Maharashtra State Road Development Corporation Limited, Mumbai.

Construction of access controlled Nagpur-Mumbai super communication expressway (Maharastra Samruddhi Mahamarg) in the state of Maharashtra on EPC mode for construction of package-16, from km 664.479 to km 701.362
(section- village Birwadi to Village amne) in District Thane.
EPC: Navayuga Engineering Company Limited
Authority's Engineer: M/s ICT Pvt. Ltd.Jv with Yuksel Project Uluslararai A.S in Association with Streamline Infrastructure Pvt. Ltd

Request for Inspection Summary Date 01.03.2022


Chainage Length Date of
S.No. Type RFI No Side Description Date of Submission Time Time Status
From To (m) Inspection
HIGHWAY
1 HW NEC/HW/4192 685+860 685+916 56 RHS FDD checking for Embankment 8th Layer 01.03.2022 6:00 PM 02.03.2022 11:00 AM
2 HW NEC/HW/4193 685+860 685+916 56 LHS FDD checking for Embankment 8th Layer 01.03.2022 6:00 PM 02.03.2022 11:00 AM
FDD checking for confinement 8th layer and
3 HW NEC/HW/4194 685+924 686+020 96 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
rockfill embankment 4th layer
Checking for Filtermedia 5th layer at PUP A2
4 HW NEC/HW/4195 682+285 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
side Ch: 682+285 BHS
Checking for Filtermedia 5th layer at PUP A1
5 HW NEC/HW/4196 682+285 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
side Ch: 682+285 BHS
Checking for Filtermedia 2nd layer at Box
6 HW NEC/HW/4197 682+120 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
culvert A1 side Ch: 682+120 BHS
FDD checking for Embankment 2nd Layer
7 HW NEC/HW/4198 682+122 682+130 8 LHS with Filter media at Box culvert A2 side Ch: 01.03.2022 6:00 PM 02.03.2022 11:00 AM
682+120 to 682+130 BHS
FDD checking for Embankment 3rd Layer
8 HW NEC/HW/4199 + +95 95 RHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-2)
FDD checking for Embankment 3rd Layer
9 HW NEC/HW/4200 + +95 95 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-2)
FDD checking for Embankment 3rd Layer
10 HW NEC/HW/4201 + +200 200 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-3)
FDD checking for Embankment 3rd Layer
11 HW NEC/HW/4202 + +200 200 RHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-3)
FDD checking for Embankment 28th Layer
12 HW NEC/HW/4203 700+250 700+400 150 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-4)
FDD checking for Embankment 21st Layer
13 HW NEC/HW/4204 700+400 700+550 150 LHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-4)
FDD checking for Embankment 21st Layer
14 HW NEC/HW/4205 700+400 700+550 150 RHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
(Ramp-4)
Checking for Filtermedia 5th layer at Box
15 HW NEC/HW/4206 672+557 700+550 27993 BHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
culvert A1&2 side Ch: 672+557 BHS

16 HW NEC/HW/4207 671+620 671+800 180 RHS Levels and FDD Checking for GSB top layer 01.03.2022 6:00 PM 02.03.2022 11:00 AM

TUNNEL
1 TNL NEC/TNL/3334

Page 1 of 3
Request for Inspection Summary Date 01.03.2022
Chainage Length Date of
S.No. Type RFI No Side Description Date of Submission Time Time Status
From To (m) Inspection
STRUCTURE
Reinforcemnt, shuttering alignment and
1 STR NEC/STR/7418 674+147 LHS Concrete pouring for Abutment A1 wall 2nd 01.03.2022 6:00 PM 02.03.2022 10:00 PM
Lift LHS at khutghar interchange Ch: 674+147

Reinforcemnt, shuttering alignment and


2 STR NEC/STR/7419 698+120 RHS Concrete pouring for P29 pier final Lift RHS at 01.03.2022 6:00 PM 02.03.2022 9:00 AM
Viaduct Ch: 698+120
Segment Lifting, alignment, gluing and
3 STR NEC/STR/7420 667+763 RHS 01.03.2022 6:00 PM 02.03.2022 10:00 AM
stressing of LG-1: P50-P51 RHS
Shuttering alignment and Concrete pouring for
4 STR NEC/STR/7421 683+647 01.03.2022 6:00 PM 02.03.2022 10:00 AM
bottom PCC at VUP Ch: 683+674
Reinforcement, Shuttering checking and
concrete Pouring for PSC Post-Tensioned Pre-
5 STR NEC/STR/7422 670+000 RHS 01.03.2022 6:00 PM 02.03.2022 11:00 AM
Cast Segment-3A ID:FS-11 of Span P41-P42
RHS of Viaduct Ch: 667+763
Intial stressing for PSC Post-Tensioned Pre-
6 STR NEC/STR/7423 670+000 RHS Cast Segment-2A ID:FS-09 of Span P34-P35 01.03.2022 6:00 PM 02.03.2022 10:00 AM
RHS of Viaduct Ch: 667+763
Intial stressing for PSC Post-Tensioned Pre-
7 STR NEC/STR/7424 670+000 RHS Cast Segment-3 ID:FS-06 of Span P31-P32 01.03.2022 6:00 PM 02.03.2022 11:00 AM
RHS of Viaduct Ch: 667+763
Intial stressing for PSC Post-Tensioned Pre-
8 STR NEC/STR/7425 670+000 RHS Cast Segment-3 ID:FS-12 of Span P36-P37 01.03.2022 6:00 PM 02.03.2022 10:00 AM
RHS of Viaduct Ch: 667+763

QC

Page 2 of 3
Request for Inspection Summary Date 01.03.2022
Chainage Length Date of
S.No. Type RFI No Side Description Date of Submission Time Time Status
From To (m) Inspection
1 QC NEC/QC/348

CULVERTS/DRAIN

SURVEY
Shuttering alignment and levels checking for
1 SRY NEC/SRY/3140 674+147 LHS Abutment A1 wall 2nd Lift LHS at khutghar 01.03.2022 6:00 PM 02.03.2022 10:00 PM
interchange Ch: 674+147
Shuttering alignment and levels checking for
2 SRY NEC/SRY/3141 698+120 RHS P29 pier final Lift RHS at Viaduct Ch: 01.03.2022 6:00 PM 02.03.2022 9:00 AM
698+120
Shuttering alignment and levels checking for
3 SRY NEC/SRY/3142 683+647 01.03.2022 6:00 PM 02.03.2022 10:00 AM
bottom PCC at VUP Ch: 683+674