You are on page 1of 1

TEA GARDEN

GATE

TRAIN LINE
449.213

TRANSFORMER
GATE

D.G.

CANTEEN

GAS PIPE LINE


TOWER
GUARD

GATE
TOWER
ROOM CONTROL ROOM

STORE
WEIGHT
BRIDGE
11.70
TANK FORM AREA

SARAL WARE HOUSE

UNDER GROUND HDPE GAS PIPE LINE 2" DIA.


STORAGE CAPACITY = 420 KL
RAIN WATER HARVESTING PROJECT UNIT - 4

GATE
GATE

WORKER

RAIN WATER HARVESTING SUM


CHANGING ROOM

COLLECTION POINT. - 2
CAPACITY : 60m 3
GUARD
GUARD ROOM
ROOM TOILET

FILE ROOM FLAVOUR PLATFORM


PLOT BOUNDARY CONVEYOR ROOM PLOT BOUNDARY CONVEYOR ROOM ROOM PLOT BOUNDARY
GAS PIPE LINE 2" DIA. GAS PIPE LINE 2" DIA. GAS PIPE LINE
GAS PIPE LINE 12" DIA.
GAS PIPE LINE 2" DIA. GAS PIPE LINE 2" DIA. GAS PIPE LINE 1
2" DIA.
SCRAP GO-DOWN
SHED
CYCLE STAND

GAS PIPE LINE 2" DIA.


RAIN WATER HARVESTING SUMP
COLLECTION POINT NO. - 2 LOADING BAY

6.40
CAPACITY - 25m 3 UNDER GROUND
HDPE GAS PIPE

GAS PIPE LINE


LINE 2" DIA.

LOADING BAY
4 M. WIDE ROAD TO SARAL

9.67
CONVEYOR ROOM RO WATER 3.00
GAS PIPE LINE 12" DIA.

6.45
GAS PIPE LINE
COLLECTION TANKS 12.50 12.50

GAS PIPE LINE 2" DIA.


GAS PIPE LINE 2" DIA.

GAS PIPE LINE

36.00

P.V.C. PAPER

RAIN WATER HARVESTING SUMP


RAIN WATER HARVESTING SUM

B B COLLECTION POINT. - 4

COLLECTION POINT NO. - 1


6.00
CAPACITY : 150m 3

E.T.P. AREA

9.00
GAS PIPE LINE

EFFLUENT TREATMENT CLARIFOCATOR


SCRAP SCRAP

CAPACITY - 100m 3
9.98
14.33 SUMP 24.00

PLANT PHASE-2 SUMP

5.48
RO PLANT CONTROL

EQUILIZITION TANK
UP-FLOUR
ROOM
FILTER 2 E E

GAS PIPE LINE 12" DIA.


12.00
10.92
12.00

SETTLING 1
11.50
12.00

7.00

ROOM
D D
2

GAS PIPE LINE 2" DIA.

12.50

UNDER GROUND HDPE GAS PIPE LINE 2" DIA.


LOADING /UNLOADING UP-FLOUR

13.18

RAIN WATER HARVESTING SUM


FILTER 1

COLLECTION POINT. - 3
LOADING TRUCK STAND AREA

CAPACITY : 90m 3
SHED
GAS PIPE LINE 2" DIA.

AERATION TANK
6.00

6.00

CONVEYOR
4.00
SETTLING 2 FINAL SUMP
CANTEEN BUILDING STORE ROOM GATE GAS PIPE LINE 2" DIA.
AERATION 2
15.72

GAS PIPE LINE 12" DIA.

PRESSURE
FILTER
6.0 M. WIDE ROAD

GATE

CONVEYOR
GAS PIPE LINE 2" DIA. GAS PIPE LINE 2" DIA.

GAS PIPE LINE 12" DIA.

INTERMEDIATE SUMP PUMP PUMP


PUMP PUMP PUMP PUMP

TRAIN LINE
PUMP

GAS PIPE LINE 2" DIA.


PUMP PUMP
31.00 TANK
ACID / ALKALI

PUMP
30.00 30.00 30.00
TREATED
GAS PIPE LINE 2" DIA.

EFFLUENT SUMP
SETTLING TANK - 1 CLARIFLOCCULATOR

11.50
PRESSURE SAND FILTER
12.00

ACTIVATED CARBON BEDS

RAIN WATER HARVESTING SUMP


FLASH B

10.40
COLLECTION POINT NO. - 3
CAPACITY - 25m 3
MIXER
3.30 2.10

AERATION

GAS CONTROL
GAS PIPE LINE 2" DIA.

OPERATOR
GAS PIPE LINE 2" DIA.
TANK-1
UP-FLOW
3.00

PIPE RACK

ROOM
ETP
FILTER - 2

6.00
AERATION
AERATION
TANK-2 E TANK-3 GAS PIPE LINE TO CANTEEN

UNDER GROUND MDPE GAS PIPE LINE 3" DIA.


GAS PIPE LINE 2" DIA.

GAS PIPE LINE TO UNIT - 4

GAS PIPE LINE TO UNIT - 1


GAS PIPE LINE TO UNIT - 2
TANK

GAS PIPE LINE 3" DIA.


MECHANICAL UTLITI BUILDING
UP-FLOW

6.0 M. WIDE ROAD


RAIN WATER
RECEIVING TANK FILTER - 1 D
5.95

SETTLING
TANK - 2
SUMP STORAGE TANK
EQUALIZATION TANK EQUALIZATION TANK BED

6.00
TANK

5.95
TANK
RECALCULATION

HOT
SUMP
FILTER PEST
UPFLOW ANEORBTC
PUMP'S

LEV ROOM
5.33 PRIMARY FILTER
SLUDGE BED
EQUALIZATION TANK SETTLING TANK
EFFLUENT TREATMENT
PLANT PHASE - 1

202

201
D

D
LLP PUMP

COOLING
LLP TANK

TOWER

204

203
D

D
PIPE LINE
8.00

206

205
D

D
HOT & COLD WALL

GAS PIPE LINE 3" DIA.


D.G. ROOM
SLUDGE DIGESTER
WATER TREATMENT PLANT

SOFT FIRE & RAW


HOLDING

208

207
WATER WATER TANK

D
TANK PUMP'S
TANK
SOFT
ETP SUMP 1

D
WATER

210

209
D

D
TANK PIPE RACK
PIPE RACK

25.30
SOFT SOFT

SORBITOL TANKS
CONTROL ROOM
WATER WATER

PANEL BOARD
TANK TANK
PUMP
14.00

RWH STORAGE TANKS

5.79
HOUSE COOLING
EXISTING TOWER

212

211
D

D
PERSONAL T.P.M. SOFT SOFT
FIRE & RAW
WATER TANK

D
WATER WATER

PRODUCTS OFFICE TANK TANK TOOTHPASTE 2.74

SORBITOL TANKS
PRODUCTION HALL

214

213
D

D
PLANT
GAS PIPE LINE 2" DIA.

COOLING
STORE TOWER
ACTIVATED CARBON FILTER
D.M. W/TANK
LLP SHED

216

215
DUAL MEDIA FILTER

D
BOILER CHIMNEY BOILER CHEMICAL STORE
PUMP
F.J.P.

COOLING
TOWER
CABLE TRENCH 7.10
AIR RECEIVER

AIR RECEIVER GAS PIPE LINE 2" DIA. GAS PIPE LINE 2" DIA.

GAS CONNECTION NO - 3 GAS CONNECTION NO - 2 GAS CONNECTION NO - 1 AIR RECEIVER


6.25 9.00

EXISTING
BOUNDARY WALL

GAS PIPE LINE 3" DIA.

WERE HOUSE
UTILITY BUILDING
W/TANK
TEA GARDEN

WASHING UNITE
GAS PIPE LINE 3" DIA.
12.20

EXISTING COOLING BOILER ROOM


PERSONAL TOWER
PRODUCTS
PLANT

GAS PIPE LINE 3" DIA.


9.00

6.00 52.00
GATE

W/TANK

7.60
3.0 M. WIDE PATHWAY 15.23
6.00

30.00 15.00
6.00

COOLING 11.80
7.00
COLLATOR

TOWER
ETP SUMP-2

GAS PIPE LINE 3" DIA.


3.00
DUST

WORKSHOP GARDEN/GREEN BELT

PLOT BOUNDARY
LABORATORY COOLING
4.0 M. WIDE ROAD
SEPTIC TANK

TOWER TRAFO
2.00X6.00

BARBED WIRE ON TOP


CONCRETE BLOCK WALL WITH
PROPOSED .20 THK, 3.00 HIGH
15.00

1.00
15.00

H.R. OFFICE & O.H.C. 5.60


27.00

OFFICE &WORKER'S FACILITIES 7.00 7.00

TRAFO

GAS PIPE LINE 3" DIA.


5.60

WEIGH BRIDGE
14.50

D.G. ROOM

11.00
CONTROL ROOM FOR
WEIGH BRIDGE

FIRE HYDRAIN LINE


L.T. ENGINEERING

ROOM H.T. STORE


SOLER PANEL
ROOM

73.12
14.00

SPACE FOR BULK 14.20


2500 KVA
TRANSFORMER - 1
2500 KVA
TRANSFORMER - 1
STORAGE OF DISEL
(50 SQ. MTS.)

N.H. 37
5.00
1.5 M. WIDE PATHWAY

OFFICE BUILDING COOLING


6.00

5.00

TOWER SPACE FOR


20.50

33 KVA
GATE

12.00

GAS PIPE LINE 3" DIA.

.
DIA
3"

SWITCH YARD GA
S
PIP
E
LIN
E

6.0 M. WIDE ROAD

7.00

TRAIN LINE
18.00

20.25
GAS PIPE LINE 3" DIA. FIRE HYDRAIN LINE
GAS PIPE LINE 3" DIA.

GAS PIPE LINE 3" DIA. UNDER GROUND MDPE GAS PIPE LINE 3" DIA. GAS PIPE LINE 3" DIA.
GATE
7.80

AISF BARRACK GATE


CAR PARKING

3.25

SEPTIC
FL BE

CHANGING
OW D

TANK GAS PIPE LINE 3" DIA.

TWO WHEELER/CYCLE PARKING


ER

FOR150
ROOM

GATE HOUSE TWO WHEELER/CYCLE ER


W GATE
L O
PARKING PERSONS F ED HOUSE
B SECURITY CABIN SECURITY CABIN

G
A
S
PIP
E
LIN
VISITOR'S CAR PARKING

E
3"
.

D
IA

IA
D
3"

.
E
LIN
E
PIP

7.5 M. WIDE ROAD GATE FLOWER


GA
S

MAIN ENTRY GATE MAIN ENTRY GATE


BED 30 KV CTPT

FACTORY SITE PLAN FLOWER


GAS PIPE LINE 3" DIA.
UNDER GROUND MDPE GAS PIPE LINE 3" DIA.
GAS PIPE LINE 3" DIA.

BED
SCALE-1:100

TEA GARDEN

TEA GARDEN

GAS PIPE LINE LAY OUT PLAN OF


PERSONAL PRODUCTS FACTORY
HINDUSTAN UNILEVER LIMITED - UNIT - 1, 2, 3 & 4
DOOMDOOMA INDUSTRIAL ESTATE DOOMDOOMA
DIST. TINSUKIA
SCALE - 1:100

DRAWN BY -
HEMANTA BORPATRA GOHAIN
GELLAPUKHARI ROAD TINSUKIA
P.H. 9706514704

You might also like