1.Introduction

Soudah is a mountainous area in the of Saudi Arabia. At 3,015


Meter above sea level.
SDC aims to drive the development of Soudah and parts of
Rijal Alma’a Governate to create a luxury mountain destination
through investment in the infrastructure, advancing the
entertainment, residential and commercial sectors, while
increasing access to its unique culture, national treasures and
heritage sites.
2.Objective of the project

The objective of the Project is to get accurate Digital land-base and


aerial-base data for generation of the Digital Twin (Reality Mesh
Model) of the area under SDC so that the Master planning of the
existing and future development and infrastructure projects can be
done effectively.

Project Area: Core Project Areas approximately 627 KM2.


3.Project main component

1 2 3 4
Establishment of GCP Network Aerial Data Collection Digital Ortho -Photography Production Soudah Data Center (SDC)
Provision of Ground controls Points (GCP) as Aerial Imagery and Airborne LiDAR data of Post Processing for generation of DSM, DTM, build Soudah Data Center portal to store
per requirements of project. establish a grid the identified area. Aerial imagery shall be DEM & Digital Ortho-Imagery deliverable and manage all project data in way it could
of high precision Ground Control Points used for defining the geometry and including 3d point cloud and reality mesh be easily manipulated and consumed from
(GCP) or Ground Control Network (GCN) photorealistic facades of cityscape model in addition to feature extraction for all sectors and authorities that will be a
parcel, building footprint and utilities part from Soudah development process
4. Project Phases

First phase
Second phase

Soudah Data
Center (SDC)
Digital Ortho -
Photography Production Project can be divided to tow main section or
Aerial Data phases:
Collection
First phase: Data accusation and modelling
Establishment of GCP Second phase: data center (SDC) where project
Network
data will be managed and consumed
5. Project Phases I

First phase: Data accusation and modelling

The project first phase is an important part where terrain data will be
captured using different technologies to collect all of area information
and characteristics from various dimensions and scales and enable
current and future investment activities the complete view through
Digital land-base and aerial-base data
6. Project Phases I deliverables

Brief about phase 1 deliverables will be as follow:

• Ground control point connected with the nearest available


benchmark and GCP of General Commission for Survey GCS.

• Digital Elevation Model (DEM) better than 12 cm.

• Digital Ortho-imagery of 7cm.

• Aerial Imagery and Airborne LiDAR data of the identified area Oblique
& Nadir imagery along with Airborne LiDAR data.
• Mobile Mapping System (MMS) data.

• accurate 3D Digital Twin (Reality Mesh Model).

• Different Elevation data including DTM and DSM

• Feature Extraction: Cadastral, Parcels, roads, building footprint, and


utilities
7. Project Phases II

Second phase: Soudah Data Center (SDC)

Since project output has many different spatial data and other government
sectors has a valuable data should be taken into consideration to be side by
side with current project outcome spatial data. SDC one of important project
output that can used to store and manage this data in way it could be easily
manipulated and consumed from all sectors and authorities that will be a
part from Soudah development process.
8. Project Phases II deliverables

• SDC spatial data infrastructure (SDI)


design and build Spatial data Infrastructure
# Themes # Themes # Themes
(SDI) to fit all project outcome data and to 1 Addresses 17 Buildings 33 Investment

be according to national and international 2 AdministrativeArea 18 CadastralParcels 34 LandCover

standards. 3 AgriculturalAndAquacultureFacilities 19 Complaints 35 LandMark

4 AtmosphericConditions 20 Digging 36 LandUse

5 ContractorsGate 21 Elevation 37 LandUse

6 SurveyData 22 EnergyResources 38 MeteorologicalGeographicalFeatures

7 BussinessService 23 EnvironmentalMonitoringFacilities 39 MineralResources

8 SemaInvestors 24 GeographicalGridSystems 40 MunicipalAssets

9 ServiceAdminBoundary 25 Geology 41 NaturalRiskZones

10 BioGeographicalRegions 26 History 42 OceanographicGeographicalFeatures

11 TransportNetworks 27 43 Orthoimagery

12 UtilityAndGovernmentalServices 28 HumanHealthAndSafety 44 PopulationDistributionAndDemography

13 VisualDistortion 29 RedZones 45 SpeciesDistribution

14 Project 30 RuralSupervisionArea 46 StatisticalUnits

15 Properties 31 Soil 47 Survey


16 ProtectedSites 32 Hydrography
8. Project Phases II deliverables

• Data integration and automation system

Design and implement system maintain the synchronization


between SDC and other providers or beneficiaries to get always the
final and updated data and information from their systems
whatever its formats. and putting in consideration in design the
solutions that ensure data synchronization SDC databases which it
should be UpToDate

And important in this solution Data before injected to SDC


databases has to be reviewed and adhere QA/QC procedures.
8. Project Phases II deliverables

• SDC Portal and Applications

Design and develop A Portal manage the project datasets according


to Soudah supervision to give the Bidder all their feedback which it
should be implemented. the main Portal or landing page for
product and service available for internal or external users
9. Deep dive into SDC portal and Applications

the main Portal or landing page for product and service available for internal or external users and will have following component:

Data Analysis: and Observatory Indicator search engine: selected Bidder API Management: With the large dataset
which it will showing for internal and external should enable in Data portal search that will be available within SDC and the
and analytics engine for all types of need to share it either internally or
users the indicators and KPI’s which it will
data, including textual, numerical, externally, an API gateway and API
reflect the required analysis for internal and management layer will be a must to deploy.
geospatial, structured, and should be
external users. Selected Bidder will create An API gateway
speed and scalability
provides a single, unified API entry point
across one or more internal APIs. limiting
and security as well.
9. Deep dive into SDC portal and Applications

The main Portal or landing page for product and service available for internal or external users and will have following
component:

Data Catalogue: since the project outcome has various data covering
study Area Data portal section should manage and visualize all of this
various data. and from this section according to user permissions could
select required data depending on their needs. Data should be organized
and searchable, based on the Topics, Category, or data Provider, each
data will have its metadata required from the data provider to publish
their data. Data Catalogue should have self-service regarding drawing
layout, printing maps and download the data in different formats lice
kmz, shapefile, dwg ..tc.
9. Deep dive into SDC portal and Applications

The main Portal or landing page for product and service available for internal or external users and will have following
component:

Street View MAP: in portal section


should be developed to explore street
view depending on panoramic images to
give the reality view in area roads to
enable user take his tour inside area and
explore all street objects through street
view
9. Deep dive into SDC portal and Applications

The main Portal or landing page for product and service available for internal or external users and will have following
component:

Feature Extraction: the selected Bidder should develop web App in SDC portal where
end user can see the city in both 2d mode and street view mode and add the capabilities
for user to make feature extraction for MMS data according to project needs .(e.g
Required object to be extracted (buildings, services, utilities, street furniture, land use) in
addition to enable users to view point cloud data overplayed on panoramic images and
make measurement like distance, object Hight and coordinate ..etc and store feature
data extraction in SDC central database in real time
9. Deep dive into SDC portal and Applications

Feature Extraction output sample base map:


9. Deep dive into SDC portal and Applications

The main Portal or landing page for product and service available for internal or external users and will have following
component:

Dashboards: for each task in project


selected Bidder should build dashboards
reflects progress and productivity in
tasks implementation. and make
required analysis to give KPI’s for Soudah
region depending on project data
outcome.

3D MAP: depending on Mobile Mapping


System data and lidar selected Bidder
should develop part in SDC portal showing
rendered 3 Model and building showing its
actual shape and heights. In addition to
topographic view in 3d model.
10. Project Benefits