PROJECT WORK BREAKDOWN STRUCTURE MATRIX OF RESPONSIBILITIES

Item Preliminary (Stage 4) Detailed Construction Design (Stage 6)

Principle Details

Permits/Licenci
Submission for
BOQ (unpriced)
Specifications
Performance

(Outline)\

Construction
Building
Calculations

Plans
Elevations

Elevations
ng

Sections

Details
Work Package 5 ‐ Airside Systems

5.1 AGL and AGL Control System (incl. Existing Systems Integration)

5.2 Street and Fence Lighting

5.3 Airfield Signage

5.4 Apron Systems (AFL, VDGS, Ground Power)

Work Package 6 ‐ Utilities (Airside and Landside)

6.1 Potable Water Design

6.2 Wastewater Design

6.3 Firefighting Water Design

6.4 Power Distribution inc. Substations (assuming max. no. 2)

6.5 ICT/Communication and Security infrastructure

Work Package 7 ‐ Landside Civil Works (Car parking areas, 4‐lane access road and associated civil works)

7.1 Geometrical Design (including road layouts and markings)

7.2 Pavement Design

7.3 Lighting Design

7.4 Storm Water Design

7.5 Landside Systems Design (Security and Surveillance)

7.6 Fencing and Gates

Work Package 8 ‐ Utility/Support Buildings and Structures

8.1 Functional Planning (incl. sizing)

8.2 Architectural Design

8.3 Structural Design (incl. foundation, roof, framing and steel)

8.4 Mechanical, Electrical and Plumbing

8.5 IT Systems (incl. access control)

8.6 Fire Safety Strategy


Detailed
Calculations

Full
Specifications

BOQ (unpriced)
Detailed Construction Design (Stage 6)

Submission for
Building
Permits/Licenci
ng
Shop Drawings