Subject: Regarding Slow Progress of Survey Work.
Ref: 1. Contract Agreement No. 7/RDSS/Loss Reduction/Supply/MVVNL/2022-23 Dt. 21.01.2023
Sir
For your reference. RDSS loss reduction work under
been awarded to M/s NCC Limited,
Devipatan Zone (Cluster-5)/EDC-Gonda/EDD-I Gonda has
Hyderabad, and the agreement of the same has been done on 21/01/2023.
With reference to clause no.-2 (Survey) of Standard
Bidding Documents Part-2 (Employer's Requirements). "The initial
site survey will be carried out for tentative
freezing of the material requirement and the work content finalization, within
one month of commencement of the
project."
As per the progress report provided by M/s NCC Ltd, the current survey status of the EDD-I
table below:
Gonda, is as per the

Scope of Work EDD-I Gonda, EDC Gonda


Survey Scope in Existing 11 KV O/G Feeder 28
Survey Completed - As per TKC Daily Report (In Nos.)
04
(As reported by NCC. No AUTOCAD Drawing, Pole Schedule
with GPS received for survey verification)
Survey Completion Percentage % (As per TKC Daily Report) 14.28%
This is for your reference that the progress of survey work
against the above-awarded agreement is too slow,
affecting the overall progress of the whole project. The due date of the survey completion is 31/03/2023.

However, the overall progress of M/s NCC Ltd survey work is 14.28 % (Very Less)
Also, as of date, Manpower deployment by M/s NCC Ltd. for EDD-I Gonda =01 Nos. is Very Less.

So, it is highly recommended that M/s NCC Limited need to increase its workforce or resources to complete the
pending survey work in time. Quick action in this regard is required from M/s NCC Limited's side.

This is for your kind information and needful action. Abhishek gon
Copy To-Ciclre Incharge, EDC Gonda PMA RDSS Project, MVVNL WAPCOS Ltd, Lucknow Er. ABHISHEK GOND
Emallid- wapcosdevipatan@gmail.com Division In-charge, EDD-1 Gonda
Devipatan Zone, Gonda (Cluster-5)
PMA-RDSS Project, MVWNL-Lucknow

3k309, Vikrant Khand, Gomti Nagar, Lucknow (UP)-226010I Phone: 0522-4340328 1E-mailt: wapcosup@gmail.com
Head Office: 76-C Institutional Area, Sector-18, Gurugram-122015 (Haryana), INDIA
Tel
:91-124-23994p1-261 Fax: +91-124-2397392I Emal ho@wapcos.co.in, mal@wapcos.co.in IWebsite:http://www.wapcos.gov.in
:

CIN No: U74899DL1969GOI005070

Y
2419

You might also like