BIDANG : PEKERJAAN UMUM

DAFTAR : HARGA SATUAN BARANG DAN JASA


DI WILAYAH KABUPATEN PULANG PISAU
BULAN : FEBRUARI 2022 - JUNI 2022

HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8
A. UPAH TENAGA KERJA
1 Mandor Orang/Hari 189,750.00 189,750.00 189,750.00 189,750.00 189,750.00 189,750.00
2 Tukang Gali Tanah Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
3 Kepala Tukang Batu Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
4 Tukang Batu Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
5 Laden Tukang Batu Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
6 Kepala Tukang Kayu Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
7 Tukang Kayu Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
8 Laden Tukang Kayu Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
9 Kepala Tukang Besi Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
10 Tukang Besi Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
11 Laden Tukang Besi Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
12 Kepala Tukang Cat Orang/Hari 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
13 Tukang Cat Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
14 Laden Tukang Cat Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
15 Penjaga Malam Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
16 Mekanik Orang/Hari 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00
17 Operator Terlatih Orang/Hari 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00 200,454.00
18 Operator Kurang Terlatih Orang/Hari 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
19 Pembantu Operator Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
20 Sopir Material / Truk Orang/Hari 137,454.00 137,454.00 137,454.00 137,454.00 137,454.00 137,454.00
21 Sopir Personil Orang/Hari 114,545.00 114,545.00 114,545.00 114,545.00 114,545.00 114,545.00
22 Pembantu Sopir / Knek Orang/Hari 96,250.00 96,250.00 96,250.00 96,250.00 96,250.00 96,250.00
23 Buruh Tak Terlatih Orang/Hari 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00
24 Buruh Lapangan Agak Terlatih Orang/Hari 112,500.00 112,500.00 112,500.00 112,500.00 112,500.00 112,500.00
25 Buruh Lapangan Terlatih Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
26 Tukang Listrik Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
27 Tukang Las Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
28 Tukang Pancang Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
29 Tukang Tebas Orang/Hari 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
30 Tukang Anyam Orang/Hari 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8
B. BAHAN BANGUNAN

I BATA, BATU DAN PASIR


1 Pasir Pasang m3 188,472.00 218,500.00 222,812.00 283,187.00 309,615.00 241,500.00
2 Pasir Urug m3 172,500.00 172,500.00 178,250.00 223,676.00 236,454.00 210,833.00
3 Tanah Urug Biasa m3 172,500.00 172,500.00 222,812.00 257,312.00 270,089.00 230,000.00
4 Tanah Urug Biasa Kepasiran (sumber Kalampangan) m3 238,214.00 205,357.00 205,357.00 212,750.00 214,027.00 287,500.00
5 Tanah Urug Pilihan/Laterit m3 253,000.00 273,125.00 273,125.00 251,562.00 264,339.00 287,500.00
6 Sirtu m3 345,000.00 345,000.00 345,000.00 402,500.00 415,277.00 345,000.00
7 Batu Belah / Batu Gunung m3 425,500.00 454,250.00 690,000.00 713,000.00 725,777.00 540,500.00
8 Batu pecah tak tersaring (basecourse) m3 408,250.00 431,250.00 575,000.00 681,375.00 694,152.00 517,500.00
9 Abu Batu/Fine Agregat m3 379,500.00 408,250.00 437,000.00 465,750.00 478,527.00 408,250.00
10 Batu Pecah 1 - 2 cm m3 488,750.00 517,500.00 718,750.00 776,250.00 789,027.00 586,500.00
11 Batu Pecah 2 - 3 cm m3 488,750.00 517,500.00 718,750.00 776,250.00 789,027.00 586,500.00
12 Batu Pecah 3 - 5 cm m3 488,750.00 517,500.00 718,750.00 776,250.00 789,027.00 586,500.00
13 Batu Pecah 5 - 7 cm m3 488,750.00 517,500.00 718,750.00 776,250.00 789,027.00 586,500.00
14 Batu Pecah 10 -15 cm m3 488,750.00 517,500.00 718,750.00 776,250.00 789,027.00 586,500.00
15 Kerikil Sungai m3 - - - 543,055.00 568,611.00 -
16 Batu Bata merah bh 1,150.00 1,150.00 1,725.00 1,955.00 2,001.00 920.00
17 Batu Bata Tanah liat bh - - 2,300.00 - - 805.00
18 Bata Ringan bh 10,350.00 11,500.00 10,350.00 - - 10,925.00
19 Batako bh 2,990.00 3,450.00 3,450.00 3,450.00 3,526.00 4,025.00
20 Beton Kerawang bh 17,250.00 17,250.00 17,250.00 17,250.00 17,250.00 20,700.00
21 Glass Block 20/20 bh 32,200.00 32,200.00 34,500.00 34,500.00 34,500.00 40,250.00
22 Kerawang Keramik 20/20 bh 53,475.00 54,050.00 74,750.00 74,750.00 74,750.00 51,750.00
23 Kerawang Keramik 30/30 bh 80,500.00 80,500.00 86,250.00 97,750.00 97,750.00 74,750.00
24 Kerawang Bata/gerabah bh 18,975.00 23,000.00 23,000.00 23,000.00 23,000.00 20,700.00
25 Paving Stone segi empat bh 2,530.00 3,450.00 3,450.00 - - -
26 Paving Stone segi enam bh 2,875.00 - 3,450.00 - - -
27 Kapur pasang / kapur padam Kg 24,552.00 24,753.00 28,750.00 28,750.00 28,750.00 24,753.00

II BAHAN PEREKAT -
1 Semen PC ( isi 40 Kg / zak) Kg 1,545.00 1,545.00 1,574.00 1,681.00 1,696.00 1,581.00
2 Semen PC ( isi 40 Kg / zak) Holcim Kg 1,236.00 1,365.00 1,365.00 1,401.00 1,401.00 1,265.00
3 Aspal Ac Pen 60/70 Kg 17,772.00 18,922.00 20,072.00 21,222.00 21,222.00 18,922.00
4 Aspal Emulsi Kg 11,859.00
5 Cold Paving Hot Mix Asbuton (CPHMA) Kg 2,665.00
6 Aspal Cold Mix Kg 2,544.00
7 Semen Putih (isi 40 Kg) Kg 3,953.00 3,953.00 4,312.00 4,025.00 4,025.00 4,168.00
8 Semen Warna Kg 25,875.00 23,000.00 23,000.00 23,000.00 23,000.00 20,125.00
9 Perekat Bata Ringan Kg 3,018.00 - - - - 4,312.00

III BAHAN BAJA -


1 Besi Beton Polos Kg 17,779.00 18,523.00 18,720.00 19,887.00 19,982.00 18,081.00
2 Besi Beton Ulir Kg 22,378.18 22,875.00 22,875.00 24,616.00 24,616.00 23,870.00
3 Wire mesh dia 6mm m2 48,738.00 47,942.00 48,738.00 48,230.00 48,792.00 47,642.00
4 Wire mesh dia 5mm m3 37,238.00 37,968.00 38,333.00 38,515.00 40,842.00 37,238.00
5 Baja Ringan canal c 75, 75 Btg 134,933.00 141,450.00 - - - 143,750.00
6 Baja Ringan canal c 75, 65 Btg 126,500.00 129,375.00 - - - 129,605.00
7 Baja Ringan reng tebal 0,43 Btg 66,125.00 69,000.00 - - - 69,000.00
8 Baja Ringan reng tebal 0,53 - - - - - -
9 Kawat Beton / Bendrat Kg 30,475.00 29,407.00 29,571.00 34,500.00 34,500.00 28,750.00
10 Kawat Harmonika Mtr 44,574.00 44,792.00 44,850.00 46,322.00 46,322.00 51,750.00
11 Besi Plat rata2 Kg - - 40,250.00 - - -
12 Kawat Nyamuk Aluminium/Baja M2 28,750.00 28,750.00 - 34,500.00 34,500.00 28,750.00

IV BAHAN KAYU -
1 Balok Kayu Ulin 5/10, 10/10 m3 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 12,396,494.00
2 Balok Kayu Ulin 5/7 m3 14,734,516.00 14,734,516.00 14,734,516.00 14,734,516.00 14,734,516.00 14,529,870.00
3 Balok Kayu Ulin 5/5 m3 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 12,377,334.00 13,105,413.00
4 Papan Kayu Ulin 2/20 m3 18,507,755.00 18,507,755.00 18,507,755.00 18,507,755.00 18,507,755.00 17,153,529.00
5 Balok Kayu Kl.I m3 8,736,942.00 8,736,942.00 8,736,942.00 8,736,942.00 8,736,942.00 8,736,942.00
6 Balok Kayu KI.II m3 5,824,628.00 5,824,628.00 5,824,628.00 5,824,628.00 5,824,628.00 5,824,628.00
HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8
7 Balok Kayu KI.III m3 2,961,250.00 2,961,250.00 2,961,250.00 2,961,250.00 2,961,250.00 3,094,333.00
8 Papan Kayu Kl.I m3 9,756,251.00 9,756,251.00 9,756,251.00 9,756,251.00 9,756,251.00 10,382,399.00
9 Papan Kayu KI.II m3 5,970,243.00 5,970,243.00 5,970,243.00 5,970,243.00 5,970,243.00 6,319,721.00
10 Papan Kayu KI.III m3 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,946,875.00
11 Papan Bagesting m3 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,967,000.00 2,961,250.00
12 Kayu Dolken/Galam Dia. 6-8 cm btg 14,375.00 14,375.00 14,375.00 14,375.00 14,375.00 12,650.00
13 Kayu hutan untuk Galar/Knopel Dia 8-10 cm btg 18,974.00 18,974.00 18,974.00 18,974.00 18,974.00 18,400.00
14 Kayu Utk Galar/Knopel 10-12 cm btg 24,725.00 24,725.00 24,725.00 24,725.00 24,725.00 21,850.00
15 Kusen Kayu Ulin 5/10 Uk. Pasaran (Meubelair) M' 71,875.00 71,875.00 71,875.00
16 Kusen Kayu Ulin 6/12 Uk. Pasaran (Meubelair) M' 120,750.00 120,750.00 120,750.00
17 Kusen Kayu Kls I 5/10 Uk. Pasaran (Meubelair) M' 54,625.00 54,625.00 54,625.00
18 Kusen Kayu Kls I 6/12 Uk. Pasaran (Meubelair) M' 83,375.00 83,375.00 83,375.00

V BAHAN ALUMINIUM & KUNCI-KUNCI


1 Kusen Almunium m' - - - - - -
2 Rangka Jendela Almunium m' - - - - - -
3 Rangka Pintu Almunium m' - - - 327,750.00 327,750.00 -
4 Kusen & Pintu PVC toilet unt 353,625.00 425,500.00 431,250.00 - - 517,500.00
5 Engsel - - - - - -
3" bh 46,000.00 33,005.00 40,250.00 34,132.00 34,132.00 33,005.00
4" bh - 47,150.00 47,150.00 48,760.00 48,760.00 47,150.00
5" bh 57,500.00 57,500.00 57,500.00 59,463.00 59,463.00 57,500.00
7" bh - - - - - -
6 Handle pintu - - - - - -
Merk bh - - 195,500.00 - - 215,625.00
7 Selinder bh 57,500.00 - 51,750.00 - - 46,000.00
8 Slot Tanam bh 77,625.00 - 86,250.00 - - 100,625.00
9 Kait Angin bh 24,150.00 23,575.00 28,750.00 24,380.00 24,380.00 32,775.00
10 Grendel bh 20,125.00 17,250.00 23,000.00 25,875.00 25,875.00 17,250.00

V BAHAN PELAPIS : -
1 Plywood 3 mm lbr 70,150.00 73,216.00 80,500.00 81,650.00 81,650.00 69,000.00
2 Plywood 4 mm lbr 83,375.00 85,100.00 92,000.00 93,150.00 93,150.00 92,000.00
3 Plywood 6 mm lbr 110,016.00 106,950.00 120,750.00 121,900.00 121,900.00 109,250.00
4 Plywood 9 mm lbr 142,600.00 143,750.00 172,500.00 166,498.00 166,498.00 149,500.00
5 Lampit Rumbia lbr - - - - - -
6 Plastik Cor m2 2,714.00 - 2,875.00 2,990.00 2,990.00 2,645.00

VI BAHAN LANTAI & DINDING KERAMIK : -


1 Keramik 10 x 20 m2 73,899.00 74,261.00 74,261.00 76,797.00 76,797.00 74,261.00
2 Keramik 20 x 20 m2 80,500.00 80,894.00 80,894.00 83,656.00 83,656.00 80,500.00
3 Keramik 20 x 25 m2 80,500.00 80,894.00 92,884.00 83,656.00 83,656.00 80,500.00
4 Keramik 30 x 30 m2 80,500.00 84,737.00 86,250.00 96,842.00 96,842.00 -
5 Keramik 40 x 40 m2 92,000.00 92,450.00 97,750.00 95,607.00 95,607.00 89,125.00
6 Keramik 60 x 60 m2 - - - - - -

VII BAHAN PENUTUP ATAP : -


1 Metal Merk Sakura Roof tbl. 0,3 mm (uk 0,77x0,8 m) Lbr 55,966.00 56,024.17 64,400.00 65,550.00 65,550.00 69,000.00
2 Metal Merk Sakura Roof tbl. 0,2 mm (uk 0,77x0,8 m) Lbr 48,300.00 48,357.50 54,625.00 55,775.00 55,775.00 51,750.00
3 Metal Merk Prima Roof tbl. 0,3 mm (uk 0,77x0,8 m) Lbr 48,300.00 48,357.50 48,300.00 49,450.00 49,450.00 -
4 Metal Merk Prima Roof tbl. 0,2 mm (uk 0,77x0,8 m) Lbr 42,550.00 42,607.50 37,950.00 39,100.00 39,100.00 -
5 Metal Merk Mega Roof tbl. 0,3 mm (uk 0,77x0,8 m) Lbr - - - - - -
6 Metal Merk Mega Roof tbl. 0,2 mm (uk 0,77x0,8 m) Lbr - - - - - -
7 Metal Merk Surya Roof tbl. 0,3 mm (uk 0,77x0,8 m) Lbr - - - - - -
8 Metal Merk Surya Roof tbl. 0,2 mm ((uk 0,77x0,8 m) Lbr - - - - - -
9 Metal Merk Multi Roof tbl. 0,3 mm (uk 0,77x0,8 m) Lbr - - - - - -
10 Metal Merk Multi Roof tbl. 0,2 mm (uk 0,77x0,8 m) Lbr - - - - - -
11 Nok Metal Buah 23,575.00 26,450.00 28,750.00 - - 28,750.00
12 Seng Plat M' 14,950.00 13,586.00 28,750.00 21,751.00 21,751.00 19,808.00
13 Genteng Beton Buah 3,519.00 3,536.00 3,536.00 3,657.00 3,657.00 3,536.00
14 Asbes Gelombang Lbr 38,716.00 57,500.00 56,856.00 58,788.00 58,788.00 56,856.00
15 Seng Gelombang Bjls. 30 Lbr 79,764.00 80,155.00 80,155.00 82,892.00 82,892.00 80,155.00
16 Seng Gelombang Bjls. 27 ( 180 x 0.20 ) Lbr 65,550.00 73,025.00 68,367.00 70,702.00 70,702.00 73,600.00
HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8
17 Seng Plat Bjls.30 ( 180 x 0.20 ) Lbr 65,688.00 66,010.00 66,010.00 68,264.00 68,264.00 66,010.00
18 Seng Aluminium Tebal 0,4 Lbr 115,000.00 108,445.00 120,750.00 112,148.00 112,148.00 108,445.00
19 Spandeck /Atap Zincalumn Lbr 57,500.00 58,650.00 60,375.00 61,065.00 61,180.00 58,075.00
20 Kalsiplank Lbr - - - - - -
21 Nusaplank Lbr 74,750.00 - - - - 71,875.00

VIII BAHAN KACA : -


1 Kaca Bening Ukuran 3 mm m2 161,000.00 100,193.00 110,400.00 103,615.00 103,615.00 100,193.00
2 Kaca Bening Ukuran 5 mm m2 184,000.00 126,126.00 155,250.00 130,433.00 130,433.00 172,500.00
3 Kaca Bening Ukuran 8 mm m2 - - - - - -
4 Kaca Ray Ban Uk. 3 mm m2 138,000.00 129,662.00 138,000.00 134,090.00 134,090.00 129,662.00
5 Kaca Ray Ban Uk. 5 mm m2 178,250.00 175,633.00 178,250.00 181,631.00 181,631.00 201,250.00
6 Kaca Ray Ban Uk. 8 mm m2 - - - - - -
7 Kaca Cermin tbl 2 mm m2 153,259.00 154,010.00 213,900.00 159,269.00 159,269.00 154,010.00
8 Kaca Cermin tbl 3 mm m2 246,330.00 247,537.00 247,537.00 255,990.00 255,990.00 247,537.00

IX BAHAN PAKU DAN MUR BAUT : -


1 Paku Kayu Kg 26,335.00 26,680.00 28,750.00 28,750.00 28,750.00 27,111.00
2 Paku Seng Kg 41,400.00 42,550.00 54,625.00 57,500.00 57,500.00 51,750.00
3 Paku Ulin Kg 31,625.00 46,000.00 37,375.00 70,465.00 70,465.00 57,781.00
4 Paku Sirap Kg 25,875.00 28,750.00 34,500.00 40,250.00 40,250.00 37,375.00
5 Paku Plywood / Teakwood Kg 25,875.00 46,000.00 51,750.00 57,500.00 57,500.00 46,000.00
6 Paku Asbes Kg 55,583.00 57,500.00 54,625.00 57,500.00 57,500.00 54,625.00
7 Paku Kait Buah 1,055.00 1,060.00 - 1,097.00 1,097.00 1,060.00
8 Paku Reng Kg 27,025.00 28,750.00 25,875.00 28,750.00 28,750.00 28,750.00
9 Paku Sekrup Bh 1,876.00 1,886.00 2,300.00 1,950.00 1,950.00 -
10 Paku Anti Karat / Beton Kg 20,700.00 - 46,000.00 - - 20,700.00
11 Besi Beugel / baut kuda-kuda Buah 28,152.00 28,290.00 28,290.00 29,256.00 29,256.00 -
12 Paku Dynabolt Buah 4,312.00 - - - - -

X BAHAN FINISHING : -
1 Cat Kayu Mengkilap Ltr/Kg 58,650.00 63,250.00 60,375.00 80,500.00 77,050.00 74,750.00
2 Cat Kayu Dasar Kg 57,500.00 33,649.00 40,250.00 66,971.00 66,971.00 48,875.00
3 Plamir Kayu Ltr/Kg 80,500.00 - 51,750.00 - - 74,750.00
4 Cat Meni Ltr/Kg 44,562.00 40,446.00 40,446.00 41,828.00 41,828.00 51,750.00
5 Dempul Kayu Ltr/Kg 36,800.00 37,950.00 40,250.00 41,400.00 41,400.00 51,750.00
6 Ampelas Lembar 17,825.00 9,200.00 10,350.00 11,146.00 11,146.00 10,350.00
7 Cat Tembok Setara Jotun Interior Kg 132,250.00 - - - - 132,250.00
8 Cat Tembok Setara Jotun Eksterior Kg 161,000.00 - - - - 161,000.00
9 Cat Interior kw 2 Ltr/Kg 46,000.00 47,150.00 48,300.00 51,750.00 52,037.00 51,750.00
10 Cat Tembok Eksterior kw 2 Ltr/Kg 69,000.00 69,000.00 69,000.00 69,000.00 71,875.00 69,000.00
11 Plamir Tembok Ltr/Kg 23,000.00 23,112.00 23,112.00 23,567.00 23,567.00 23,112.00
12 Lem Kayu Kg 17,825.00 20,700.00 18,400.00 23,000.00 23,000.00 21,850.00
13 Dempul Kayu Kg 36,800.00 37,950.00 40,250.00 41,400.00 41,400.00 51,750.00
14 Minyak Cat Liter 32,775.00 32,935.00 34,500.00 34,060.00 34,060.00 63,250.00
15 Residu Liter 21,700.00 21,806.00 28,750.00 22,551.00 22,551.00 21,806.00

XI BAHAN SANITARI -
1 Wastafel w. American Standar Buah 492,660.00 495,075.00 517,500.00 511,980.00 511,980.00 495,075.00
w. TOTO Buah - - - - -
2 Kloset duduk kd. American Standar Buah 1,840,000.00 2,357,500.00 2,357,500.00 2,438,000.00 2,438,000.00 2,357,500.00
kd. TOTO Buah - - - - -
3 Kloset Jongkok kj. American Standar Buah 345,000.00 323,578.00 402,500.00 345,000.00 345,000.00 402,500.00
kj. TOTO Buah - - - - -
4 Urinoir u. American Standar Buah 465,681.00 467,963.00 467,963.00 483,943.00 483,943.00 467,963.00
u. TOTO Buah - - - - -
5 Bak mandi Fibre 50 x 50 segiempat Kecil Buah 492,660.00 495,075.00 495,075.00 511,980.00 511,980.00 495,075.00
6 Bak Mandi Fibre 70 x 70 Sudut Buah 667,000.00 675,423.00 675,423.00 698,487.00 698,487.00 675,423.00
7 Bak Mandi Fibre 70 x 70 Segiempat Besar Buah 699,108.00 702,535.00 702,535.00 726,524.00 726,524.00 702,535.00
8 Shower Buah 86,250.00 - 143,750.00 - - 143,750.00
9 Floordrain Buah - - - - - 23,000.00
HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8
10 Tempat Sabun Buah 63,250.00 - - -
11 Kran Air 1/2" Buah 16,100.00 16,100.00 - - 21,850.00
12 Kran Air 3/4" Buah 18,400.00 17,250.00 - - 23,000.00
13 Kitchenzink Buah - - - - - 230,000.00
14 Kran dinding Ex. Toto Buah 299,000.00 299,000.00 299,000.00 299,000.00 299,000.00 299,000.00
15 Septictank Ulin Buah - - - - - 460,000.00
16 ijuk (kg) Kg 14,076.00 14,076.00 14,076.00 14,076.00 14,076.00 14,216.00

XII BAHAN PARTISI DINDING /PLAFOND -


1 Gypsumboard t.9 mm Lmbr 135,556.00 135,556.00 135,556.00 140,185.00 140,185.00 135,556.00
2 List Profil 5 cm Gypsum m - - - - - -
3 Hollow Aluminium 2 x 4 tebal 3 mm btg 27,600.00 27,600.00 - - - 28,750.00
4 Hollow Aluminium 2 x 4 tebal 4 mm btg - - - - - -
5 Hollow Aluminium 4 x 4 tabal 3 mm btg 37,950.00 37,950.00 - - - 38,525.00
6 Hollow Aluminium 4 x 4 tabal 4 mm btg - - - - - -
7 Kalsiboard Uk. 240 cm x 120 cm x 3,5 mm lbr 63,250.00 77,797.00 77,797.00 80,454.00 80,454.00 80,500.00
8 Kalsiboard Uk. 240 cm x 120 cm x 4,5 mm lbr 100,878.00 101,372.00 101,372.00 104,835.00 104,835.00 109,250.00
9 Kalsiboard Uk. 240 cm x 120 cm x 6,0 mm lbr 126,500.00 146,165.00 146,165.00 151,158.00 151,158.00 146,167.00
10 Kalsiboard Uk. 240 cm x 120 cm x 8,0 mm lbr 192,372.00 193,315.00 193,315.00 199,919.00 199,919.00 193,318.00
11 Kalsiboard Uk. 240 cm x 120 cm x 9,0 mm lbr 215,832.00 216,890.00 216,890.00 230,000.00 230,000.00 216,894.00

XIII BAHAN SALURAN AIR -


1 Pipa PVC AW dia 1/2" Batang 31,816.00 34,500.00 31,050.00 31,050.00 31,050.00 33,350.00
2 Pipa PVC AW dia 3/4" Batang 42,933.00 40,250.00 44,850.00 44,850.00 44,850.00 40,250.00
3 Pipa PVC AW dia 1" Batang 56,350.00 48,012.00 51,750.00 51,750.00 51,750.00 50,600.00
4 Pipa PVC AW dia 2" Batang 108,387.00 106,375.00 109,250.00 109,250.00 109,250.00 103,500.00
5 Pipa PVC AW dia 3" Batang 205,083.00 192,050.00 209,875.00 215,117.00 215,117.00 204,700.00
6 Pipa PVC AW dia 4" Batang 358,071.00 338,905.00 356,500.00 356,500.00 356,500.00 345,000.00
7 Pipa PVC AW dia 6" Batang - - - - - 690,000.00
8 Stop kran dia 1" Buah 23,000.00 23,000.00 37,375.00 - - 25,875.00
9 Stop kran dia 3/4" Buah 18,400.00 17,250.00 28,750.00 - - 28,750.00
10 Stop kran dia 1/2" Buah 14,950.00 14,375.00 19,166.00 - - 21,850.00
11 Lem Pipa Buah 13,800.00 13,800.00 13,800.00 13,800.00 13,800.00 13,800.00
12 Seal Tape Buah 5,750.00 5,750.00 5,750.00 - - 5,750.00
13 Klep diameter 3/4" Buah - -
14 Tangki air 1500 liter Buah - - - - - -
15 Tangki air 1200 liter Buah 1,897,500.00 - 1,725,000.00 - - 1,753,750.00
16 Tangki air 750 liter Buah 1,265,000.00 - 1,121,250.00 - - 1,265,000.00
17 Pelampung otomatis Buah -
18 Roof Drain Metal Buah - - - - - -
19 Talang Air PVC Batang 158,125.00 158,125.00 143,750.00 143,750.00 143,750.00 138,000.00

XIV PERALATAN ELEKTRIKAL -


1 Box panel PVC isi 4 MCB Buah 80,500.00 80,500.00 80,500.00 80,500.00 80,500.00 80,500.00
2 MCB 6 A Buah 34,500.00 34,500.00 48,875.00 48,875.00 48,875.00 57,500.00
3 MCB 4 A Buah 28,750.00 28,750.00 43,125.00 43,125.00 43,125.00 57,500.00
4 Isolasi Buah 17,250.00 11,500.00 17,250.00 17,250.00 17,250.00 11,500.00
5 Saklar tunggal Buah 17,250.00 17,250.00 17,250.00 17,250.00 17,250.00 17,250.00
6 Saklar ganda Buah 23,000.00 23,000.00 23,000.00 23,000.00 23,000.00 23,000.00
7 Stop kontak Buah 17,250.00 17,250.00 17,250.00 17,250.00 17,250.00 17,250.00
8 Lampu SL 5 watt Buah - - 23,000.00 - - -
9 Lampu SL 10 watt Buah - - 34,500.00 - - -
10 Lampu SL 24 watt Buah - - 51,750.00 - - -
11 Lampu LED 3 watt Buah 25,300.00 - 17,250.00 - - 34,500.00
12 Lampu LED 5 watt Buah 29,900.00 - 28,750.00 - - 40,250.00
13 Lampu LED 8 watt Buah - - 40,250.00 - - 46,000.00
14 Lampu LED 12 watt Buah 59,800.00 - 51,750.00 - - 51,750.00
15 Titik Lampu + Instalasi (Konst.Kayu) Buah 230,000.00 230,000.00 230,000.00 230,000.00 230,000.00 230,000.00
16 Titik Lampu + Instalasi (Konst.Beton) Buah 241,500.00 241,500.00 241,500.00 241,500.00 241,500.00 241,500.00
17 Stop Kontak+ Instalasi (Konst.Kayu) Buah 230,000.00 230,000.00 230,000.00 230,000.00 230,000.00 230,000.00
18 Stop Kontak+ Instalasi (Konst.Beton) Buah 241,500.00 241,500.00 241,500.00 241,500.00 241,500.00 241,500.00
HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8

XV PERPIPAAN -
1 Cleam Sadle Ø 4" x 1/2 " Bh 172,500.00 - - - - -
2 Cleam Sadle Ø 3" x 1/2 " Bh 138,000.00 - - - - -
3 Elbow Sock PE Ø 1/2" Bh 28,750.00 - - - - -
4 Pipa PE Ø 1/2" M' 10,350.00 - - - - -
5 Mild Adaptor PE Ø 1/2" Bh 23,000.00 - - - - -
6 Knee GI Ø 1/2 " Bh 9,391.00 - - - - -
7 Doble Niple Ø 1/2 " Bh 13,512.00 - - - - -
8 Reduser GI Ø 3/4 " x 1/2 " Bh 34,500.00 - - - - -
9 Water Meter Ø 1/2" Bh 343,850.00 - - - - -
10 Stop Kran Ø 1/2" Bh 23,000.00 - - - - -
11 Knee DD PVC Ø 1/2" Bh 5,175.00 - - - - -
12 Elbow PVC Ø 1/2" Bh 5,175.00 - - - - -
13 Dop PVC Ø 1/2" Bh 6,900.00 - - - - -
14 Pipa PVC Ø 1/2" M' 17,633.00 - - - - -
15 Atap Kran Ø 1/2" Bh 37,950.00 - - - - -
16 Reduser All Socket PVC / RR 4" x 2" Bh 144,087.00 - - - - -
17 Reduser All Socket PVC / RR 6" x 4" Bh 328,995.00 - - - - -
18 Tee PVC / RR 2" Bh 92,000.00 - - - - -
19 Tee All Socket PVC / RR 6" x 4" Bh 1,061,450.00 - - - - -
20 Reduser GI Ø 4" x 1/2" Bh 364,955.00 - - - - -
21 Gate Valve CI 2" Bh 715,300.00 - - - - -
22 Gate Valve CI 4" Bh 1,437,500.00 - - - - -
23 Gate Valve CI 6" Bh 2,395,450.00 - - - - -
24 Dop PVC Ø 2" Bh 11,500.00 - - - - -
25 Dop PVC Ø 4 " Bh 18,400.00 - - - - -
26 Elbow PVC Ø 3 " 90° Bh 17,250.00 - - - - -
27 Box Meter Plat Bh 86,250.00 - - - - -
28 Pipa HDPE Ø 63 mm/2" SDR-17 (PN 10) M' 73,938.00 - - - - -
29 Pipa HDPE Ø 90 mm/3" SDR-17 (PN 10) M' 123,051.00 - - - - -
30 Pipa HDPE Ø 110 mm/4" SDR-17 (PN 10) M' 175,723.00 - - - - -
31 Pipa HDPE Ø 160 mm/6" SDR-17 (PN 10) M' 339,859.00 - - - - -
32 Pipa HDPE Ø 200 mm/8" SDR-17 (PN 10) M' - - - - - -
33 Pipa HDPE Ø 250 mm/10" SDR-17 (PN 10) M' - - - - - -
34 Pipa HDPE Ø 315 mm/12" SDR-17 (PN 10) M' - - - - - -
35 Pipa HDPE Ø 355 mm/14" SDR-17 (PN 10) M' - - - - - -
36 Pipa Leiding 1/2 (Gi) Btg 38,668.00 - - - - -
37 Pipa Leiding 3/4 (Gi) Btg 48,443.00 - - - - -
38 Pipa Leiding 1 (Gi) Btg 57,500.00 - - - - -
39 Pipa Leiding 1 1/2 (Gi) Btg 94,875.00 - - - - -

XVI LAPIS TANAH


1 Geomembrand Tebal 1 mm M2 74,750.00 - - - - -
HARGA SATUAN PER KECAMATAN DALAM R

NO NAMA UPAH + BAHAN SATUAN TANGKAHEN


KAHAYAN BANAMA
KAHAYAN HILIR JABIREN SEBERANG, MALIKU
TENGAH TINGANG
PANDAWEI

1 2 3 4 5 6 7 8

XX MATERIAL CAT JEMBATAN RANGKA BAJA


1 Primer Metalkote EDP-551 Zinc Phosphate Kg 77,711.00
2 Primer Metalkote EDP-551 Zinc Chromate Kg 79,723.00
3 Metalkote Polyurethane TOP COAT PUT-603 Kg 166,750.00
4 Thinner Epoxy (30%) Lt 50,715.00
5 Top Coat Metalkoat Prothane TOP PUT-50800 Lt 167,066.00
6 Thinner PU-047 (30%) Lt 48,876.00
7 Zebra Synthetic Lt 128,713.00
8 Thinner B Lt 24,687.00

CATATAN :
* Harga satuan upah dan bahan ini akan di tinjau setiap 6 (enam) bulan
* Harga satuan upah merupakan batas tertinggi dan bahan merupakan rata-rata pada tiap region ini untuk wilayah Kabupaten Pulang Pisau
* Harga satuan upah dan bahan pada tiap region ini sudah termasuk overhead keuntungan, belum termasuk PPn
* Harga satuan BBM pada tiap region berfluktuatif
* Harga satuan upah dan bahan yang belum ada dalam daftar ini, disesuaikan harga pasar yang berlaku pada saat itu.

Mengetahui,
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kepala Bidang Sumber Daya Air Kepala Bidang Bina Marga Kepala Bidang Cipta Karya
Kabupaten Pulang Pisau

Dr. USIS I. SANGKAI S.Hut M.SI ELENA FRANSISCA, ST., MT. DENNY EKO SETYADI, ST., MT. TITIEN MARIA, ST
NIP. 19750118 199903 1 006 NIP. 19760217 200501 2 008 NIP. 19780119 200604 1 009 NIP. 19701031 200501 2 005
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13

189,750.00 189,750.00 189,750.00 189,750.00 189,750.00


132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
165,000.00 165,000.00 165,000.00 165,000.00 165,000.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
200,454.00 200,454.00 200,454.00 200,454.00 200,454.00
200,454.00 200,454.00 200,454.00 200,454.00 200,454.00
132,000.00 132,000.00 132,000.00 132,000.00 132,000.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
137,454.00 137,454.00 137,454.00 137,454.00 137,454.00
114,545.00 114,545.00 114,545.00 114,545.00 114,545.00
96,250.00 96,250.00 96,250.00 96,250.00 96,250.00
110,000.00 110,000.00 110,000.00 110,000.00 110,000.00
112,500.00 112,500.00 112,500.00 112,500.00 112,500.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
137,500.00 137,500.00 137,500.00 137,500.00 137,500.00
125,000.00 125,000.00 125,000.00 125,000.00 125,000.00
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13

235,750.00 235,750.00 310,883.00 414,766.00 419,750.00


207,000.00 207,000.00 245,552.00 327,604.00 374,571.00
259,350.00 259,350.00 276,600.00 345,000.00 345,000.00
293,250.00 293,250.00 431,250.00 345,000.00 502,714.00
324,874.00 324,874.00 460,000.00 575,000.00 839,500.00
402,500.00 402,500.00 540,500.00 632,500.00 897,000.00
609,500.00 609,500.00 655,500.00 805,000.00 977,500.00
575,000.00 575,000.00 621,000.00 770,500.00 954,500.00
437,000.00 437,000.00 465,750.00 494,500.00 -
655,500.00 655,500.00 701,500.00 747,500.00 1,012,000.00
655,500.00 655,500.00 701,500.00 747,500.00 1,012,000.00
655,500.00 655,500.00 701,500.00 747,500.00 1,012,000.00
655,500.00 655,500.00 701,500.00 747,500.00 1,012,000.00
655,500.00 655,500.00 701,500.00 747,500.00 1,012,000.00
- - - - -
977.00 977.00 1,035.00 1,322.00 1,725.00
805.00 805.00 920.00 - -
11,500.00 11,500.00 11,500.00 - 11,500.00
4,025.00 4,025.00 4,255.00 4,600.00 4,600.00
23,000.00 23,000.00 23,000.00 15,826.00 23,000.00
46,000.00 46,000.00 40,250.00 40,250.00 40,250.00
55,506.00 55,506.00 61,349.00 62,100.00 62,100.00
74,750.00 74,750.00 80,500.00 80,500.00 80,500.00
23,000.00 23,000.00 23,000.00 28,750.00 28,750.00
- - - - -
3,450.00 3,450.00 - - -
26,082.00 26,082.00 26,565.00 26,565.00 28,980.00

1,696.00 1,696.00 1,696.00 1,868.00 1,926.00


1,380.00 1,380.00 1,466.00 1,696.00 1,696.00
20,072.00 20,072.00 21,222.00 22,712.00 22,712.00

4,347.00 4,347.00 4,427.00 4,427.00 4,830.00


19,550.00 19,550.00 23,000.00 20,240.00 23,000.00
- - - - -

18,311.00 18,311.00 18,615.00 18,886.00 19,954.00


23,870.00 23,870.00 24,616.00 24,616.00 25,361.00
47,487.00 47,487.00 47,642.00 48,230.00 48,973.00
37,968.00 37,968.00 37,238.00 38,150.00 41,666.00
- - - - -
- - - - -
- - - - -
- - - - -
28,750.00 28,750.00 28,750.00 28,750.00 28,750.00
47,196.00 47,196.00 48,070.00 51,750.00 52,440.00
- - - - -
- - 28,750.00 - 28,750.00

12,741,373.00 12,741,373.00 12,741,373.00 12,913,873.00 12,971,373.00


14,644,870.00 - 13,543,043.00 13,543,043.00 13,658,043.00
13,220,413.00 12,013,295.00 12,013,295.00 12,185,795.00 12,243,295.00
17,719,938.00 18,171,346.00 18,171,346.00 18,747,579.00 18,401,346.00
8,851,942.00 8,008,863.00 8,008,863.00 8,909,442.00 8,123,863.00
5,939,628.00 6,552,706.00 6,552,706.00 6,725,206.00 6,667,706.00
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13
3,027,314.00 4,368,471.00 4,368,471.00 3,084,814.00 4,483,471.00
9,580,020.00 8,802,682.00 8,802,682.00 9,637,520.00 8,805,182.00
5,939,628.00 6,552,706.00 6,552,706.00 5,997,128.00 6,667,706.00
3,027,314.00 4,368,471.00 4,368,471.00 3,220,000.00 4,483,471.00
2,961,250.00 3,162,500.00 3,162,500.00 3,220,000.00 3,450,000.00
12,650.00 12,650.00 12,650.00 13,800.00 13,800.00
18,400.00 18,400.00 18,112.00 18,975.00 23,000.00
21,850.00 21,850.00 23,000.00 23,000.00 28,750.00

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
34,776.00 34,776.00 43,700.00 35,420.00 43,700.00
49,680.00 49,680.00 51,750.00 50,600.00 55,200.00
60,585.00 60,585.00 63,250.00 61,707.00 67,317.00
- - - - -
- - - - -
- - - 172,500.00 -
- - - - -
- - - - -
33,062.00 33,062.00 33,637.00 34,545.00 32,775.00
17,250.00 17,250.00 20,700.00 17,250.00 20,700.00

70,150.00 70,150.00 71,875.00 71,875.00 74,750.00


93,150.00 93,150.00 97,750.00 86,250.00 -
138,000.00 138,000.00 115,000.00 - 120,750.00
172,500.00 172,500.00 - - -
- - - - -
2,300.00 2,300.00 - - -

86,250.00 86,250.00 87,400.00 88,550.00 89,700.00


86,250.00 86,250.00 87,400.00 88,550.00 89,700.00
87,930.00 87,930.00 97,750.00 86,813.00 97,750.00
86,250.00 86,250.00 87,569.00 90,790.00 97,290.00
98,900.00 98,900.00 99,820.00 98,094.00 107,012.00
- - - - -

70,150.00 70,150.00 70,150.00 94,875.00 103,500.00


52,900.00 52,900.00 54,395.00 77,050.00 59,340.00
- - 76,228.00 76,228.00 83,158.00
- - 51,865.00 51,865.00 56,580.00
- - 67,590.00 67,590.00 73,735.00
- - 49,335.00 49,335.00 53,820.00
- - 94,875.00 94,875.00 103,500.00
- - 61,985.00 61,985.00 67,620.00
- - 189,750.00 189,750.00 207,000.00
- - 98,670.00 98,670.00 107,640.00
23,000.00 23,000.00 25,300.00 28,750.00 25,300.00
20,555.00 20,555.00 21,751.00 19,808.00 19,808.00
3,726.00 3,726.00 3,795.00 3,795.00 4,140.00
59,616.00 59,616.00 60,720.00 60,720.00 66,240.00
84,456.00 84,456.00 86,020.00 86,020.00 93,840.00
72,036.00 72,036.00 73,370.00 73,370.00 80,040.00
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13
69,552.00 69,552.00 70,840.00 70,840.00 77,280.00
114,264.00 114,264.00 116,380.00 116,380.00 126,960.00
60,490.00 60,490.00 61,065.00 62,100.00 66,240.00
- - - 74,750.00 -
- - - - -

105,570.00 105,570.00 107,525.00 107,525.00 117,300.00


189,750.00 189,750.00 172,500.00 172,500.00 172,500.00
- - - - -
136,620.00 136,620.00 139,150.00 139,150.00 151,800.00
201,250.00 201,250.00 201,250.00 201,250.00 205,620.00
- - - - -
162,275.00 162,275.00 165,280.00 165,280.00 180,305.00
260,820.00 260,820.00 265,650.00 265,650.00 289,800.00

28,566.00 28,566.00 29,095.00 29,095.00 31,740.00


48,705.00 48,705.00 49,607.00 49,607.00 54,117.00
60,882.00 60,882.00 62,009.00 62,009.00 67,647.00
46,000.00 46,000.00 38,525.00 39,090.00 37,950.00
44,712.00 44,712.00 45,540.00 45,540.00 49,680.00
54,794.00 54,794.00 55,808.00 55,808.00 60,882.00
1,117.00 1,117.00 - 1,138.00 -
24,725.00 24,725.00 25,300.00 25,454.00 24,234.00
- - - - -
- - - - -
29,808.00 29,808.00 30,360.00 30,360.00 33,120.00
- - - - -

80,500.00 80,500.00 69,000.00 74,750.00 71,705.00


74,750.00 74,750.00 48,706.00 48,706.00 48,706.00
- - - - -
46,000.00 46,000.00 46,000.00 46,000.00 47,352.00
51,750.00 51,750.00 51,750.00 51,750.00 51,750.00
10,350.00 10,350.00 11,500.00 11,676.00 11,676.00
- - 133,975.00 - 133,400.00
- - 167,325.00 - 166,750.00
51,865.00 51,865.00 51,980.00 51,980.00 52,095.00
69,000.00 69,000.00 69,000.00 69,000.00 69,000.00
24,352.00 24,352.00 30,666.00 24,803.00 30,666.00
23,000.00 23,000.00 - 23,000.00 -
51,750.00 51,750.00 51,750.00 51,750.00 51,750.00
63,250.00 63,250.00 63,250.00 63,250.00 63,250.00
21,806.00 21,806.00 21,806.00 21,806.00 21,806.00

521,640.00 521,640.00 531,300.00 531,300.00 579,600.00


- - - - -
2,484,000.00 2,484,000.00 2,530,000.00 2,530,000.00 2,760,000.00
- - - - -
345,000.00 345,000.00 347,254.00 347,254.00 378,823.00
- - - - -
493,074.00 493,074.00 502,205.00 502,205.00 547,860.00
- - - - -
521,640.00 521,640.00 531,300.00 531,300.00 579,600.00
711,666.00 711,666.00 724,845.00 724,845.00 790,740.00
740,232.00 740,232.00 753,940.00 753,940.00 822,480.00
- - 155,250.00 - 155,250.00
- - - - -
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13
- - 74,750.00 - 74,750.00
- - 17,250.00
- - 23,000.00
- - - 287,500.00 -
299,000.00 299,000.00 299,000.00 299,000.00 299,000.00
- - 552,000.00 - 609,500.00
14,358.00 14,358.00 14,502.00 14,647.00 14,794.00

142,830.00 142,830.00 145,475.00 145,475.00 158,700.00


- - - - -
- - 29,900.00 - 28,750.00
- - - - -
- - 39,100.00 - 37,950.00
- - - - -
78,556.00 78,556.00 83,490.00 83,490.00 91,080.00
132,250.00 132,250.00 132,250.00 132,250.00 132,250.00
147,593.00 147,593.00 156,862.00 156,860.00 171,120.00
195,204.00 195,204.00 207,463.00 207,460.00 226,320.00
219,010.00 219,010.00 232,764.00 232,760.00 253,920.00

32,200.00 32,200.00 32,200.00 32,200.00 32,200.00


40,250.00 40,250.00 43,700.00 41,400.00 48,300.00
55,200.00 55,200.00 54,050.00 55,200.00 57,500.00
109,250.00 109,250.00 111,550.00 112,700.00 115,000.00
207,000.00 207,000.00 209,300.00 210,450.00 212,750.00
347,300.00 347,300.00 349,600.00 353,050.00 356,500.00
- - - - -
- - 51,750.00 - 51,750.00
- - 34,500.00 28,750.00 34,500.00
- - 21,850.00 23,000.00 28,750.00
13,800.00 13,800.00 13,800.00 13,800.00 13,800.00
- - 5,750.00 11,500.00 13,800.00

- - - - -
- - 1,897,500.00 1,840,000.00 1,897,500.00
- - 1,150,000.00 - 1,150,000.00

- - - - -
138,000.00 138,000.00 155,250.00 155,250.00 155,250.00

80,500.00 80,500.00 80,500.00 80,500.00 80,500.00


57,500.00 57,500.00 - - -
57,500.00 57,500.00 - - -
11,500.00 11,500.00 11,500.00 11,500.00 11,500.00
17,250.00 17,250.00 17,250.00 17,250.00 17,250.00
23,000.00 23,000.00 23,000.00 23,000.00 23,000.00
17,250.00 17,250.00 17,250.00 17,250.00 17,250.00
- - 34,500.00 40,250.00 34,500.00
- - 46,000.00 - 46,000.00
- - 63,250.00 57,500.00 63,250.00
- - - - -
- - 40,250.00 - 40,250.00
- - 51,750.00 - 51,750.00
- - - - -
230,000.00 230,000.00 230,000.00 230,000.00 230,000.00
241,500.00 241,500.00 241,500.00 241,500.00 241,500.00
230,000.00 230,000.00 230,000.00 230,000.00 230,000.00
241,500.00 241,500.00 241,500.00 241,500.00 241,500.00
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
HARGA SATUAN PER KECAMATAN DALAM RUPIAH

TAHAI,BELANTI,K
ANAMIT
BARAT,SIDODADI,
BAKAU CMT
TALIO SEBANGAU
PANDIH BATU KAHAYAN KUALA HAMBAWANG
HULU,MULYA KUALA
KIAPAK
SARI,KANTAN
ATAS,KANTAN
DALAM

9 10 11 12 13

Kepala Bidang Cipta Karya Kepala Bidang Tata Ruang

TITIEN MARIA, ST FERDINAND YACOBVELLA, ST.


NIP. 19701031 200501 2 005 NIP. 19800218 200903 1 001