Tepung terigu $ 15,000 /kg

Biaya penyimpanan per kg per tahun 25% x harga pembelian


biaya pemesanan $ 500,000 per pesanan
permintaan 1600 kg per minggu
a.
1 EOQ:

D= Annual Demand 83,428.57 kg


S= Setup Cost/Ordering Cost $ 500,000
H= Holding/Carrying Cost $ 3,750

1 tahun = 52 minggu
Q* 4,716.74 unit

2 restoran harus memesan sebanyak:


17.688 kali

3 total annual cost: $ 17,687,768.17

annual setup cost: $ 8,843,884.09


annual holding cost: $ 8,843,884.09

4 lead time = 4, reorder point? 914.29

average daily demand (d) 228.57


L 4

b. the backup stock needed to meet unexpected supply problems and/or sudden changes in demand.
s in demand.
Bulan 1 2 3 4 5
Unit 0 175 200 220 150

persediaan awal di gudang 100 unit


holding cost Rp 500 per unit per bulan
set up cost Rp 100,000
Lead time 1 bulan 30 hari

1 Lot-for-lot

Bulan 1 2 3 4
Gross Requirements 0 175 200 220
Scheduled Receipts
Projected on Hand 100 100 100 0 0
Net Requirements 75 200 220
Planned Order Receipts 75 200 220
Planned Order Releases 75 200 220 150

2 EOQ
Q= 234
H = Rp 6,000
S = Rp 100,000
D= 1643

Bulan 1 2 3 4
Gross Requirements 0 175 200 220
Scheduled Receipts
Projected on Hand 100 100 100 159 193
Net Requirements 75 41 27
Planned Order Receipts 234 234 234
Planned Order Releases 234 234 234

3 POQ = Q* / (avg monthly usage)

POQ = 2

Bulan 1 2 3 4
Gross Requirements 0 175 200 220
Scheduled Receipts
Projected on Hand 100 100 100 200 0
Net Requirements 75 0 220
Planned Order Receipts 275 0 370
Planned Order Releases 275 370

4 BIAYA PENYIMPANAN (HOLDING) BIAYA SETUP


Teknik
kg biaya total kali pesanan biaya
Lot for Lot 100 Rp 500 50,000 6 150,000
EOQ 1089 Rp 500 544,365 5 150,000
POQ 650 Rp 500 325,000 3 150,000
6 7 8
0 150 200

5 6 7 8 9
150 0 150 200

0 0 0 0 0 100 inventaris
150 0 150 200
150 150 200
150 200 6

5 6 7 8 9
150 0 150 200

207 57 57 141 175 1089 inventaris


57 93 59
234 234
234 234 5

5 6 7 8 9
150 0 150 200

150 0 0 200 0 650 inventaris


0 0 150 0
0 350
350 3

BIAYA SETUP TOTAL


total BIAYA
900,000 950,000
750,000 1,294,365
450,000 775,000
45
40
35

Frekuensi Kerusakan
30
25
Cumulative 20
Kerusakan Frekuensi Probability
percentage 15
Cacat A 40 40% 40% 10
Cacat B 30 70% 30% 5
Cacat C 20 90% 20% 0
Cacat A
Cacat D 10 100% 10%
TOTAL 100 100%
Pareto Chart
45 120%
40
100%
35

Probabilitas Kumulatif
Frekuensi Kerusakan

30 80%
25
60%
20
15 40%
10
20%
5
0 0%
Cacat A Cacat B Cacat C Cacat D
Jenis Kerusakan
Job

A
B
C
D
E

Time-phased chart:

0 2 5
Pengamplasan (hours) E D
Pengecatan (hours) Idle
0 2 5
Pengamplasan Pengecatan
(hours) (hours)

10 5
5 7
4 3
3 8
2 6
24 29
Urutan optimal :
E D B A C

10
B
E D
8 10
20 24
A C
D B
16 20 23 24
31
Idle
A C
28 31
Setup (S)
Penyimpanan tahunan (H)
Produksi harian
Penggunaan tahunan (D)
Waktu tunggu (L)
Persediaan pengaman (SS)

b Jumlah kanban yang dibutuhkan:

Demand during lead time :


Safety stock :
Size of container :

Jumlah kanban :
$ 20
nan tahunan (H) $ 400 per unit
360 unit
an tahunan (D) 20,000
4 hari
n pengaman (SS) 0.25 dari tingkat produksi harian

Kanban size formula : 640

A 80
B 4
C 2
D 1

nban yang dibutuhkan: 2.39

uring lead time : 1440


90
640

2.39