Professional Documents
Culture Documents
(A Government of West
Company Limited
Bengal Enterprise)
Planning Investigation & Design Department
Data Centre Complex (4th
Floor), Action Area-1, Street no. 41, Wes
State Designated
engal
33/11 KV Sub-stn Campus (near
DLF-1), New Town, Rajarhat, Kolkata-700 163 Agendy
Phone: 033-2324 1514/1516/1519
**sl Mpngi Atate tiesti u i " , U i y r s h u t .qa dunp>ay Lwiten
E-mail: wbsedclhpc@gmail.com/wbsda.ec@gmail.com
(ii)Recording of rainfall & gauge discharge data for 01(one) year over Bandhu nala and
repairing & protection work of adjacent area of installed V-notch over Bandhu nala at
proposed Upper & Lower Dam location of Bandu Pumped Storage Project near Chattni
and Bhuda Village in Purulia,West Bengal.
All the members of the said committee are requested to make it convenient to be
present in the meeting at the said date and time
(A.K.Múdi)
Superintending Engineer (Elect.
PIDD, WBSEDCL &
Member-Convenor of the Committee
Memo No.PIDD/ Com nfttee108/324 D! 291ct|2e22
Copy forwarded for kind information:
The Director(Generation), WBSEDCL
2. Chief Engineer, PIDD WBSEDCL
3. Additional Chief Engineer, Pi&DD, WBSEDCL
4. Shri Biswarup Sadhukhan,SE(E) ,PPSP,WBSEDCL
5. Shri Diptendu Patra ,SE(C),PSPD,WBSEDCL
6. The Manager (HR&A),PI&DD,WBSEDCL
7. The Divisional Enginear(C)-1,PI&DD,WBSEDCL
8.The Divisional Engineer(C)-Ii, PI&DD,WBSEDCL
9. The Manager (F&A),PI&DD,WBSEDCL
Superintending Engineer(Elect.).PIDD
Registered Office: Vidyut Bhavan, Block-D), Sector-ll, Bidhannagar, Kolkata -700 091
CIN- U40109WB2007SGC113473, Website: www.wbsedel.in