You are on page 1of 4

पावर सिस्टम ऑपरेशन कार्पोरेशन लिमिटेड

POWER SYSTEM OPERATION CORPORATION LIMITED.


क्षेत्रीय लोड प्रेषण केन्द्र
WESTERN REGIONAL LOAD DESPATCH CENTER

Date of Reporting:11-May-2022

Generating Unit Outage Report For


10-May-2022

A. Planned Outages
SL. Station State Agency Unit No Capacity Reason(s) Outage Expected Revival
No (MW) Date Time Date
CENTRAL SECTOR
1 KAWAS - UNIT 2A GUJARAT NTPC 4 106 to desynch/RSD 10-05-2022 23:46 -
2 KAWAS - UNIT 1B GUJARAT NTPC 2 106 to desynch 10-05-2022 23:57 -
3 KAWAS - UNIT 2B GUJARAT NTPC 5 106 To desynch 09-05-2022 21:48 -
Converted to RSD from Minor
4 KAWAS - UNIT 2C GUJARAT NTPC 6 116.1 30-04-2022 13:56 -
Overhauling./RSD
5 Gandhar - UNIT GT2 GUJARAT NTPC 2 144.3 RSD/RSD 27-04-2022 07:47 -
6 KAWAS - UNIT 1C GUJARAT NTPC 3 116.1 RSD/RSD 23-04-2022 06:00 -
7 VSTPS I MADHYA PRADESH NTPC 4 210 AOH 16-04-2022 23:56 01-06-2022
Annual Overhauling availed due to
8 KHARGONE MADHYA PRADESH NTPC 2 660 water constraint (only one unit 07-04-2022 02:18 11-05-2022
could run at a time)
due to problem in ash handling
9 BALCO CHHATTISGARH BALCO 4 300 plant/Converted to COH on 24-03-2022 00:19 30-06-2022
29-04-2022
RSD / RSD / Converted to Gas
10 Gandhar - UNIT ST GUJARAT NTPC 4 224.5 01-11-2021 12:30 -
Shortage from 28.03.2022
11 DGEN GUJARAT Gujarat 2 400 Non-avaiability of affordable gas 09-10-2021 20:56 -
12 DGEN GUJARAT Gujarat 1 400 Non-avaiability of affordable gas 22-08-2020 00:26 -
For cleaning of clogged basket
strainer of cooling water system due
to heavy ingress of debris from sea/
13 TARAPUR I MAHARASHTRA NPCIL 2 160 13-07-2020 00:01 04-01-2024
The outage extended for primary
system piping replacement and
refueling from 17-02-2022
14 DGEN GUJARAT Gujarat 3 400 Non-avaiability of affordable gas 22-06-2020 00:25 -
Refueling. While refueling
preparation, some repair works
15 TARAPUR I MAHARASHTRA NPCIL 1 160 08-01-2020 10:37 31-03-2023
identificed whiich are being
executed before refueling.
Total CS (Planned) 3,609
STATE SECTOR
1 APL MUNDRA GUJARAT APL-Adani 4 330 Reseve Shut down/RSD 09-05-2022 17:40 13-05-2022
Outage taken to attend HP (high
2 UKAI GUJARAT Gujarat 4 200 08-05-2022 09:15 12-05-2022
pressure) heater leakage for 96 hrs
Withdrawn under Reserve Shut
3 SUGEN 1 GUJARAT Gujarat 3 382.5 07-05-2022 00:52 -
down/RSD
Withdrawn due to uneconomical
4 UNOSUGEN GUJARAT Torrent Power (TPL) 1 382.5 21-04-2022 18:17 -
cost of gas
Annual Overhauling (For
5 KORBA(W) CSPGCL CHHATTISGARH Chattisgarh 2 210 installation of new DDCMIS work 16-04-2022 00:00 01-06-2022
and replacement of 59 no. RH coils)
Annual Overhauling (coal
6 SANJAY GANDHI TPS MADHYA PRADESH Madhya Pradesh 3 210 availability only for 4 units so one 15-04-2022 00:01 09-06-2022
unit taken under AOH)
Withdrawn due to uneconomical
7 SUGEN 1 GUJARAT Gujarat 1 382.5 08-04-2022 15:33 -
cost of gas
inspection work/converted to RSD
8 GPPC GUJARAT Gujarat 2 351 19-03-2021 17:17 -
from 2 may 22
ROTOR e/f, then out in capital
9 BANASAGAR TONS MADHYA PRADESH Madhya Pradesh 3 105 17-06-2020 02:08 31-05-2022
overhauling
10 GPEC GUJARAT Gujarat 3 138 Unit out of service as no PPA 20-07-2019 22:02 -
11 GPEC GUJARAT Gujarat 4 241 Unit out of service as no PPA 06-12-2018 16:36 -
12 WPCL MAHARASHTRA Maharashtra 1 135 Unit out of service as no PPA/RSD 25-11-2018 04:48 -
13 IEPL MAHARASHTRA IEPL 1 270 No PPA. 28-08-2018 21:26 -
P P A not present and sch not
14 PIONEER(262+127) MAHARASHTRA Maharashtra 1 388 07-02-2017 17:45 -
present
Total SS (Planned) 3,725.5

Total Planned Outage (CS+SS): 7,334.5

B. Forced Outages
SL. Station State Agency Unit No Capacity Reason(s) Outage Expected Revival
No (MW) Date Time Date
CENTRAL SECTOR
1 VSTPS II MADHYA PRADESH NTPC 1 500 BTL 10-05-2022 10:23 13-05-2022
turbine EH oil system maintenance
2 BALCO CHHATTISGARH BALCO 2 300 08-05-2022 02:00 20-05-2022
work.
3 RGPPL - UNIT 2A MAHARASHTRA RGPPL 3 331.75 Gas Shortage 03-05-2022 08:04 -
4 KAWAS - UNIT 1A GUJARAT NTPC 1 106 Gas Shortage 30-04-2022 01:09 -
5 JPL STG-I CHHATTISGARH Jindal power (JPL) 4 250 Condensor tube leakage 28-04-2022 06:10 13-05-2022
Due to APH-2A gear box abnormal
6 JPL STG-I CHHATTISGARH Jindal power (JPL) 2 250 26-04-2022 16:50 13-05-2022
sound.
due to CRH NRV (Cold Re-heat
7 JPL STG-I CHHATTISGARH Jindal power (JPL) 1 250 24-04-2022 22:14 13-05-2022
Non returning valve) Oil leakage
Withdrawn due to APH - A stalling
8 JPL STG-II CHHATTISGARH Jindal power (JPL) 1 600 21-04-2022 02:00 13-05-2022
problem.
9 RKM POWER CHHATTISGARH RKM 4 360 Coal Shortage/Coal Shortage 20-04-2022 00:42 15-05-2022
Due to both ID fan tripped on high
10 SKS POWER CHHATTISGARH SKS 1 300 31-03-2022 09:03 13-05-2022
vibration
Withdrawn on BTL. From 22:31
hrs/31.03.2022 reason converted to
11 SIPAT I CHHATTISGARH NTPC 2 660 29-03-2022 09:35 14-05-2022
primary water leakage in the
generator bushing area
Gas Shortage/No expected date due
12 RGPPL - UNIT 3A MAHARASHTRA RGPPL 5 331.75 23-12-2021 00:00 -
to less allocation of Gas
Tripped due to stalling of APH B.
13 SKS POWER CHHATTISGARH SKS 2 300 Out on commercial reasons from 21-11-2021 06:04 01-06-2022
13.03.22.
Fault in R ph GT/Converted to
commercial reasons since 31st
14 CGPL GUJARAT CGPL 4 830 January, 2022/ Converted to coal 21-11-2021 09:42 -
shortage from 01.05.2022/Coal
Shortage
Less availability of Gas/No expected
15 RGPPL - UNIT 3B MAHARASHTRA RGPPL 6 331.75 11-11-2021 20:58 -
date due to less allocation of Gas
Due to high vibration in turbine
bearing/converted to AOH since
30/10/2021/ Unit under forced
16 SIPAT I CHHATTISGARH NTPC 1 660 outage due to damaged stator 28-10-2021 10:41 30-06-2022
winding (Generator being Russian
make, being shifted from Barh to
Sipat)
due to high vibration in the
17 TRN ENERGY CHHATTISGARH TRN 2 300 10-03-2021 12:54 15-05-2022
TURBINE
Gas shortage/Due to unavailability
18 RGPPL - UNIT 1A MAHARASHTRA RGPPL 1 320 of Cooling tower damaged/ No 08-07-2014 13:30 -
expected date due to finance reason
Gas shortage/Due to unavailability
19 RGPPL - UNIT 1B MAHARASHTRA RGPPL 2 320 of Cooling tower damaged/ No 31-03-2014 23:00 -
expected date due to finance reason
Total CS (Forced) 7,301.25
STATE SECTOR
withdrawn due to boiler submerged
1 WPCL MAHARASHTRA Maharashtra 3 135 09-05-2022 09:30 12-05-2022
scraper conveyor chain broken
Tripped due to HP bypass Valve
2 PARAS MAHARASHTRA Maharashtra 3 250 09-05-2022 12:29 12-05-2022
gland leakage
Withdrawn due to APH high
3 APML TIRODA MAHARASHTRA ATIL-Adani 2 660 vibration and gearbox abnormal 08-05-2022 08:48 13-05-2022
sound.
4 BLTPS GUJARAT Gujarat 1 250 Boiler Tube Leakage 01-05-2022 18:00 12-05-2022
5 GHATGHAR MAHARASHTRA Maharashtra 1 125 Stator E/F 20-04-2022 00:35 01-07-2022
Tripped due to turbine vibration
high. Rotor despatched to
6 JAIGAD MAHARASHTRA Maharashtra 1 300 16-03-2022 23:18 -
Hyderabad. Revival date will be
known after inspection.
RSD/ Converted to Gas shortage
7 UTRAN STG II GUJARAT Gujarat 1 375 28-12-2021 11:30 -
since 23/03/22
RSD/ Converted to Gas shortage
8 GPPC GUJARAT Gujarat 1 351 26-10-2021 20:46 -
since 23/03/22
RSD/ Converted to Gas shortage
9 GSEG STG 2 GUJARAT Gujarat 1 351 26-10-2021 19:15 -
since 23/03/22
RSD/Converted to gas shortage
10 GIPCL STG GUJARAT Gujarat 2 32 26-10-2021 19:58 -
since 23/03/22
RSD/Converted to gas shortage
11 GIPCL STG GUJARAT Gujarat 3 32 26-10-2021 20:10 -
since 23/03/22
out on Non availability of gas/
Reason changed to RSD since
12 DGBP 1 GUJARAT Gujarat 1 107 12-10-2021 00:00 -
10:43hrs/17-10-2021/ Converted to
gas shortage since 23-03-22
tripped on Electrical
Problem/reason changed to RSD
13 DGBP 1 GUJARAT Gujarat 2 112 since 06:00hrs/17-10-2021/ 11-10-2021 04:10 -
Converted to gas shortage since
23-03-22
RSD. Reason changed to Non
availability of gas since
14 GSEG GUJARAT Gujarat 2 78 01.10.2021/changed to RSD since 20-09-2021 19:22 -
06:00hrs/13-10-2021/ Converted to
gas shortage since 23-03-22
Out on R PHASE DUCT FIRE
since 20.09.2021/13:04 hrs,
PROBLEM IN GCB from
15 DGBP 3 GUJARAT Gujarat 1 375 08-09-2021 15:57 -
29.12.2021/ Change to RSD 08:22
Hrs./26.02.2022/ Converted to gas
shortage since 23-03-22
RSD. RSD. Reason changed to Non
availability of gas since
16 GSEG GUJARAT Gujarat 1 78 01.10.2021/changed to RSD since 07-09-2021 18:34 -
06:00hrs/13-10-2021/ converted to
gas shortage since 23-03-22
Depletion of Coal Stock and
unaffordable cost of generation.At
17 APL MUNDRA GUJARAT APL-Adani 9 660 25-08-2021 02:33 -
present unit out due to commercial
issues with Haryana./Coal Shortage
Tripped due to tripping of GT due
to LA failure/ converted to coal
18 OPGS GUJARAT Gujarat 1 150 shortage/Converted to commercial 10-08-2021 04:47 -
reason due to costly coal. No PPA
with GUVNL.
Unit out of service as no PPA/
19 GPEC GUJARAT Gujarat 2 138 converted to gas shortage since 06-07-2021 08:26 -
23-03-22
Tripped due to abnormal sound &
Oil seepage from turbine bearing
no.1. From 19.07.21 taken under
AOH & converted to coal shortage
20 APL MUNDRA GUJARAT APL-Adani 8 660 from 02.09.21(Depletion of Coal 04-07-2021 00:57 -
stock & unaffordable cost of
generation).At present unit out due
to commercial issues with
Haryana./Coal Shortage
Technical problem/ converted to
coal shortage/Converted to
21 OPGS GUJARAT Gujarat 2 150 06-06-2021 01:18 -
commercial reason due to costly
coal.No PPA with GUVNL.
22 VADINAR GUJARAT EPGL-Gujarat 2 600 Coal shortage/Coal Shortage 11-03-2021 10:17 -
23 GIPCL STG 2 GUJARAT GSECL 1 165 Non availability of gas 20-12-2020 17:30 -
24 VADINAR GUJARAT EPGL-Gujarat 1 600 Coal shortage/Coal Shortage 15-12-2020 12:30 -
25 URAN MAHARASHTRA Maharashtra 7 108 Turbine blade failure 25-05-2020 12:51 01-10-2022
Total SS (Forced) 6,842

Total Forced Outage (CS+SS): 14,143.25

Regional Generation Outage Summary (MW)


Central Sector State Sector Regional Total
Planned Forced Total(CS) Planned Forced Total(SS) Outage(MW)
3,609 7,301.25 10,910.25 3,725.5 6,842 10,567.5 21,477.75

Generating Units Revived during last day which were out before 10 May, 2022
SL.No Station State Agency Unit No Capacity Reason(s) Outage Revival
Date Time Date Time
CENTRAL SECTOR
1 SSP(RBPH) GUJARAT SSP (SSNL) 2 200 As per schedule/RSD 09-05-2022 17:30 10-05-2022 14:45
2 KAWAS - UNIT 2A GUJARAT NTPC 4 106 To desynch 09-05-2022 21:33 10-05-2022 15:02
3 SSP(RBPH) GUJARAT SSP (SSNL) 1 200 As per schedule/RSD 09-05-2022 17:15 10-05-2022 15:00
4 Gandhar - UNIT GT1 GUJARAT NTPC 1 144.3 to desynch 09-05-2022 21:36 10-05-2022 15:01
5 SSP(RBPH) GUJARAT SSP (SSNL) 3 200 As per schedule/RSD 09-05-2022 17:45 10-05-2022 14:30
6 Gandhar - UNIT GT3 GUJARAT NTPC 3 144.3 to desynch 09-05-2022 21:28 10-05-2022 15:36
7 KAWAS - UNIT 1B GUJARAT NTPC 2 106 Withdrawn due to gas shortage 29-04-2022 00:57 10-05-2022 15:34
Total CS 1,100.6
STATE SECTOR
1 NASIK MAHARASHTRA Maharashtra 5 210 Tripped due to rotor earth fault. 09-05-2022 16:15 10-05-2022 10:30
2 PARLI MAHARASHTRA Maharashtra 8 250 withdrawn on BTL 07-05-2022 12:25 10-05-2022 17:37
3 BLTPS GUJARAT Gujarat 2 250 Drum Level Low 04-05-2022 10:00 10-05-2022 07:47
Due to abnormal sound coming
from APH-7A and oil leakage from
gear box.Converted to Coal
Shortage from16.07.2021.
4 APL MUNDRA GUJARAT APL-Adani 7 660 06-05-2021 06:01 10-05-2022 01:02
(Depletion of Coal Stock and
unaffordable cost of generation.)At
present unit out due to commercial
issues with Haryana./Coal Shortage
Total SS 1,370

Total Outage (CS+SS): 2,470.6


Generating Units Tripped and Synchronized within 24 hrs
SL.No Station State Agency Unit No Capacity Reason(s) Outage Revival
Date Time Date Time
CENTRAL SECTOR
Withdrawn as per schedule/Less
1 SSP(RBPH) GUJARAT SSP (SSNL) 4 200 10-05-2022 02:00 10-05-2022 21:45
Schedule
Withdrawn as per schedule/Less
2 SSP(RBPH) GUJARAT SSP (SSNL) 6 200 10-05-2022 02:45 10-05-2022 22:15
Schedule
Withdrawn as per schedule/Less
3 SSP(RBPH) GUJARAT SSP (SSNL) 5 200 10-05-2022 02:30 10-05-2022 22:00
Schedule
Total CS 600
STATE SECTOR
Tripped due to governing valve
1 KORADI MSEDCL MAHARASHTRA Maharashtra 9 660 10-05-2022 15:19 10-05-2022 18:42
problem
2 GANDHINAGAR(GTPS) GUJARAT Gujarat 5 210 Due to flame failure 10-05-2022 04:10 10-05-2022 07:22
Total SS 870

Total Outage (CS+SS): 1,470

Outages Under Reserve Shutdown


SL. Station State Agency Unit No Capacity Reason(s) Outage Expected Revival
No (MW) Date Time Date
CENTRAL SECTOR
1 KAWAS - UNIT 2A GUJARAT NTPC 4 106 to desynch/RSD 10-05-2022 23:46
Converted to RSD from Minor
2 KAWAS - UNIT 2C GUJARAT NTPC 6 116.1 30-04-2022 13:56
Overhauling./RSD
3 Gandhar - UNIT GT2 GUJARAT NTPC 2 144.3 RSD/RSD 27-04-2022 07:47
4 KAWAS - UNIT 1C GUJARAT NTPC 3 116.1 RSD/RSD 23-04-2022 06:00
Total CS (RSD) 482.5
STATE SECTOR
1 APL MUNDRA GUJARAT APL-ADANI 4 330 Reseve Shut down/RSD 09-05-2022 17:40 13-05-2022
Withdrawn under Reserve Shut
2 SUGEN 1 GUJARAT GUJARAT 3 382.5 07-05-2022 00:52
down/RSD
3 WPCL MAHARASHTRA MAHARASHTRA 1 135 Unit out of service as no PPA/RSD 25-11-2018 04:48
Total SS (RSD) 847.5

Total RSD Outage (CS+SS): 1,330

Hydro Generator Outages


A.Hydro Planned Outages
SL. Station State Agency Unit No Capacity Reason(s) Outage Expected Revival
No (MW) Date Time Date
CENTRAL SECTOR
1 SSP(RBPH) GUJARAT SSP (SSNL) 1 200 Withdrawn as per Schedule 10-05-2022 17:45
2 SSP(RBPH) GUJARAT SSP (SSNL) 3 200 Withdrawn as per Schedule 10-05-2022 17:15
3 SSP(RBPH) GUJARAT SSP (SSNL) 2 200 Withdrawn as per Schedule 10-05-2022 17:30
Total CS (Hydro Planned) 600
STATE SECTOR
ROTOR e/f, then out in capital
1 BANASAGAR TONS MADHYA PRADESH Madhya Pradesh 3 105 17-06-2020 02:08 31-05-2022
overhauling
Total SS (Hydro Planned) 105

Total Hydro Planned Outage (CS+SS): 705

B.Hydro Forced Outages


SL. Station State Agency Unit No Capacity Reason(s) Outage Expected Revival
No (MW) Date Time Date
STATE SECTOR
1 GHATGHAR MAHARASHTRA Maharashtra 1 125 Stator E/F 20-04-2022 00:35 01-07-2022
Total SS (Hydro Forced) 125

Total Hydro Forced Outage (CS+SS): 125