DAILY INSPECTION SCHEDULE DATE: 22 November 2023

RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION
LOCATION DESCRIPTION OF WORK COMPANY FINALCAD NO. TIME PIC RTO REMARKS SIGN
N NO.

A EXTERNAL INSPECTION

B B4 INSPECTION

C B3 INSPECTION

9:00 am to
1 B3/CDS/ Zone 4 stage3 inspection for MG service at B3 CDS manifold room. AL (Air Liquide) 1636 3717 Hasan Mr. Alfred Seah
11:00am
stage3 particulate and cross connection test inspection for MG service at 2:00 pm to
2 B3/CDS/ Zone 4 AL (Air Liquide) 1767 4201 Hasan Mr. Alfred Seah
B3 CDS manifold room. 4:00pm
327 Above ceiling inspection at B3/Admin Office/ B3.2.622-1.NE/ GL:42- SDK & ALL M&E
3 B3/CDS/ZONE 4 327 4191 5.00 pm Hasan/Kennedy Mr. Alfred Seah
45/GH subcon
SDK & ALL M&E
4 B3/CDS/ZONE 4 327 Above ceiling inspection at B3/Office/ B3.2.622-2.NE/ GL:42-45/GH 327 4194 5.50 pm Hasan/Kennedy Mr. Alfred Seah
subcon

D B2 INSPECTION

1 B2 SOC Manifold Room Stage 3 Testing inspection for MG service at B2 SOC AL (Air Liquide) 1772 7423 2:00 pm Hasan/Bangwe Mr.Saravanan

E B1 INSPECTION

9:30am~11:30a Mr. Jeffery / Mr.


1 T1 to 6 EACS Stage 3 inspection for Auto/Manual Security doors PT TBA TBA Yan / May
m Aung
9:00 am-to
2 B1 Zone 11 Inspection for Stage 4 Decon shower GL: 34 to 37/ V to W B1 Zone 11 MEC 2471 9095 Hasan/Mujaffar Mr. Jeffery
11:00am
BMS Stage 3 testing inspection for ACMV FCU (DDC-B1-15A @ AHU
3 B1 Zone 7 TAE 16193 8835 2:00 pm Hasan/Mujaffar Mr. Jeffery
ROOM B1.3.203.ME
SDK & ALL M&E
4 B1 Zone 3 327 Above ceiling inspection at DB Rooom ( B1.3.421.ME) GL:30-32/J-K 327 8387 3:30 pm Hasan/Mujaffar Mr. Jeffery
subcon
326 Room function test inspection at Comms room (B1.3.405.ME) GL:28- SDK & ALL M&E
5 B1 Zone 3 326 8913 5:50 pm Hasan/Mujaffar Mr. Jeffery
29/C-D subcon

F LTC INSPECTION
DAILY INSPECTION SCHEDULE DATE: 22 November 2023
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION
LOCATION DESCRIPTION OF WORK COMPANY FINALCAD NO. TIME PIC RTO REMARKS SIGN
N NO.

1 L3 LTC Bus bar equipment delivery inspection at Z-18 UG 5557 1029 Florence Mr. Albert
9:45am-
11:00am
2 L3 LTC Bus bar insulation testing inspection electrical riser Z-18 UG 5559 1030 Florence Mr. Albert

Refer to FC Refer to FC
3 B1-RF LTC Green bar defects closing inspection for Electrical and Elv system ELEC-ELV 1:30pm Florence Mr. Albert
Defects Defects

4 L7 LTC Stage 3 testing inspection for Electrical system at GL 2.1-13.1/R.1-U Z-18 UG 5556 892 2:30-7:30pm Florence Mr. Albert

SOI # 061 closing inspection for Bms trunking/conduit c/w cable water
5 B1 LTC TAE 17127 9092 11:30 am Florence Mr. Leong
meter
Refer to FC Refer to FC
6 B1-RF LTC Green bar defects closing inspection at Z-09 and Z-18 MECH'l 1:30 pm Florence Mr. Leong
Defects Defects
Stage 4 functional testing inspection for FCU-LTC-L4-01A/B at medical
7 L4 LTC TAE 16999 636 Florence Mr. Leong
supplies & prep room

8 L4 LTC Stage 4 functional testing inspection for FCU-LTC-L4-04 at PT/OT room TAE 17002 639 Florence Mr. Leong

Stage 4 functional testing inspection for FCU-LTC-L4-02 at NS station


9 L4 LTC TAE 17000 637 2:30-7:30pm Florence Mr. Leong
room
Stage 4 functional testing inspection for FCU-LTC-L4-03 at Quiet room
10 L4 LTC TAE 17001 638 Florence Mr. Leong
GL10.1-11.1/T
Stage 4 functional testing inspection for FCU-LTC-L4-05A/B at Iso room
11 L4 LTC TAE 17003 640 Florence Mr. Leong
GL10.1-11.1/R.1-S

G SOC INSPECTION

SDK & ALL M&E


1 L4 FM defects clearing inspection NA NA 2:15 pm Zeyar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
2 SOC L4-L7 326-M&E Functional test inspection ST-01 L4 to L7 326 822 10:00 am Adhi/Sundar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
3 SOC L4-L7 326-M&E Functional test inspection ST-02 L4 to L7 326 821 11:10 am Adhi/Sundar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
4 SOC L4-L7 326-M&E Functional test inspection ST-03 L4 to L7 326 820 3:00 pm Adhi/Sundar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
5 SOC L6 326-M&E Functional test inspection at L6.1.301.ADM 326 418 4:00 pm Adhi/Sundar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
6 SOC L6 326-M&E Functional test inspection at L6.1.302.ADM 326 419 6:00 pm Adhi/Sundar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
7 SOC L6 326-M&E Functional test inspection at L6.1.303.ADM 326 420 6:30 pm Adhi/Sundar Mr. Tan Ming Lei
subcon
SDK & ALL M&E
8 SOC L5 326-M&E Functional test inspection at L5.1.310.SOC 326 558 9:30 am Adhi/Sundar Mr Saravanan
subcon
DAILY INSPECTION SCHEDULE DATE: 22 November 2023
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION
LOCATION DESCRIPTION OF WORK COMPANY FINALCAD NO. TIME PIC RTO REMARKS SIGN
N NO.
SDK & ALL M&E
9 SOC L5 326-M&E Functional test inspection at L5.1.310-1.SOC 326 584 10:30 am Adhi/Sundar Mr Saravanan
subcon
SDK & ALL M&E
10 SOC L5 326-M&E Functional test inspection at L5.1.322.SOC 326 606 3:00 pm Adhi/Sundar Mr Saravanan
subcon
SDK & ALL M&E
11 SOC L5 326-M&E Functional test inspection at L5.1.311.SOC 326 585 3:30 pm Adhi/Sundar Mr Saravanan
subcon
SDK & ALL M&E
12 SOC L5 326-M&E Functional test inspection at L5.1.312.SOC 326 564 4:00 pm Adhi/Sundar Mr Saravanan
subcon
SDK & ALL M&E
13 SOC L5 326-M&E Functional test inspection at L5.1.901.SOC 326 649 6:00 pm Adhi/Sundar Mr Saravanan
subcon
SDK & ALL M&E
14 SOC L5 326-M&E Functional test inspection at L5.1.902.LOB 326 650 6:30 pm Adhi/Sundar Mr Saravanan
subcon

H TOWER INSPECTION

SDK & ALL M&E


1 T3,4 L1,2,3,4 FM DEFECTS CLEARING NA NA 9:30 am Myo/Pandi Mr. Shek Kun Lee
subcon

PRESSURE TEST INSPECTION FOR PLUMBING PIPE CONCEALED


2 T1&2 L4-7 KWC 3416 603 9:30 am Kasi Mr. Sim Tong Seng
PIPE AND ABOVE CEILING PIPE (L7-L4 FWS)GL 22-41/C-G

326 M&E ROOM FUNCTION CHECK INSPECTION FOR BED-B2/C SDK & ALL M&E
3 T2L2 326 5450 10:00 am DINESH Mr. Sim Tong Seng
L2.2.616.CH subcon
327 M&E ROOM COMMENTS CLEAR AT INSPECTION FOR BED-B2/C SDK & ALL M&E
4 T2L2 327 3791 10:30 am DINESH Mr. Sim Tong Seng
L2.2.616.CH subcon
326 M&E ROOM FUNCTION CHECK INSPECTION FOR BED B2/C SDK & ALL M&E
5 T2L2 326 5151 10:30 am DINESH Mr. Sim Tong Seng
L2.2.610.CH subcon
327 M&E ROOM COMMENTS CLEAR AT INSPECTION FOR BED-B2/C SDK & ALL M&E
6 T2L2 327 3674 11:00 am DINESH Mr. Sim Tong Seng
L2.2.610.CH subcon
326 M&E ROOM FUNCTION CHECK INSPECTION FOR BED-B2/C SDK & ALL M&E
7 T2L2 326 5452 11:30 am DINESH Mr. Sim Tong Seng
L2.2.602.CH subcon
327 M&E ROOM COMMENTS CLEAR AT INSPECTION FOR BED-B2/C SDK & ALL M&E
8 T2L2 327 3793 1:30 pm DINESH Mr. Sim Tong Seng
L2.2.602.CH subcon
326 M&E ROOM FUNCTION CHECK INSPECTION FOR BED-B2/C SDK & ALL M&E
9 T2L2 326 5453 5:00 pm DINESH Mr. Sim Tong Seng
L2.2.606.CH subcon
327 M&E ROOM COMMENTS CLEAR AT INSPECTION FOR BED-B2/C SDK & ALL M&E
10 T2L2 327 3794 5:30 pm DINESH Mr. Sim Tong Seng
L2.2.606.CH subcon
326 M&E ROOM FUNCTION CHECK INSPECTION FOR BED-B2/C SDK & ALL M&E
11 T2L2 326 5454 6:00 pm DINESH Mr. Sim Tong Seng
L2.2.613.CH subcon
327 M&E ROOM COMMENTS CLEAR AT INSPECTION FOR BED-B2/C SDK & ALL M&E
12 T2L2 327 3792 6:30 pm DINESH Mr. Sim Tong Seng
L2.2.613.CH subcon
326 M&E ROOM FUNCTION CHECK INSPECTION FOR BED-B2/C SDK & ALL M&E
13 T2L2 326 5455 7:00 pm DINESH Mr. Sim Tong Seng
L2.2.619.CH subcon
DAILY INSPECTION SCHEDULE DATE: 22 November 2023
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION
LOCATION DESCRIPTION OF WORK COMPANY FINALCAD NO. TIME PIC RTO REMARKS SIGN
N NO.
327 M&E ROOM COMMENTS CLEAR AT INSPECTION FOR BED-B2/C SDK & ALL M&E
14 T2L2 327 3666 7:30 pm DINESH Mr. Sim Tong Seng
L2.2.619.CH subcon

15 T5,6 L4 Site memo closure inspection ME-0067 SDK 0012 3756 9:30 am Zeyar Mr. Yay Chan

SDK & ALL M&E


16 L5T6 327-M&E ABOVE CEILING INSPECTION IN RISER LOBBY L5.4.423.ME 327 857 9:30 am Muthu/Vinod Mr. Sim Hee Chuan
subcon
SDK & ALL M&E
17 L6T6 327-M&E ABOVE CEILING INSPECTION IN RISER LOBBY L6.4.423.ME 327 750 10:00 am Muthu/Vinod Mr. Sim Hee Chuan
subcon
327-M&E ABOVE CEILING INSPECTION IN TERRACE SPILL OUT SDK & ALL M&E
18 L6T5-6 327 751 10:30 am Muthu/Vinod Mr. Sim Hee Chuan
L6.4.445.CIR subcon
SDK & ALL M&E
19 L7T6 327-M&E ABOVE CEILING INSPECTION IN RISER LOBBY L7.4.423.ME 327 541 11:00 am Muthu/Vinod Mr. Sim Hee Chuan
subcon
327-M&E ABOVE CEILING INSPECTION IN RISER LOBBY L7.4.480, SDK & ALL M&E
20 L7T6 327 540 11:30 am Muthu/Vinod Mr. Sim Hee Chuan
481, 482, 486, 483, 484, 485.PHA subcon
327-M&E ABOVE CEILING INSPECTION IN TERRACE SPILL OUT SDK & ALL M&E
21 L7T5-6 327 542 1:30 pm Muthu/Vinod Mr. Sim Hee Chuan
L7.4.445.CIR subcon
SDK & ALL M&E
22 L7T5 327 M&E ABOVE CEILING INSPECTION AHU ROOM L7.4.104.ME 327 543 2:00 pm Muthu/Vinod Mr. Sim Hee Chuan
subcon
SDK & ALL M&E
23 L7T5 327 M&E ABOVE CEILING INSPECTION AHU ROOM L7.4.355.ME 327 544 2:30 pm Muthu/Vinod Mr. Sim Hee Chuan
subcon
SDK & ALL M&E
24 L7T5 327 M&E ABOVE CEILING INSPECTION AHU ROOM L7.4.523.ME 327 545 3:00 pm Muthu/Vinod Mr. Sim Hee Chuan
subcon
SDK & ALL M&E
25 L7T5 327 M&E ABOVE CEILING INSPECTION AHU ROOM L7.4.702.ME 327 546 3:30 pm Muthu/Vinod Mr. Sim Hee Chuan
subcon
327 M&E above ceiling installation inspection for ICU FAMILY CONSULT SDK & ALL M&E
26 T7L2 327 4642 Ramesh Mr. Yay Chan
at L2.5.340 MICU. subcon
327 M&E above ceiling installation inspection for ICU WAIT ROOM at SDK & ALL M&E
27 T7L2 327 5024 Ramesh Mr. Yay Chan
L2.5.341 MICU. subcon
327 M&E above ceiling installation inspection for ICU CENTRAL SDK & ALL M&E
28 T7L2 327 4845 Ramesh Mr. Yay Chan
SUPPLAY CORRIDOR at L2.5.303 MICU. subcon
327 M&E above ceiling installation inspection for ICU CENTRAL COLLAB SDK & ALL M&E
29 T7L2 327 4846 Ramesh Mr. Yay Chan
SPACE at L2.5.311 MICU. subcon
327 M&E above ceiling installation inspection for ICU MEDS/PREP at SDK & ALL M&E 1:30 pm-TO-
30 T7L2 327 4847 Ramesh Mr. Yay Chan
L2.5.310 MICU. subcon 07:00PM
327 M&E above ceiling installation inspection for ICU CU L2.5.309 at SDK & ALL M&E
31 T7L2 327 4848 Ramesh Mr. Yay Chan
MICU. subcon
327 M&E above ceiling installation inspection for ICU CENTRAL COLLAB SDK & ALL M&E
32 T7L2 327 4849 Ramesh Mr. Yay Chan
SPACE at L2.5.224 MICU. subcon
327 M&E above ceiling installation inspection for ICU EQUIP STORE at SDK & ALL M&E
33 T7L2 327 4850 Ramesh Mr. Yay Chan
L2.5.221 MICU. subcon
327 M&E above ceiling installation inspection for ICU CORRIDOR at SDK & ALL M&E
34 T7L2 327 4852 Ramesh Mr. Yay Chan
L2.5.221-1 MICU. subcon
DAILY INSPECTION SCHEDULE DATE: 22 November 2023
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION
LOCATION DESCRIPTION OF WORK COMPANY FINALCAD NO. TIME PIC RTO REMARKS SIGN
N NO.

GREEN / PINK BAR


I
INSPECTION
SDK & ALL M&E 9:30 AM - Refer to Refer to
1 TOWER7 L2 WHC GREEN BAR INSPECTION NA NA Myo NOT REQUIRED
subcon 11:30AM Finalcad Finalcad
SDK & ALL M&E 9:30 AM - Refer to Refer to
2 TOWER3-4 Roof HO WHC GREEN BAR INSPECTION NA NA Arun NOT REQUIRED
subcon 11:30AM Finalcad Finalcad
SDK & ALL M&E 2:00PM - Refer to Refer to
3 T3-4 L7 WHC PINK BAR INSPECTION NA NA Arun NOT REQUIRED
subcon 5:30PM Finalcad Finalcad
SDK & ALL M&E 2:00PM - Refer to Refer to
4 ST20 & 05 WHC GREEN BAR INSPECTION NA NA Jayson/Thogaraj NOT REQUIRED
subcon 5:30PM Finalcad Finalcad
SDK & ALL M&E 2:00PM - Refer to Refer to
5 TOWER 1 L4 WHC GREEN BAR INSPECTION NA NA Myo NOT REQUIRED
subcon 5:30PM Finalcad Finalcad

STAGE 4 -BLUE BAR


J
INSPECTION
Refer on FC No
1 T1 & T2 STAGE 4 T&C T1 & T2 LIFT E-POWER & ALTERNATE HOMING SLS (Schindler) SLS to advise JAYSON P. Sim Tong Seng
of Lift 2:00 PM to 5:00
315-06-SCH- PM
2 T1 L1 WHC STAGE 4 T&C STAFF & PATIENT LIFT SL-07 SLS (Schindler) 9457 JAYSON P. Sim Tong Seng
0244
WHC STAGE 4 ; ALQ MECHANICAL TEST 1737/ 1775/ 8974/7426/742 2:00 PM to 5:00
3 SOC -B1 AL (Air Liquide) TBA Mr. Tan Ming Lei
(PURITY/FLOWRATE/MOISTURE TEST) 1773 4 PM
WHC STAGE 4 ; ALQ MECHANICAL TEST 1737/1775/177 8974/7426/742 2:00 PM to 5:00 Mr. LEONG SIN
4 LTC -B1 AL (Air Liquide) TBA
(PURITY/FLOWRATE/MOISTURE TEST) 3 4 PM WOON
9.00am - Mr.SEAH CHEE
5 B3 HS WHC STAGE 4: ALQ HS MANIFOLD ROOM AL (Air Liquide) 1637 3718 TBA
6.00pm KEONG
9.30am -
6 RF T3 T4 T5 T6 T7 T8 HR Handling over inspection at Roof B-MECH ? FC? Florence FM
11.30AM

7 L2 L3 T1 T 2 Stage 4 Flow switch testing inspection B-MECH ? FC? 1.30pm-4.30pm Florence Mr.Aung

8 All Towers FA & T&C closing comments inspection B-MECH ? FC? 1.30pm-4.30pm Florence FM

9:00 am - 11:00 Mr. Jeffrey / Mr.


9 B1 Z11 WHC STAGE 4: DECON SHOWER INSPECTION GL 34-37 / V-W MEC 2471 9095 TBA
am Aung
WHC Stage 4 T&C: ACMV
16343 #859
1.EAF-LTC-L7-01
15605 #826
2.FAF-LTC-L7-01 9.30AM -
10 LEVEL 7 (LTC) TAE 16362 #865 ⛔ TBA Mr. Leong
3.EAF-LTC-L7-02 11.30AM
16349 #862
4.FAF-LTC-L7-02
16377 #871
5.EAF-LTC-L7-05
DAILY INSPECTION SCHEDULE DATE: 22 November 2023
RESPECTIVE
PROJECT : WOODLANDS HEALTH CAMPUS SUBCON
MAIN CONTRACTOR : SDK CONSORTIUM
S/ INSPECTION
LOCATION DESCRIPTION OF WORK COMPANY FINALCAD NO. TIME PIC RTO REMARKS SIGN
N NO.
WHC Stage 4 T&C: ACMV
16944 #1402
1.EAF-SOC-L3-01A/B 9.30AM -
11 LEVEL 3 (SOC) TAE 16993 #1403 ⛔ TBA Mr. Saravanan
2.EAF-SOC-L3-02A/B 11.30AM
16997 #1404
3.EAF-SOC-L3-03A/B
WHC Stage 4 T&C: BMS
1.AHU-SOC-B1-01A/B
Mr. Jeffrey Tan/ Mr.
BASEMENT 1 and 2.FAF-AHU-B1-01A/B 16937 #9036 9.30AM -
12 TAE/QA ⛔ TBA Neo CS/ Mr. Lee
BASEMENT 2 3.AHU-B2-10A/B 15596 #7150 11.30AM
Shek Kun
4.FAF-AHU-B2-11A/B/C
5.KEF-T3-RF-02A/B/C
WHC Stage 4 T&C: BMS
14106 #3507
1.FCU-COMMS-B3-03 9.30AM - Mr. Neo CS/ Mr.
13 BASEMENT 3 TAE/QA 14129 #3514 ⛔ TBA
2.FCU-COMMS-B3-06 11.30AM Alfred
14507 #6912
3.FCU-B2-33
WHC Stage 4 T&C: ACMV
16251 #9540 2.00PM -
14 LEVEL 1 (TOWER 7) 1.PAHU-L1-02 TAE ⛔ TBA Mr. Yay Chan
16248 #9471 05.00PM
2.FAF-AHU-L1-13
WHC Stage 4 T&C: ACMV
16181 #7304 2.00PM -
15 BASEMENT 2 1.FCU-CSR-B2-11A/B TAE ⛔ TBA Mr. Neo CS
16592 #7375 05.00PM
2.TEF-B2-08A/B