mishra@adani.com
feedback Fiber
hasisCircuit
pending
laying
been
available.
EDDwork
placedfor istechnology
has
to
WAISL
pending. been
OBS and
IHW
Hardware
name
completed.
SITA
completion
and
ISP toPO IPbe
The detailscost
shipped
permission
created. to toRanjan
awaited
proceed
TPM the
for
has site.can
to
with
remaining
been
proceed
proceed
ordering.
asked 40% to
with
with Feedback
works
place
ordering
ordering. given
the ISP
now.
Rajan
by AAI
27-Jan:
Regarding
Phone
03-Feb-22:
SLA
to
20-Jan-22: Order
no.
documentation
share the Circuit
Pradeep
New
TCL to
quotes team be
order : created
provisioning
to9415721356
withhas has
be been
done
SFA
completed and
for from
at created
later
cost carrier with
and
stage.
approval.
Fiber end
laying supplier
will it is
be
work +
expected
placedfromOBS on
with
2nd to 28th
be
OBS
and Jan'22.
completed
+
3rd Supplier.
Floor by PO
Customer this needsJanuary to
server beend created
room , after
till that
and
the they
send
Entry
Phone
14-Feb-22:
31-Jan:
expected
and
request
20-Jan: carrierNo.
Order
toby
BSNL 9082179924
COF
the to
Thursday.
will isbeapporved.
complete
supplier
quotes created
are and the Router
and
works
secure placedthe name
within with
EDD. to
today.be generated.
supplier Postin + FiberOBS CCT
onlaying ordering
1st Feb'22.
activity isRanjan
done.
TCL will update next POA of link now.
need
MIAL
to
18-Jan:
27-Jan:
gate,
AAI
08-Feb-22:
27-Jan:
10-Jan:
implementation.
1Email
supplier.
contact week
aroundMTNL
TATA
Order
MTNL
id:
: 60
CPQ to
Rahul
to
quote
complete
Debasish.Mishra@adani.com
feedback
quotes %
quotes
be ofMauryadetails
Fiber
created
is isavailable
has
available
the
pending
are
laying
and
been
and
settings and
work
Hemantfor
available.
created
placed
and needs
to
at
has be
POP
technology
with WAISL
beenupdated
Ramchandani
and end(Data name
IHW
be completed.
approved.
tosupplier updated
tool
Center
and
+completion
:OBS on
inwith
within
IP
The
hemantr@AAI.AERO
Ranjan AQM
end)
details
28th
today.
cost,place
permission
will tool
Ranjan
to
Jan'22.to thewill
is proceed
awaited
proceedfor022
order
can
coordinate
with
to
remaining
26828123
with
further.
proceed
ordering.
proceed OBS40%with
SITA
with
with
and Feedback
works ordering
Rajesh/Akhilesh
ordering.
PO to
Sourcing givenbe by
is working AAI
03-Feb-22:
SLA
and
Phone
31-Jan:
expected
20-Jan: documentation
raise No.
Order
TATA the
by New PO
9082179924 order
request.
toescalated
Thursday.
quotes to
be created has
be
details been
done and
are at created
later
placed
available. and
stage.
with will
supplier
Ordering be placed
to +be OBS done on OBS
1st
once +
Feb'22.
IHW Supplier.
feasibility PO needs
completed to be created
from T-3 and
to send
and
25-Jan-22:
created.
20-Jan:
internally
13-Jan-22:
to carrier
supplier. BSNL will
ESD quotes
(TAT-10th
Build complete
work are
Jan). has the
available
Once
been works
case quotes to
and
started within
ODMto be today.
head
available
on siteupdated
from as
in Post we
AQM, in Fiber
are
12Jan2022 toolaSEnot laying
withingetting
will onwards activity
today.
prepare any , TCLCPQ
positive
Ranjan
the
LCON williscan update
feedback/progress
quotes proceed
providing next
and 3 POAordering
with
send
Days of
for onlink thisnow.
approval
permission order
per
18-Jan:
11-Jan-22:
AAI contact MTNL Advised feedback
: Rahul ODM
Maurya is topending
expedite
and Hemantfor thetechnology
port
Ramchandani name
provisioning and
:OBS , IP
IHW-
hemantr@AAI.AERO details
The to
person proceed who with
conducted ordering. the Feedback
site survey is
,27-Jan:
10-Jan:
customer
implementation.
03-Feb-22:
SLA
before
week
31-Jan:
expected permissions Order
MTNL
documentation
ording.
thus Order
rack.
by New
expected
to
quote
are be
already
order
toescalated
Thursday. be
created
tois is
circuit
created
available
be notshared
done and
created
delivery
and at placed
and
tolater
placed
needs
proceed with
as stage.
date AQMis
with 17th
supplier
toIBD beFeb
tool
supplier
updated
work is not +through
2022
+ are
in
updated
OBS ,not
on
Any
on
AQM 28th
wall tool
properly
delay
1st
Jan'22.
clamping.
Feb'22.in with022
topermission
proceed There 26828123
pricing. further.
is no
will DIAS SITA
update
further ticketSourcing
available
delay raised the isto working
weather
fix it.
expected
affacted
25-Jan-22:
20-Jan:
internally
ESD IHW from
BSNL ESD
(TAT-10th
update Covid
quotes : Md thus
are
Jan). Tanzir IHW
the
available
Once feasibility
case
from quotes to
and
WAISL ODMto report
be head
available updated
conducted andas
in qoutation
we
AQM, in
the toolaSE
feasibility is
within
will delayed.
getting today.
prepare
, as anyper positive
Ranjan
thehim CPQ they can feedback/progress
quotes
do proceed
have and thewith
send on
ordering
for
connectivity this
approval order
now.
-13-Jan-22:
TCL
31-Jan:
18-Jan:
circuit
,27-Jan:
10-Jan: SITA started TATA
MTNL
sourcing
delivery
Order
MTNL
Build
the quotes
to is work
work
feedback
date.
quote working
be on
created
is
has
details 21st
ofisSFA
available
been
with Jan
are
pending
and started
orfor
available.
supplier
placed
and not.
needs
on
to
with site
WAISL
technology
confirm from
supplier
toIBD beand IHW
name
the
updated
12Jan2022
completion
end
+through and
OBS in on IP 28th
AQM
onwards
details
connectivity cost
tool to
Jan'22. , LCON is(Mux
isinterface
awaited
proceed to providing
with proceed
ordering.
toupdate 3with
customer DaysFeedback permission
ordering.
room). Rajan per
06-Jan-22:
SLA
before
-between
week
20-Jan-22:
to
expected
Need
20-Jan:
permissions
documentation
share
SITA AAIording.
thus T-3
the
sourcing
BSNL by
HQ
Port are
PCCR2
expected
Required
quotes
Thursday.
details
iswork
already
working
intervention
quotes
to
room
circuitbe
documents
withare
carrier
shared
done
till
to
if
available forat
ATC
delivery
update
they
MUX
tonew
for
cost
can
and
proceed
laterdate
MIAL will
stage.
building
is
approval.
quotes
provide
to
be17th shared
permission
be in 2AQM
updated
work
Feb
Weeks
after
customer
2022
are
tool
in ,port
Any
submitted
for
permission
tool
provisioning
wall
rack
ordering.
within delay is
in byatinto
clamping.
one
today.
2nd
TCL
proceed
go onis There
floor
permission
Ranjan,
completed
in19th room
this
can
further.
is no
will
Jan
way no.
,further
proceedESD
we
SITA
from
218 Sourcing
Carrier
in available
delay
requested
can with
ACCthe
deliver
end
building
ordering AAI
isexpected
the
,working
ESD, is
weather
and
circuit
now.
internally
discussion
TCL
18-Jan:
-approaximatly started
SITAto MTNL
sourcing (TAT-10th
thethe IHW
feedback
is working Jan).
work on is Once
with
21st pending
with 2
Jan quotes
Vendors.
or
supplier fornot. available
technology
to confirm in AQM,
name
the end andaSE will
IPstart prepare
details
connectivity to the
proceed
interface CPQ with
on(Mux quotes and
ordering.
to customer sendFeedback for
room). approval
circuit
MIAL
27-Jan:
10-Jan:
04-Jan-22: delivery
expedite
Quote
MTNL BSNL isnew
date.
quote the
pending
quotes IHWispermissionof
are from
available 400Mtr MTNL
expected and would
process. +to
needs SLA
be be
As required.
per
confirmation.
to beback
received TCL
updated they
by Now
end can
in we
AQM
of need
this theto
tool
week. to decide
Wall proceed
SITA clamping
sourcing nextwork
further. action from
SITA plan. 21st
Sourcing Jan isonwards
working
withing
SLA
before
04-Jan-22:
20-Jan-22:
expected
-04-Jan-22:
Need
and SITA theyAAI
this
documentation
ording.
sourcing by
HQ
willAs month.ESD
TATA per
Required
Thursday.
plan isquotesLCON
working
intervention it
to
with
be
documents handed
Fiberdone
isAAIto
ifon IHW
update
available.
they
LCON.
atover
forlater
canis MIALthe
not
quotes
IHW
TCL provide
is
orders
stage.
available
permission
inpending
already 2AQM
feasibility Weeks and to
are
tool
to
having SITA
be
Bhupendra
for
permission
OFC TPM
submitted
ordering.
checked have by
through
inLCON
connectivity informed
one TCLgo on
SITA
via, in 19thLCON
CUTE
this
AERIAL Jan
wayfor ,toESD
that
route
connect
Fiber.
distance
we requested
can
from
with
calculations.
deliver
outside
Vinay
AAI
the the and
circuit
20-Jan:
internally
Kumar
11-Jan-22:
18-Jan:
-04-Jan-22:
MIAL
10-Jan: SITA
IHW to
to
MTNL
for
MTNL
sourcing
be (TAT-10th
speedy
Formal
expedite
MTNL done
feedback
feedback
is
quote by
the
Jan).
feedback.
approval
working SITA
is
is
is
permission
pending
Once
pending
with
either
available
quotes
permission
supplier
via
for
for
customer
process.
and needs
SLAto and
available
technologyis
confirm
As to
technology
wire
per
be
in
TCL
AQM,
name
the
or
updated from
they end
local andaSEbut
LCON IP quote
will
connectivity
supplier.
can
in AQM start
prepare
as
details details
Mukesh
the
tool to the
interface
Wall
to proceed
available.
submitted
proceed is CPQ
clamping with
(Mux
checking quotes
the
further. to
work
and
permission
ordering.
customer
customer from
SITA
sendFeedback
wire
21st
Sourcing
for
request
room). approval
option
Jan is toplant
onwards and
working
22-Dec:
withing
thus
18-Jan:
before
22-Dec:
thier ROW OBS
this
MTNL
ording.
OBS
management BSNL
withmonth.ESDBMCquotes
feasibility
feedback
feasibility on will11thare
report
handed
isnot
report expected
pending
Jan received
affect over
received
only this
for , to
the inbeorders
technology
in
details received
wireless
connection
wireless
of back only
name
Engineersonly byto
delivery end
for
and
for on allof
all,IP
Bhupendra this
the
once
thedetails
Carrier week.
sites
BMC
sites except
to SITA
permission
proceed
except
Letterhead sourcing
MAA.
MAA. are with is to
available
already connect
ordering. sharedthey with
Feedback will
with Vinay
just
LCON.
expected
-internally
Bhupendra
and SITA they sourcing by
will is Thursday.
(TAT-10th is
exploring
plan working
it with local
Jan). AERIAL AAIto
Once update
supplier
LCON. quotes quotes
TCL for isthe in
already
available AQM
same. tool
having
in the AQM, forOFC
aSE ordering.
connectivity
will as prepare via
the points AERIAL
CPQ(Mux quotes route andtofromsend outsidefor the
approval plant
-Kumar
SITA
11-Jan-22:
underground
expected
SITA
Expected
10-Jan:
04-Jan-22: SITA for
supplier
sourcing
supplierMTNL byspeedy
Formal
start
BSNL
wired
the
Thursday.
wiredis
date
quote
feedback.
quotes
feasibility
approval
current
workingfeasibility
ofis build
available
are with on
workreceived
permission
received
expected cable.
supplier
andisthis12th
needs
toin
from
to
from
be
is
Janto BSNL/MTNL
pending
confirm
BSNL/MTNL
22be updated
received
from
by forend end
on
on LCONfiber.
connectivity
fiber.
inall,of
AQM
Two
Two
tool
thissites
LCON
week.
action
actionsubmitted
interface
topermission
proceed
SITAMAA.
points
sourcing
assigned
the to
assigned
further. permission
customer to
SITAthey
to connect
check
check
Sourcing with
with
request
room). with to
is working
thus
before
22-Dec:
supplier
thier
18-Jan-22: ROW ording.
OBS
management with
There isBMC
feasibility on
isLCONno will11th not
report
update toJan affect
received
only
provided ,quotes connection
bywireless
details inof Engineers
LDM/Carrier delivery
only ,for
ason per once
the
Carrierlast BMC except
Letterhead
update provided areonly is available
already
on 14th shared will Vinay
with just
LCON.
10-Jan:
-Kumar
supplier
06-Jan-22:
internally
As
underground
-SITA
SITA
per
SITA
MTNL
sourcing
for
OBS
sourcing As
(TAT-10th
speedy quote
per
connection
the is
working is
Jan).
feedback.
current
working
available
Balaji
would Once
AERIAL
with
update
they
be
andcan
quotes
ready
cable.
supplier
needs provide
available
from
to
to be
AQM
thier
confirm
updated
permission
in end tool
AQM,
the by
end
inof
aSE
end
AQM
ordering.
Fiber
will
of
connectivity
tool
Build
prepare
2nd week
toworkproceed
the
of
interface for
CPQ
Feb'22.
further.
(Muxquotes upto
to
SITA
and 3Jan
customer Days
send carrier
Sourcing offorduration
room).
will
approval plan
is working and
Expected
to
internally
04-Jan-22:
-same SITA supplier
start the
sourcing
is start
build
BSNL wired
(TAT-10th
non-extandable, team
date
team work
quotes feasibility
of to
Jan).
to check
build
within
are
check
As Once workreceived
with
this
expected
per withquotesis
carrier BSNL/MTNL
12th
ongoing to
BSNL/MTNL from
be
buildJan BSNL/MTNL
week.
available 22
received
work for
in
for last
AQM,
last
cannot by mile
end
mile on
aSE
be fiber.
should
of will
should this
completed Twobe
prepare
week.
be on
on action
fiber.
the
SITA
fiber.
within points
CPQ
sourcing
3 days assigned
quotes of to and
connect
duration to
sendcheck
thus for
with with
approval
Vinay
they need
before
-22-Dec:
28-Dec-21:
18-Jan-22:
supplier SITA ording.
OBS
sourcing As
Therefeasibility
peris
team is theno
working will report
carrier
update to
check received
they
provided
update would
ifprovided
BSNL/MTNLquotes in
by wireless
be doing
LDM/Carrier
in AQM
can only
port tool
provide for
, as
for all
provisioning
the per the
ordering.last
copper sites only,
update except
handoff customer MAA.
provided
for IHW need
on to
14th
connectivity. confirm
Jan carrier about will Fiber
plan
-06-Jan-22:
13-Jan-22:Permissions
before
Kumar
extended
-SITA
IHW SITA
SITA ording.
for
sourcing
sourcing
supplier
availability
As per
speedy
permission.
wiredteam
is as
LCON
feedback.
working will
itfeasibility
areBalaji
check
with they
nowreceived if can provide
BSNL/MTNL
supplier to
fromby AAI
confirm can permission
BSNL/MTNLtoprovide
startend
the IBDontheofwork Fiber
copper
connectivity
fiber.
Build
using
Two handoff work
wall
interface
action
for(Mux
clamping
for
points
onlyand
IHW upto TCL
connectivity.
to
assigned
3 Days
customer is working
to check
of duration
room). with on OSP and
to
04-Jan-22:
-20-Dec:
same
permission
-22-Dec:
20-Dec:
SITA
start
SITA
SITA TPM
the
sourcing
OBS
issourcing
OBS build
BSNL
non-extandable,
and
will team
(carrier
is
(carrier
work
quotes
permission
feasibility
discuss working --was
to within
are
check
SIFY) As
report
SIFY)
the
already
and
per
with
withand
challenge
this
expected
with agreed
SITA
MIAL
supplier
received
SITA
ongoing
carrier with
to
BSNL/MTNL
supplierbe
build
forto
in
supplier
during
week.
7MTR received
Balaji's work
confirm
wireless
earlier
for
(Carrier
(Carrier last
cannot
strechthe
only
Manager
by ––enddiscussion
end
mile
Bharti
for
Bhartibe all
today
of
shouldAirtel)
completed
connectivity
the
Airtel)
and
in
thissites beNovember
week.are
areon SITA
fiber.
not
within
interface
except
request not 3end,
sourcing
feasible
MAA.
feasible
them days
(Muxto
TPM
to
toofto
advise
to already
connect
deliver
duration
customer
deliver if wired
wired
this
sentwith
thus
3 room).email
Vinay
connection.
they
connection.
Days
to
need
-supplier
LCON
13-Jan-22:Permissions
Kumar
-SITA SITA sourcing
toforconfirm
speedy is working
feedback. arecheck tonow update ifprovided quotes by in inAAI AQM toprovide tool
start for
IBD ordering.
work using wall clamping and TCL is7Mtr
working onas OSP
-- SITA
extended
13-Jan-22:
SITA SITA sourcing
Sourcing
sourcing
supplier
SITASourcing
has
permission.
Response
wired
hasteam
is already
working will
from
feasibility
already raised
carrier
to
raisedupdate
received BSNL/MTNL
request
isBSNL/MTNL
request pending
quotes fromwith
with on can
BSNL/MTNL
AQM request
BSNL/MTNL
BSNL/MTNL tool of
for
onthe
for
permission
for copper
confirming
ordering.
fiber. Two
confirming handoff the
submission
action
the for IHW
feasibility
points
feasibilitywith connectivity.
assignedand
MIAL
and provide
onto
provide check quotes
digging
quotes with they
permission
04-Jan-22:
23-Dec-21:
permission
22-Dec:
20-Dec:
were
SITA
inside
04-Jan-22:
sourcing
positive
TPM OBS
airport
can
BSNL
Order
and
will
BSNL
be
team
(carrier
for
discuss
premises
quotes
isextended
permission
feasibility MPLS.
quotes -to
revised are
check
report
SIFY)
the , from
are
whenever
expected
in
with
and
challenge with
tools.
ESD
expected MIAL
received
SITA with
side
to
Circuitrequired.
for
in
supplier
to it
be 7MTR received
Ordering
wireless
Balaji's
beis
for
strech
(Carrier
already
received Manager last
only by – mile
initiated
escalated
by
end
for
Bharti
end allof
todayshould
of to
thissites
with
the
Airtel)
and
OBS
this
week.
be
Carrier.
areon
except
request
management
week.
SITA
fiber.
not
SITACarrier sourcing
MAA.
feasible
themsourcing will
to
that to
advise
to
share connect
deliver
this
to circuit
if wired
this
permission
connect 3
with
EDD
with nextas they
Vinay
connection.
Days should
Vinay be
supplier
were
04-Jan-22:
Kumar
--permission SITA positive
for speedy
sourcing Due for to
team MPLS.
Holidays
feedback. will check and short
ifSITA
BSNL/MTNL duration permissions
can provide thewere copperprovided handoff by LCON
for carrier was not able to start
week.
13-Jan-22:
SITA
-raised
Kumar
the SITA
SITA supplier
Sourcing
fiber sourcing
by
for
sourcing Response
can
carrier
speedy
work
wired
has
, isbe
team
is or
Now already
checking
extended
OBS,
feedback.
checking
from
feasibility
to check
Engineer
carrier
raised
with
Customer/AAI
with received
whenever
with SITA
details
isBSNL/MTNL
request pending from
supplier
supplier
are with
required.
canshared
on
support
and
request
BSNL/MTNL
BSNL/MTNL
and for OBS
OBS
with lastthem to
to
LCON
ofprovide
mile on permission
for
in
provide fiber.
liasioning
should
seeking
Two
confirming
the
the beat
submission
on action
reasibility
with
reasibility
least the
fiber.MIAL.
2 byIHW
points
feasibility
by
Weeks
with
end
end of
connectivity.
MIAL
assignedand
of
of this
permission
onto7Mtr
thisprovide
week.
week.check
to
digging
quotes with as they
carry out
22-Dec:
20-Dec:
Action:
inside
supplier
were
16-Dec: OBS
ESD
airport
positive feasibility
(carrier
will for
has check
premises MPLS. - report
SIFY)
with
, from and
ODM received
ESD SITA
& TPM
side in
supplier
it wireless
for
is EDD(Carrier
already only –
escalated for
Bharti all the
toAirtel)
OBSsites are except
managementnot MAA.
feasible that to deliver
this wired
permission connection.
should be
04-Jan-22:
11-Jan-22:
22-Dec:
-16-Dec:
and
SITA SITA OBS
sourcing
complete
supplier Due
For hasthe
wired toshared
80Mtr
feasibility
team Holidays
shared
fiber OSP
will
feasibility
wireless
report
buildcheck
wirelessand
work work
received
feasibility
ifshort
Carrier
received BSNL/MTNL
feasibility
at duration
site.will
in
from
report
be
wireless
report
Carrier reponsible
can
BSNL/MTNL
which
permissions
only one
provide
which
need foris for
on
rejected
thewere
all permission
isinformation
rejected
week the
copper
fiber. sites(requirement
provided
advance
Two handoff
(requirement from
except
action by LCON
notice local
MAA.
for
points
is
IHW
to wired).
carrier
givt
isRanjan Auth QNBS
was
connectivity.
wired).
mobilize
assigned QNBS tonot
and
the is
isable
same
field
check
working
working
teamistoalready
with onwith
start
withsite.
14-Dec-21:
raised
-SITA
the SITA Sourcing
fiber by
sourcing
supllier work Order
carrierfor has
, team
is or
Now already
is
checking
wired again
OBS, to check
solution.
Engineer raised
stuck
Customer/AAI
with with request
due
SITA
Ranjan
details to
BSNL/MTNL some
supplier
are to with
can update
shared BSNL/MTNL
missing/old
support
and for OBS last
correct
with them to
LCONmile for
in
provide
address confirming
liasioning
should
seeking the
in beAQM
at , onwith
reasibility
least the
Requested
fiber.
by 2 feasibility
MIAL.
today. by
Weeks end of and
of to
this provide
permissionadvice
week. quotes
what
to carry excatly as
out they is
in
20-Dec:
SITA
28-Dec-21:
supplier progress,
supplier
supllier OBSLCON as
for per
wired
(carrier wired carrier
Balajifeasibility
- OBSSIFY)
solution.
advisedalland inside
received
SITA
Ranjan premises/IBD
toBSNL/MTNL
carry from
supplier
toout updateBSNL/MTNL
(Carrier
the permission
workcorrect –starting on
Bharti
address are
fiber. to
Airtel)
from Two
in be are
AQM
28Dec raised
action
notby
- 31 and
points
feasible
today.
DecIHW providedassigned
to deliver
,givt
This is abyvery end
to check
wired customer
short with
connection.
duration ie AAI as
-were
missing
11-Jan-22:
16-Dec:
09-Dec:
and
as
supplier
SITA
07-Dec: SITA positive
complete
carrier
Sourcing
and
sourcing
OBS
QNBS
The
For
will is
ISP
for
hasit
80Mtr
the
not
hasteam
team MPLS.
from
shared
fiber
raise
already
feasibility
OSP
will
isbe waiting
build
any end
work
check
wireless
raised
requestwork
request orif SITA
Carrier
feasibility
forrequest
OBSatof
has
end.
site.will
response
been
Once
be
report
Carrier
permission
with can on new
reponsibleprovide
which
need
BSNL/MTNL
raised to ISP
with MIAL order is for
the
feasibility
one
OBS
is
rejected
week
directly.
for
submitted
permission
copper and
advance
confirming
Sourcing. handoff
(requirement to
from
quotes(ETA-next
Carrier Reponse
carrier
notice
is
the local
for
waiting to
feasibilityis
awaited.
then
for they
Auth
connectivity.
wired).week).
mobilize AAI
andSITA QNBS
go will
and
theAt start
same
theis
field
ahead
provide
sourcing samethe
working
team
in
quotes is
hasorder build
alreadywith
time,
on
as
been site.
to
they
per
-work
in SITA TCL post
progress, and
sourcing they
permissions
as team
is
per will
checking
carrier to are sending
check with with
available.
all inside FE
SITA details
BSNL/MTNL
supplier
premises/IBD to AAI
and for for
OBS last
permissionaccess
to mileprovide permissions,
should
are the
to be
be on TPM
reasibility
raised fiber. and isby already
end
provided of working
thisby week.
end withcustomer both. As
ie per
AAI
-20-Dec:
SITA
28-Dec-21:
start
were
eganged
-TCL
16-Dec: SITA
SITA
supllier
ISP
doing
oncepositiveOBS
supplier
sourcing
sourcingfor
OBSFE LCON
the (carrier
for
teamfor
speedy
has
wired
team
team
response
IBD(in Balaji
MPLS. -to
is feedback.
shared on-site
will
SIFY)
solution.
advised
buidling/In
check
check
wireless
and
expected
they with
For SITA
Ranjan
iftowill carry
Airport supplier
by
BSNL/MTNL
SITA
BSNL/MTNL take
feasibility
to
13th
out update
Complex)
supplier-
5-7
(Carrier
Dec'21.
the
reportWeeks
can work
for correct
Airtel last
provide
which
TATA
work.
for
–starting
Bharti
mile
has address
Circuit
is
as
the should
raised
rejected
Airtel)
carrier
from ain
delivery.
copper be are
AQM
manual onnot
being
28Dechandoff
(requirement
by
fiber. feasible
today.
-checked.
31 DecIHW
feasibility
for
to
, This
is wired).
deliver
request is a very
connectivity.
QNBS forwiredshort
more
isend.
connection.
working
duration as
accuracy with
09-Dec-21:
as
SITA
07-Dec:
02-Dec:
per
06-Jan-22:There
-20-Dec: carrier
SITA Sourcing
TCL The
We
and
sourcing willOrder
ISP
have
theynot
hasteam Recof
raise
already
feasibility
raised
will
was be
joint
will done.
any request
raised
request
feasibility
sending
survey
check Now request
FE
ifSITA order
of
has
request
done details
BSNL/MTNL isTCL
permission
bywith
been for
to in delivery
BSNL/MTNL
raised
Corporate
AAI
and15th
can to
forwith MIAL
access
customer
provide phase
OBS for
Connect
the and
directly.
permissions,
team,
copper pending
confirming
Sourcing. Carrier
Light Reponse
yesterday, (OBS
handoff the
TPM for
is HW updates
waiting
feasibility
is
for awaited.
+OBS
already
below IHW for from
AAI
andSITA
ISP).
working
isconnectivity.
the carrier
go ahead
provide
sourcing
Feedback
report with in
quotes
, thereishas
both.ESD
order will
as
isbeen
awaited As
someto
they
per
and
23-Dec-21:TCL
SITA
call response
Omsupllier OBS
Sharma for is
awaited.
had
(carrier checking
wired
and completed
-
will SIFY)
solution.
securewith
and the SITA
Ranjan
progresssite supplier
survey
supplier
to onupdate
theand
on
(Carrier OBS
correct
circuit – to
Dec. provide
Bharti Diagram
address
delivery. Airtel)the
in reasibility
of
are
AQM the notby fiber by
feasible
today. cable end to of
route this
deliver week.
also shared
wired by
connection. carrier
start
were
eganged
from
TCL
part
20-Dec:
16-Dec: doing
oncepositive
OBS
digging for
OBS the
sourcing.
FE team
and for
speedy IBD(in
(carrier
has MPLS.
is
trenching
shared on-site
- buidling/In
feedback.
SIFY) they
required
wireless and For Airport
will
SITA SITA, take
feasibilityfor
supplier Complex)
supplier-
5-7
which reportWeeks Airtel
customer
(Carrier work.
which for– has Circuit
had
Bharti
is raised
rejectedagreed
Airtel)a manual
delivery. to
are arrange
(requirement not feasibility
feasible for is thetorequest
wired). permission
deliver QNBS for more
wired is , accuracy
connection.
working with
02-Dec:
and
SITA same
Sourcing The is ISP
shared
has feasibilitywith
already this LCONrequest
raised as has
requested
request been with raised
by them
BSNL/MTNL with in OBS
order for Sourcing.
to arrange
confirming Reponse
the
the awaited.
permission
feasibility SITA
to
and lay sourcing
the
provide fiber
quotes has
cable. been SITA
as, they
-07-Dec:
02-Dec-21:
06-Jan-22:06-Jan-22:There
and
28-Nov:
23-Dec-21:TCL
So
SITA SITA response
after
Sourcing
supllier
The
sourcing
The
the ESDISP
ISP feasibility
isEscalated
awaited.
had
permission
for has checking
feasibility
wired completed
already
request
wasorder
with
request
is arrange
raised the joint
SITA has
has
site
TCL
request to been
OBS
survey
supplier
been
survey
can with
raised
management
done
and
submitted
start on by
OBS
15th
the
BSNL/MTNL
with TCL
work to OBS
with
Dec. as
and
provide
atfor
Sourcing.
order
OBScustomer
Diagram
the the
and is of
customer
confirming
Reponse
still
SITAthe not
team,
reasibility QNBS pushed
fiber
site.
the
awaited.
yesterday,
by team.
cable
feasibility end into of
The
route
and
SITA
delivery
below
this sourcing
week.
request
also
provide is phase
shared the
raised
quotes
hasin to
report
by been
tools
carrier
as they ,
eganged
TPM
were
eganged
however
there
16-Dec: sent
positive
is some for
for
ODM
OBS
speedy
remindersfor
speedy
part
has is MPLS.
working tosolution.
feedback.
feedback.
digging
shared LCON inand
wireless Balaji
ForRanjan
background
trenching since
SITA
feasibility
to update
20th
supplier-
with
required
report Dec
LDM correct
, but
Airteland
for
which not
has address
carrier
whichis getting
raised team.
customer
rejected ainany AQM
manual positive
had
(requirement
by today.
agreed response
feasibility is to request
arrange
wired). , TPM QNBS called
for
for more
the
is LCONaccuracy
permission
working but
with no,
02-Dec:
provide
and
were
07-Dec:
-answer Plan-Csame
positiveThe
Access
The
has is ISP
shared
ISP
not for feasibility
speed MPLS.
feasibilitywith as request
2048/2048k
LCONrequest as has
requested
has been
with
been last raised
by mile
raised them with
on
with in OBS
fiber.
order
OBS Sourcing.
Hardware
to
Sourcing.arrange Reponse
is available.
the
Reponse awaited.
permission
awaited. SITA
to
SITA lay sourcing
the
sourcing fiber has
cable.
has been
been SITA
-and
28-Nov:
So
SITA
eganged
Next SITA
after
supllierto
sourcing
response
Action:> Order
the
for
phone isbeen
awaited.
will
permission
for
speedy
call.
checking
wired
Supplier be mentioned
ESD
RECOF.
feedback.tois
solution. advised
with
arrange
confirm There SITAinSITA
Ranjan
SAM
TCL
the no TPM
issupplier
can
ISPto
raised
change
start
update to
and
feasibility
with
escalate
the OBS
in OBS. to
commercials(same
correctwork
to proceed
Ranjan
itprovide
attothe
address with
need
AAIcustomer
next
the
inany AQM
to
as get
level
reasibility
ordering.
the
contact
existing).
site.
by today. byclarification
Generally endperson. ofsupplier
Additional this week.from
charges
ismore
OBSwaived
taking
if we can off
TPM
Joint
-02-Dec:
eganged
proceed
Action
16-Dec:
by
07-Dec:
SITA sent
survey
carrier.
sourcing
: ESD
OBS
The
The
reminders
for
as completed
hasisfeasibility
speedy
topology
will
ISP
ISP
checking
send
shared
feasibility
to
feedback. LCON
with
isreminder
changing with
wireless
request
request
Balaji
Mr. ForSITA
to Rahul
to since
SITA supplier
Always
LCON
feasibility
has
has been
been
20th
Maurya
supplier-
for on.MAAand
report Dec
raised
raised
and OBS
Airtelbut
,which
if Hemant
with
with noto not
hasfeedback
is
OBS
OBS
getting
provide Ramchandani.
raised
rejected
Sourcing.
Sourcing.
the
aon positive
reasibility
manual
permissions
(requirement
Reponse
Reponse
response
by
feasibility isend
then
awaited.
awaited.
of,SITA
request
Sunil
wired). TPM
this
SITA will
QNBS called
week.
for escalate
sourcing
sourcing isOBS LCON
workinghas
has itato
accuracy butHQno
with
been
been
-minimum
answer
16-Dec:
and
28-Nov:
16-Dec-21: Plan-Cresponse tohas
OBS
The of not
phone
TCL13-15
has
ISP been
awaited. call.
shareddays
feasibility
team mentioned
ESD
visited to share
advised
wireless
request
the in
the
site SAM
SITA
has on been raised
feasibility
feasibility TPM
15th to
report with
results.
escalate
submitted
Dec , which
As OBS.
per it
is
with Ranjan
to AAI
rejected
thier OBS need
next
and
initial to
level
(requirement
SITA
planning get
QNBS the
contactthey clarification
is
team. person.
wired).
were The QNBS from
request
supposed is working
raised
to if we
install to can
with
new
SITA
eganged
24-Nov: issupllier for
Carrier fortoiswired
speedy solution.
feedback.
reviewing Ranjan to update correct address inmanual
AQM byfeasibility
today.
Joint
eganged
proceed
aSE
Action

SITA
02-Dec:
provide
-ground
07-Dec: Plan-C
survey
workingas
: mounted
180mtr
supllier ESD
The
Access
The
has
completed
fortopology
speedy
will
IBD
for
ISP
ISP
not feasibility
speed MUX
feasibility
been
feedback.
expedite.
send
trenching
wired as
with
isreminder
changing
solution.
but
mentioned iscommercial
request
2048/2048k
AAI
request
Mr. For to
cancelled
LCON
Rahul
to
Ranjan SITA
inhas
Always
LCON
has
SAM to
been
with
advised
been
proposal,
Maurya
supplier-
for
and on.
last
raised
MAA
update180mtr
raised
TCL
and
mile
raised with
, feedback
Airtel
to
Hemant
ifwith
correct
on
withinstall
OBS.
has
nofiber.
wall feedback
clamping
OBS
OBS address
the
Ranjan
expected
Ramchandani.
raised
Sourcing.
Hardware
MUX
Sourcing.
aon
need only
by Friday
permissions
inrequire.
AQM Reponse
is
Reponse bythe
inget
toincluding today.
available. the
26ththen
awaited.
wall
awaited.
November.
request
mount
clarification
Sunil SITA
SITA will
rack.
for more has
escalate
sourcing
OBS
sourcing
from OBS LDM
accuracy
has it will
if we
to
been
been HQ
canbe
23-Nov:
and
28-Nov:
23-Nov:
16-Dec-21:

07-Dec: response
Cable Carrier
The
Solution
The TCLISP
entry
ISP has
awaited.
team has
in
feasibilityconfimred
feasibility not
visited
building request
been the feasibility
finalized
through
request site has
has onwallbeen
byof
15th
been optical
aSE submitted
Dec
clamping hence
raised , handoff
As and
with order
per with
one
OBS on
thierisOBS 18th
not and
initial
chamber
Sourcing. Nov
reaised SITA
planning
require
Reponse QNBS
with OBS
they
nearby cross
team.
awaited. yet.
were entry connect
The request
supposed
SITA gate feasibility
in
sourcing raised
to
buildinginstall
has at
to PoP
new
been
eganged
Next
sharing
eganged
proceed
end. Action:>
Change morefor
for
as speedy
Supplier
details
speedy
topology
in Commercial feedback.
today
feedback.
is to
changingconfirm
, -NOto For EDD
beto the
SITA has
Always
approvedISP feasibility
been
supplier-
on. by announced
Airtel
SITA to proceed
has
(approix yet.
raised with
MRC a ordering.
manual
14500 + Generally
feasibility
Tax; NRC request
23000 supplier + for
Tax).is
more taking a
accuracy

02-Dec:
provide
PLAN-A
ground
premises. 180mtr :The
Access
MPLS
mounted IBD
ISP speed
circuittrenching
feasibility
MUX as
delivery
but is
request
2048/2048k
AAI cancelled
by
LCON has
BSNL with and
been
through
advised last 180mtr
raised
TCLmileOBS.to with
onwall
install clamping
OBS
fiber. the Sourcing.
Hardware
MUX require.
only Reponse
is available.
in the awaited.
wall mount SITA rack.sourcing
OBS LDM has been
will be
-eganged
minimum
and
28-Nov:
-
eganged
Plan-C
ESD to has
response
Carrier Cable
for
The
demark
speedy
not
ofentry
check 13-15
ISP
fordigging
been
circuit
awaited.
speedy feasibility
inin
feedback.
days
MMR mentioned
building
feedback.
toGround
installation share
request Forthe
through
in SITA
date SAM
has
Floor, wall
supplier-
been raised
feasibility
with OBS.
Customer submitted
clamping
Airtel
with
results. atand OBS.
1st
has
with
Floor,
one
raised
RanjanOBS a manual
need
and
Approx
chamber SITA to get
100m
require
feasibility
QNBS theteam.
IHW
nearby needed.
request
clarification
entryThe for more
from
request
gate inis
OBS
raised
building
accuracy
if we toend can
Next
-sharing

and
proceed
aSE
- Carrier BSNL Action:>
7mtrconfirmed
response
is
Hardware more
workingas status Supplier
details
awaited.
topologyto that
require
expedite.
to be is to
they
todaychangingconfirm
can
,
out NO ofdeliver
EDD the
entry
to has
Always ISPthe
gate feasibility
beenconnectivity
on.on announced
premises to proceed
on ATS Fibre
yet. and with
(OFC)
MIAL ordering.
with
and one Generally
Ethernet chamber Handoff supplier
nearby on entry taking
Customer gate a in out
02-Dec:
provide
-premises.
minimum
Location
-of Plan-C
ESD
The
to Access
Demark:
has ofOn
check
ISP
not
13-15 feasibility
speed
been
circuit TCL days aschecked.
Mux
mentioned
to
installation
request
2048/2048k
in MMR
share inhas
the
date Room
SAM been
with last
(ports
raised
feasibility
with
raised
OBS. mile to with
with
results. on
be OBS. OBS
fiber.
finalized Ranjan Sourcing.
Hardware
after
need Reponse
is
toavailable.
provisioning).
get the awaited.
clarification SITA from sourcing OBS has
if we been can
02-Dec:
28-Nov:
23-Nov:
14-Dec-21: premises. The
SITA ISP
Projectfeasibility
10th Dec delivery LCON request team,
Balaji hasSITA been
requested QNBS raised
submitted
is
SITA with
working TPM OBS
with onOBS
to Sourcing.
below
postpone and to Reponse
SITA
provide
TCL QNBS
site awaited.
the
visitteam. carrier
to 15th The SITA
diversitysourcing
request
December. raised
to has
AAI. ato been
-eganged
Next
-
proceed
aSE

eganged Hardware
is Action:>
7mtr
Feasibility
Hardware working
80mtr
fordigging
as
for
speedy
Status:Supplier
topology
on
status
OSP
speedyto
OBS It feedback.
require
expedite.
to
require PoP is
is
be
feedback.
to
live
changing
end confirm
checked.
and with
out was
thisof 4G
to the
entry
never
is Always
ROW
ISP
solution. gate feasibility
on.
requested on
permission premisesas to proceed
confirmed
WIP. ATS and with
by MIAL
BSNLordering.
and
in one
last Generally
chamber
call.Same supplier
nearby
has been is
entry taking
requested gate innow.
out
-provide
PLAN-A
09-Dec:
minimum
-NEXT
of
28-Nov:
23-Nov: Plan-C
Lead
:
ACTION:
premises.Time
Access
AAMPLS
has
The
SITAof LCON
not
13-15
ISP
to
speed
circuit
Project been
complete
(Mr.days
feasibility
as
delivery
2048/2048k
delivery
Abdul)
mentioned
to
the share
request
by
called
team,
Feasibility
BSNL
in
the SAM
has
with
Carrierthrough
feasibility
SITA been
last
raised
QNBS
is raised
15
and
days
mileOBS.
informed
with
results.
submitted
is
on
working
but OBS.
SITA
fiber.
with them
Ranjan
on
Hardware
OBSbelow
Requested
that
need
and to
TCL
SITA
to
is
to available.
should
provide get
QNBS
expedite the the
install
clarification
team.
on carrier
BSNL
aThenew MUX
from
request
diversity
end and
for
OBS
raised
to
this
AAI.
should if we
todelivery
can
revert
14-Dec-21:
Next
-and
proceed Plan-C
BSNL Action:>
TCL has
confirmed
was
as Onnot
not
topology 10thbeen
Supplier that
preapred Dec isas to
they LCON
mentioned
changingconfirm
can
for Balaji
this in
deliverthe SAM
sudden requested
ISPthe feasibility
connectivity
change SITA
with in toTPM
OBS.
plan proceed
on ,to
Ranjanpostpone
Fibre
Also with need
(OFC)
LCON TCLto
ordering.
with
informed site
get thevisit
Generally
Ethernet us thatto 15th
clarification
Handoff
TCL December.
supplier
staff from
on is
can OBS
taking
Customer visit if onawe end can
site
aSE
-
provide
PLAN-A
in
09-Dec:
All OBS is80mtr
week working
trenchingto:Access
AAshare
MPLS
time OSP
LCON to
from
and the
speed expedite.
circuit charges
require
now.
(Mr.
digging and
delivery
Abdul) inthis
2048/2048k
permission byto
INR?
called
Always
isBSNLROW with
Carrier
will through on. mile
permission
last
and
arrange OBS.
informed on WIP. fiber. them Hardwarethat TCL is should
available. install aThenew MUX for this delivery
proceed
minimum
Location
during
-28-Nov:
23-Nov:
Next
-aSE
and OBS
BSNL Action:>
TCL is
as
The
SITA
toconfirmedoftopology
13/12/2021
confirm
requested
was
13-15
ISP
Project
not Supplierwhy
that
tois
days
feasibility
preapredto MRC
changing
delivery
to
they
check
to
17/12/2021 share
request
iscan
confirm
for team,
there,
another
this
to
the
deliverthe
Always
as
has
sudden
feasibility
itSITAthey
been
should
ISPthe
options QNBSon.
are
changebe
feasibility isaby
results.
busy
submitted
connectivity
(1-Direct working Mr.
in
one-time
in toplan
Rahul
operational
with
proceed
on on
connectivity
,
OBS
charge
Fibre
Also
Maurya
below
withandtask
(OFC)
LCON to
only SITAand
in
ordering.
between
frist
provide
(NRC)
with
informed
Mr.week
QNBS Hemant
the team.
Generally
Ethernet
OBS POP
usteam.that Handoff
and
Ramchandani.
of December.
carrier TCL
request
diversity
supplier
staff oncan
Customer is raised
to
taking
Customer AAI.atoend
visit
We
28-Nov:
--All need
is
Feasibility The
working mail onISP of
to
OBS permission
feasibility
expedite.
PoP end from
request
was Mr.
has
never Rahul
been
requested Maurya
submitted as or
confirmedMr.
with Hemant
OBS by and BSNLRamchandani,
SITA in QNBS
last call.Same then Thewe
has start
request the IBD on
raised tosite
work
provide
PLAN-A
minimum
Location
Site/Optical/RJ45
during
AAI has
if trenching :
the 13/12/2021 no
Access
MPLS
cross-connect
ofto rights
and
13-15 speed
circuit to
digging
days
handoff
decide
as
todelivery
2048/2048k
delivery
isas expensive
to the
permission
17/12/2021atshareboth by MUX
BSNL
with
the
the
asSITA
serviceability.
with
will through
fibre last
arrange
feasibility
end)
they are
mile
handoff, OBS.
by
results.
busy
onMr.
in can fiber.
Rahul
operational
Hardware
weHardware
goMaurya
with task
is
Electrical
and
in
available.
frist Mr.week handoff
Hemant ofBSNL the customer end? now.
been
atRamchandani.
December.
requested
-provide
23-Nov:
Next
--Challenge:
16-Nov:
We Lead
Telco
BSNL need Time
to
Action:> Access
SITA
decide
confirmed
Order
mail
speed
Project
complete
Supplier
ofis ifthat
with new
permission tomux
they
ODM
2048/2048k
theconfirm
can
in team,
Feasibility
is
from required
the deliverthe
background
Mr.
with
ISPisor
the
Rahul 15last
QNBSnot.days
feasibility mile
is
ESD
connectivity but
todrawing
Maurya
on
working
proceedwill
to SITAfiber.
check
proceed
orproceed onwith
Mr.
onFibre below
Requested
Hemant with
with
(OFC)
fiber to
OBS. to is
ordering.
with
handoff
Ramchandani,
available.
provide
expedite the
Generally
Ethernet
delivery. on carrier
thenHandoff diversity
end
supplier
we start and is
on Customer
the
to
taking AAI.
should
IBD work a revert
end
aSE
04-Jan-22:
Next
PLAN-A
in AAI isAction:>
Feasibility
week working
has no
:time
MPLS on
rights
Revised to
OBS
Supplier
from expedite.
circuit to PoP
plan
now. toend
decide along
delivery confirmwas
the byMUX
with never
the
BSNLthe ISPrequested
serviceability.
detailed
feasibility
through OBS. astoconfirmed ofthe build by
withworkBSNL are
ordering. in submitted
last call.Same
Generally toGA has
LCON
supplier been
, Tois requested
explore
taking atheon now.
8-Dec-21:As
minimum
Location
Revise
04-Jan-22:
23-Nov: COF SITAof is per
13-15
Revisedpending
Project customer
days
plan from
delivery to
along different
share
OBS with
team, the
due mux
the
SITA to
feasibility
to tool
detailed
QNBS be
issue.installed
results. We
drawing
is site
working are inof changing
on build 3rd
below floor,
work handoff
are and
torequired.
provide given
from
submitted the the
copper to
carrier for
to
LCON the
fiber.
diversity, To site survey
Hardware
explore
to AAI. the
--1.OBS
options
minimum
-13th
aSE
Status:
Lead
Telco
BSNL isDEC
Feasibility
Time
PoP
to of
confirmed
is
working
Itof
can
decide
wall
of to
requested
is21 on13-15
. to
live
complete
be
OBS
with
if connected
thatnew
clamping/Aerial
days
to
expedite.
PoP4G
mux
they
check the
to
end share
solution.can Feasibility
iswithrequired
another
was
Copper
cabling
the
deliver
never
is
a or
feasibility
the
options 15
with
not.
revised
requested
days Serial
ESD but
results.
connectivity
(1-Direct as
will SITA
Interface
survey
confirmed
check
on Requested
might
Fibre
connectivity with (OFC) OBS.
be to
between
bytofloor,
BSNL withexpedite
in last Ethernet
OBS We on
POP
call.Same areBSNL
Handoff
andwaiting
has
end on
Customer
been
and
forCustomershould
final
requested updates revert
end now.
options
PLAN-A
in :time wall
MPLS clamping/Aerial
circuit delivery by cabling
BSNL a torevised
through site
OBS. survey might be required. We areGA waiting thefor final updates
2.OBS
8-Dec-21:As
from
aSE
Location
-Site/Optical/RJ45
It
23-Nov:
01-Nov:
from
-level. isweek
Lead
BSNL
is will
carrier/OBS
working
required
Time SITA
have
Revise
carrier/OBS
confirmed to
from
per
to to
Project
to
do
complete
COF
on
on
now.
work
customer
expedite.
handoff
thatjoint
is
same.
delivery
same.
with
the
pending
they
at
can
BSNL/MTNL
different
both
inspection/visit
team,
Feasibility
from
deliver
the mux
SITA
OBS end)
the
tobe
isbetween
QNBS
setupinstalled
15connectivity
due days
to istoolTCLinfrastructure
working
butissue. & in
SITA AAI
on
the
onWe team
Fibre
3rd
below
Requested are(OFC)
provide
tochanging
tofinalize
to
and
provide
withexpedite
the
given
the
handoff
Ethernet
connectivity
theOFC on
the laying
carrier
BSNL
from
Handoff
for andwith
diversity
end
copper onand
OFC
site
explain
to to
Customer
from
survey
AAI.
should
fiber. therevert POP
on
end
13th
28-Dec-21:
23-Nov:
-Challenge:
requirements/tasks DEC
Feasibility is requested
21
SITA ESD. Project
onfrom OBShadnow. to
PoP check
adelivery
jointend call another
was with
team, never TPM
SITAoptions and OBS
QNBS
requested (1-Direct
isOBS. LDM
working
as connectivity
confirmed, Asonper belowLDM
by BSNL between
to carrier
provide
in last OBS
is preparing POP
the carrierahas
call.Same and Customer
fiber
diversity
been router to AAI.
requestedlayout now.
PLAN-A
in
Hardware
28-Dec-21:
Location
Site/Optical/RJ45
3.BSNL
It isweek
required
:time
willMPLS
Status:
ESD
have circuit
had
tocomplete
do toIt isfor
a live
handoff
install
joint
the
delivery
joint MEA
cable
with
atcall both
inspection/visit
by
4G
with route.
BSNL
solution.
the
hardware TPM through
end) and
at ourOBS POP LDM & ,on
location As per LDM
(space, carrier
power, is preparing
cable route, afrom
fiber
permissions route orlayout
would be
diagram
PLAN-A
-1.OBS
TCL
-14th Lead
BSNL Team
Oct Time
PoP
is :and
MPLS
: can tothey
details
confirmed
requested
HW &
circuit
be will
connected
are
that
Circuit to submit
delivery
already
they
check the
EDD can itby
shared
another
still
to
Feasibility
with deliverAAI
BSNL
Copper
peding with isbetween
for
the
options further
through
15
with
LCON
from days
connectivity OBS.
Serial
for
(1-Direct
OBS
TCL
checks
but
. SITA
Interface
arranging
POP
AAI team
if permission
Requested
Fibre
connectivity
end access
Cross
to finalize
(OFC) would
to
between
connect withexpedite the
be
Ethernet
OBS
feasibility
OFC
required
on
POP
laying
BSNL
Handoff
and
issue,
and
end on
Customer
Carrier
explain
MIAL
and Customershould
TTSL
therevert
not.
working end
diagram
--in
Challenge:
required).
requirements/tasks
23-De-21: Feasibility
BSNL
week and
confirmed
time The they
onfrom OBS
contact will
that PoP
now.for submit
end
the
details
they was
cable
can it to
ofdeliver AAI
never
route.
Nodal for further
requested
person
the Mr.as
connectivity checks
Rahulconfirmed onif permission
Maurya
Fibre by BSNL
shared
(OFC) would inwith
with last be required
call.Same
Carrier
Ethernet to start
Handoff from
has with beenMIAL
the
onfor or
requested
in-building
Customer not. end now.
2.OBS
3-Dec-21:
Location
Site/Optical/RJ45
on
23-De-21: the will
same. have
LCON
The Once to
Mr. work
handoff
thisAbdul with
issue atcalledBSNL/MTNL
both
will Carrier
bethe end)
resolved to
and setup
informed
Carrier infrastructure
will them
shared that EDDto
TCL provide
should theinstallconnectivity
a new MUX OFC this fromdelivery POP
-1.OBS
PLAN-B:
TCL
cabling
Location Lead Team Time
PoP can
Domest
work toatcontact
details complete
be the connected
Connect
are details
already
site.TCL the+for APH of cascaded
Feasibility
with
shared
team Nodal
Copper with
contacted person
is 15 with days
Router
LCON Mr. Mr.
Serial
for but
Rahul.Rahul SITA
Interface
arranging and Maurya
Requested
heaccess shared
informed withOBS
to expedite
Trenching Carrier on to
BSNL
permission startend the
and
is in-building
not should
available revert yet.
--Challenge:
level.
and
-HW
cabling
in
2.OBS
BSNL
weekTCL
Feasibility
at will
Product
is
Site requested
was
work
time on
. on
have
manager
not
Site
at
fromOBSto
preapred
Survey
the
to
PoP
site.TCL
now.
work
isto
check
end
completed
with
reviewing
another
was
team this
BSNL/MTNL
the
sudden
never.finaloptions
CCTrequested
contacted EDDchange
requested
to
(1-Direct
Mr.Awaited
setup
feasibility
in
as
Rahul. plan connectivity
confirmed
.them
infrastructure
with SRF2
and
OBS
, Also
he LCON
by
Pending
counterinformed
to
between
BSNL informed
in
. carrier
provide
part last
Trenching
beforethe
us POP
that
call.Same and
TCL
permission
connectivity
proceeding. has Customer
staff
been
with
can
isonnotOFC
visit
requested
available
from
on site
POPnow.
yet.
3-Dec-21:
He
3.BSNL
during
--1.OBS Leadwill
Feasibility
Site/Optical/RJ45 arrange
will LCON
13/12/2021
Time have OBS
to completeMr.
permission
to PoP
handoff Abdul
install end
17/12/2021
the atcalled
MEAandwas
both
Feasibility Carrier
confirm
never
the
hardware as end)
they and
us.
isus.at
15 ESD
are informed
our
daysbusyAdvised
POP as inconfirmed
location
butInterface ODM
operational
SITA that
to by
(space,
Requested TCL
inform
BSNL
task should
power,
in in last
frist
tocarrier
expedite install
cable to
week start
call.Same a
route,
of
on BSNL new working
hasMUX been
permissions
December. end andfor IBDthis
requested
shouldwoulddelivery
work while
benow.
revert
He
level.
and BSNL
We willare
TCL PoP
isarrangecan
requested
expect
was not be connected
permission
increase
preapredto check in and
forcostwith
another
thisconfirm
to Copper
make
sudden options itwith
ESD
standard.
change Serial
Advised
(1-Direct in plan ODM
connectivity
, Also toLCON
inform between
informed OBS to
us start
POP
that working
and
TCL Customer
staff on
can IBDvisit work on while
site
Mr
-Challenge:
required).
02-Dec-21:
in
2.OBS LeadRahul
week Time
will arranges
time to
Update
have complete
from permisson
on site
now.
tohandoff
work the
with survey for
Feasibility
BSNL/MTNL trenching
is still is 15
pending
to , Also
days
setup informed
but
, informed
requested SITA
infrastructure TPM
Requested
SITAto to TPMescalate
to expedite
to advise the case on
the status to
BSNL Mr. endRamchanadni
and and
byOFC should
when site as he
revert
Mr
-during
informed
in We Rahul
Site/Optical/RJ45
3.BSNL week need will arranges
usto
13/12/2021
time have beto
assess
that
from all permisson
install
to
now. how
required at
+MEA
two
17/12/2021 for
both
different
permission trenching
the
hardware end)
as options at
product
they areare,our
Also
busy POP
can
available inlocation
be marked
operational
now. TPM asto
(space, MCS
taskprovide
escalate
power,
in frist the
cable
week connectivity
case oftoDecember.
route, Mr. with
Ramchanadni
permissions from
would asPOPhe
be
-1.OBS
PLAN-B:
survey
level.
informedBSNL
Challenge:
required).
22-Nov:
PoP
report
is us
can
Domest
requested
Solution
will
that
connected
Connect
be
all
has to available.
required
notcheck been
APH with
another
permission
finalized
Copper
cascaded
by
with
areRouter
aSE
Serial
(1-Direct
available
hence
Interface
connectivity
now.
order is not between
reaised with OBS OBS POP yet. and Customer
02-Dec-21:
Action:
-Site/Optical/RJ45
2.OBS BSNL
Product
30-Nov-21: isESD
will Update
will
requested
have
manager
Site escalate
to
survey on
to
work
is site
check
is it
with
reviewing survey
to
scheduled Mr
another
BSNL/MTNL
the is still
Ramchandani
final
for optionspending
to setup
feasibility
30th Nov as ,
(1-Direct requested
he
and said
infrastructure
with 1 OBS
Dec all
connectivity , SITA
permissions
counter
Scheduled TPM
to between
provide
part tois advise
are
before avaialable
the
fixed OBS thePOP
connectivity
with status
proceeding.
LCON andbut and
as
Customer
over with by
perthe when
Mr
OFC Rahul
Phone from site POP
3.BSNL
Action:
1.OBS
PLAN-B:
01-Nov: PoPwill
ESD have
can
Domest
Order will be
has to handoff
escalate install
connected
Connect
been at
it+MEA
placed toAPHboth
Mrhardware
with the
Ramchandani
Copper
cascaded
with end)
OBS. at
with ourawaited.
Router asPOP
Serial he location
said
Interface (space,
all permissions power, are will cable
avaialable route, but permissions
ascase
per Mr would beSite
Rahul call.
-survey
Trenching
Site/Optical/RJ45
level.
surveyWe are
Challenge:
required).
Trenching
reportexpect
repport will
permission
permission is be
handoff
increase
awaited available.
is still
is
at
infrom
still
not
both
cost
not
avaialable
to
carrierthemake
avaialable
end)
end itCOF
,standard.
,
If no
If no
update
update
Hardware
from
from
AAI then
AAI
is live
then
with
Sunil
Sunil
4G escalate
will
SIM.
escalate
the
the case
to HQ
to HQ
2.OBS
--14thProduct
We Oct
30-Nov-21:
16-Dec-21: will have
:manager
As Site
SITA per to
TPMthe
survey work
isinstall iswith
reviewing
feasibility
escalated scheduled BSNL/MTNL
the
MTNL
to Mr final
for isproduct
only
30th to oursetup
feasibilityavailable
Nov and infrastructure
with 1at OBS
Dec counter
DEL,Ramchandani
.(space,
Scheduled to provide
part isbefore the
fixed connectivity
withproceeding.
LCON over with the OFC Phone from POP
call. Site
Challenge:
3.BSNL need
29-Nov-21:TPM
1.OBS PoPwill tohave
can assess
be to
Email how
connected sent MEA
two to LCON
with hardware
different MrRamchandani
Copper at
Abdul POP
can
Kadhir and
be location
to Mr
marked
arrange asTCL MCS power,
for site provided
cable
survey onthe
route,
the30th
fresh Nov approval
permissions 2021 to lay
would
and 01 fiber
beDec
PLAN-B:
16-Dec-21:
level.
-Quote
We are
survey
inside
1.OBS
required).
Domest
repport
the
PoP SITA
expect
approvedbuidling
can
Connect
TPM
increase
by
is1700lt.
be awaited
as SFA
connected escalated
well last +from
in, he
APH
cost
week
with tocascaded
to
carrier
also Mrmake
22nd
shared
Copper end itwith
Sep Router
Ramchandani standard.
new
with
Serial
. OrderSPOC
Serial toInterface
and be
details
Interface Mr Ramchandani
submitted
as below to: OOSD provided . Just require fresh approval
clarification toonlay fiber
Offer
-22-Nov:
2021
2.OBS
Product
inside
3.BSNL
-code
We need
1000a,
will
the
from
29-Nov-21:TPM
QNBS have
manager
willbuidling
tohave
OBS
to team
assess to toas
sourcing
Email
work
is is
install
how
checking
well
sent
with
reviewing , to
MEA
two
team hedifferent
alsofeasibility
BSNL/MTNL
the
.hardware
LCON final
shared
Mrproduct
from
to
atnew
Abdul
setup
feasibility
our
BSNL
SPOC
POPbelocation
can
Kadhir
at
infrastructure
with details
to
POP
OBS
marked
arrange
end.
counter
as(space,
below
asTCL
In
to
MCS
parallel,
provide
part
for before
: site survey
power,
we
the are
connectivity
cable route,
checking
proceeding.
on 30th
Domestic
with
permissions
Nov 2021 would
OFC connect
from
and 01be
POP
Dec