BTL ANALYSIS FEB'22

DATE OF LAST MONTHS


CAPACITY DATE OF OUTAGE FAILURE
SN STATION UNIT OH COMPLN/ AFTER AREA
(MW) FAILURE HOURS MECHANSIM
COD OH/ COD

1 BARAUNI 9 252 22-02-2022 01-11-2021 113.97 3.80 WATER WALL WELD DEFECT

2 BONGAIGAON 1 251 25-02-2022 31-01-2022 50.98 0.86 WATER WALL WELD DEFECT

ATTACHMENT
3 BARH 1 660 05-02-2022 01-12-2021 36.17 2.23 WATER WALL
FAILURE

ATTACHMENT
4 BARH 1 660 12-02-2022 01-12-2021 42.57 2.45 WATER WALL
FAILURE

LTRH HANGER
5 BARH 1 661 15-02-2022 01-12-2021 43.12 2.53 WELD DEFECT
TUBE

ATTACHMENT
6 BARH 1 660 17-02-2022 01-12-2021 275.80 2.62 WATER WALL
FAILURE

7 DARLIPALI 2 800 02-02-2022 01-09-2021 103.98 5.15 WATER WALL OVERHEATING

8 DARLIPALI 2 800 07-02-2022 01-09-2021 290.43 5.32 SUPERHEATER OVERHEATING

ATTACHMENT
9 KhSTPS 4 210 14-02-2022 20-12-2021 27.33 1.89 REHEATER
FAILURE

ATTACHMENT
10 KhSTPS 7 500 01-02-2022 15-10-2021 34.32 3.65 WATER WALL
FAILURE

ATTACHMENT
11 KhSTPS 7 500 26-02-2022 15-10-2021 33.30 4.49 WATER WALL
FAILURE

12 KUDGI 1 800 07-02-2022 24-12-2021 114.62 1.53 SLING TUBE OVERHEATING

SHORT TERM
13 KUDGI 1 800 23-02-2022 24-12-2021 122.98 2.06 SLING TUBE
OVERHEATING

ATTACHMENT
14 MOUDA 1 500 28-02-2022 17-03-2021 12.20 11.62 WATER WALL
FAILURE

15 MOUDA 2 500 23-02-2022 20-12-2021 45.50 2.18 HANGER TUBE WELD DEFECT
ATTACHMENT
16 SIPAT 4 500 16-02-2022 09-03-2021 32.35 11.47 SUPERHEATER
FAILURE

17 SmSTPS 3 500 16-02-2022 01-07-2021 47.57 7.68 SUPERHEATER AIR EROSION

18 SOLAPUR 1 660 12-02-2022 01-02-2022 94.37 0.38 REHEATER WELD DEFECT

19 SSTPS 5 500 18-02-2022 07-10-2019 35.37 28.84 ECONOMISER WELD DEFECT


ATTACHMENT
20 TnTPS 4 110 13-02-2022 27-07-2018 56.02 43.23 SCW
FAILURE
21 VSTPS 3 210 20-02-2022 03-12-2020 56.42 14.82 ECONOMISER ATTRITION FAILURE
DUST EROSION (FLY
22 VSTPS 4 210 26-02-2022 16-12-2019 54.47 26.79 ECONOMISER
ASH)
ATTACHMENT
23 VSTPS 10 500 23-02-2022 09-04-2020 39.97 22.86 WATER WALL
FAILURE