Professional Documents
Culture Documents
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION FINALCAD
LOCATION DESCRIPTION OF WORK COMPANY TIME PIC RTO REMARKS SIGN
N NO. NO.
A EXTERNAL INSPECTION
B B4 INSPECTION
1st & 2nd fix Electrical service installation inspection at Riser lobby
1 B4 Zone 8 BK 2525 1434 11:00 am Hasan SDK/BK
(B4.4.423.CIR)
C B3 INSPECTION
D B2 INSPECTION
3 B2 Zone 3 1st & 2nd fix SPK service installation inspection at GL:31-34/B-C B-MECH 1988 6813 10:00 am Hasan/Bangwe SDK/BMECH
DAILY INSPECTION SCHEDULE DATE: 5 December 2023
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION FINALCAD
LOCATION DESCRIPTION OF WORK COMPANY TIME PIC RTO REMARKS SIGN
N NO. NO.
E B1 INSPECTION
1 B1 FM Defects closing inspection at Basement 1 SDK N/A NA 2:00PM Jayson A. Mr. Jeffrey Tan
2 B1 Zone 3 B1 z3 1stFix SPK B1 NorthCourthyard GL28-34,E-K B-MECH 2588 7164 10:00 am Hasan/Seenu SDK/B-MECH
F LTC INSPECTION
1 LTC L1 FM DEFECTS CLOSING INSPECTION FOR LIFTS SLS (Schindler) NA NA 9:30 am Jayson P Mr. Albert
10:30am-
2 B1 LTC Continuation of Stage 3 testing inspection for Electrical system at Z-09 UG 5534 9659 Florence Mr. Albert
5:00pm
Green bar defects closing inspection for Electrical system and ELV
3 B1-RF Elec-Elv NA Refer to FC # 5:40 pm Florence Mr. Albert
system
4 B1 LTC Stage 4 testing inspection for KFAF-LTC-B1-01A TO F TAE 17274 9121 Florence Mr. Leong
1:30pm-
7:30pm
5 B1 LTC Stage 4 testing inspection for FAF-LTC-B1-07A TO C TAE 15401 8715 Florence Mr. Leong
G SOC INSPECTION
H TOWER INSPECTION
1 L4T5 SOI 167 DUCT 1F 2F NEP ROOMS (PANDEMIC CONVERSION) TAE 199 3553 Muthu/Vinod Mr. Yay Chan
2 L4T5 SOI 167 ELEC 1F 2F NEP ROOMS (PANDEMIC CONVERSION) TAE 16544 3554 Muthu/Vinod Mr. Yay Chan
9:30-11:30 am
3 L4T5 SOI 167 BMS 1F 2F NEP ROOMS (PANDEMIC CONVERSION) TAE 16545 3555 Muthu/Vinod Mr. Yay Chan
4 L4T56 SOI-305 PANEL RELOCATION AT AHCH UG 5595 3825 Muthu/Vinod Mr. Yay Chan
326 ROOM FUNCTION CHECK LINK BRIDGE CORRIDOR SDK & ALL M&E
5 L4 T34-T56 LINK BRIDGE 326 3826 1:30 pm Muthu/Vinod Mr. Yay Chan
L4.3.446.CIR subcon
SDK & ALL M&E
6 T7L2 326 -ROOM FUNCTION TEST FOR ICU DISP ROOM at L2.5.107-1 MIC 326 5576 Ramesh Mr. Yay Chan
subcon
SDK & ALL M&E
7 T7L2 326 -ROOM FUNCTION TEST FOR ICU CLEARNER ROOM at L2.5.10 326 5577 Ramesh Mr. Yay Chan
subcon
SDK & ALL M&E 2:00 pm-to-
8 T7L2 326 -ROOM FUNCTION TEST FOR ICU DU ROOM at L2.5.107 MICU. 326 5578 Ramesh Mr. Yay Chan
subcon 07:00pm