Professional Documents
Culture Documents
Version: ac
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instructions for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
黄政
Compiled by 2017.7.6
潘敏杰 2017.7.6
毛旭 2017.7.11
Reviewed by Sup./Mgr.: 宋涛 2017.7.13
HO-QM: 李军 2017.7.19
Approved by 赵有伟
2017.7.24
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instructions for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
/Amendment Record
2015-01-06
ab 增加附录——现场问题反馈及解决方案 2016-07-07
ac 重新编辑文档。 2017-07-31
1.
2.
3.
4.
5.
6.
7.
8.
http://thyssenkrupp-elevator.com.cn
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
/Contents
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
1 涉及范围 Scope
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
封星接触器
封星功能整改组件
变频器型号 Contactor 备注
物料号
Type of Inverter Notes
Rect. Assy. Part No.
规格
Specification
CPI-20
CPIK-11M1
CPIK-15M1
CPIC-II-6 330238195 LC1-D098MDC
CPIC-II-9
CPIC-II-13
CPIC-II-18
CPI-32
CPIK-32M1
330125839 LC1-D128MDC
CPIC-II-27
详细物料见 5.3 章节
CPIC-II-34
See chapter 5.3 for
CPI-48
detailed material.
CPIK-48M1
330125840 LC1-D188MDC
CPIC-II-41
CPIC-II-48
CPI-60
CPIK-60M1 330125841 LC1-D258MDC
CPIC-II-65
CPI-105
CPIK-105M1
330125842 LC1-D40008MD
CPIC-II-80
CPIC-II-128
表 1 Table 1
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
封星接触器
封星功能整改组件
变频器型号 Contactor 备注
物料号
Type of Inverter Notes
Rect. Assy. Part No.
规格
Specification
CPI-20
CPIK-11M1
CPIK-15M1
CPIC-II-6
CPIC-II-9
CPIC-II-13 330238196 3RT2518-1BM40
CPIC-II-18
CPI-32
CPIK-32M1
CPIC-II-27
详细物料见 5.3 章节
CPIC-II-34
See chapter 5.3 for
CPI-48
detailed material.
CPIK-48M1
CPIC-II-41
CPIC-II-48 330238197 3RT2526-1BM40
CPI-60
CPIK-60M1
CPIC-II-65
CPI-105
CPIK-105M1
330238198 3RT2535-1NP30
CPIC-II-80
CPIC-II-128
表 2 Table 2
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
表 3 Table 3
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
According to the actual situation, check Table 1 & Table 2, confirm the material.
b) 将电梯呼至一楼候客厅,确认所有乘客已经离开轿厢后,在候客厅厅门前放置安全围栏,并在轿厢中放置安
全警示牌;
Call the car to the first of landing hall, Placing the safety fence in front of the landing hall after releasing all the
passengers, and add safety warning sign in car.
Go to the machine room, confirming that there is no passengers in the car by intercom, then rotate the switch(S01)
to the “electric emergency operation "state.
d) 按照《TKEC 员工安全手册》第五章中的“上锁挂牌使用步骤”进行上锁挂牌作业;
According to the "TKEC employee safety manual", which in the fifth chapter: "lock listing use steps" for the lock
listing operation.
e) 请遵循售后服务和安全部门的其他安全规定,若有疑问,请进一步联系蒂森克虏伯电梯中国。
Please follow the Service and Safety Department’s requiremtns about safety opearation. If you have questions,
further contact thyssenkrupp elevator China.
a) 如图 1 所示,在控制柜底板上合适位置开孔φ3.5,并用六角法兰面螺母和紧固件组合固定卡轨。将接触器
K06.2 固定在卡轨上。
Punch holes (φ3.5) on proper positions of controller soleplate, and fix clamping rail with hexagon nut with flange
and fastener assy. Fix contactor K06.2 on the clamping rail.
图 1 Figure 1
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
b) 在控制柜底板上合适位置开孔φ3.5,并用六角法兰面螺母和紧固件组合固定整流桥。
Punch holes (φ3.5) on proper position of controller soleplate, and fix rectifier bridge with hexagon nut with flange
and fastener assy.
a) 按线缆上号码套管标识并依据图 2 接线,确保接线正确、牢靠。
Connect wires according to the mark on conduits and Figure 2, and confirm the wires correct and firm.
图 2 Figure 2
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
b) 按线缆上号码套管标识并依据图 3 接线,确保接线正确、牢靠。
Connect wires according to the mark on conduits and Figure 3, and confirm the wires correct and firm.
图 3 Figure 3
c) 按线缆上号码套管标识并依据图 4 接线,确保接线正确、牢靠。
Connect wires according to the mark on conduits and Figure 4, and confirm the wires correct and firm.
图 4 Figure 4
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Connect wires of the main circuit that use the CPI series and CPIK series inverter according to the mark on conduits
and Figure 5, and confirm the wires correct and firm.
图 5 Figure 5
Connect wires of the main circuit that use the CPIC-II series inverter according to the mark on conduits and Figure 6,
and confirm the wires correct and firm.
图 6 Figure 6
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
a) 按线缆上号码套管标识并依据图 7 接线,确保接线正确、牢靠。
Connect wires according to the mark on conduits and Figure 7, and confirm the wires correct and firm.
图 7 Figure 7
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
b) 按线缆上号码套管标识并依据图 8 接线,确保接线正确、牢靠。
Connect wires according to the mark on conduits and Figure 8, and confirm the wires correct and firm.
图 8 Figure 8
c) 按线缆上号码套管标识并依据图 9 接线,确保接线正确、牢靠。
Connect wires according to the mark on conduits and Figure 9, and confirm the wires correct and firm.
图 9 Figure 9
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Connect wires of the main circuit that use the CPI series and CPIK series inverter according to the mark on conduits
and Figure 10, and confirm the wires correct and firm.
图 10 Figure 10
Connect wires of the main circuit that use the CPIC-II series inverter according to the mark on conduits and Figure
11, and confirm the wires correct and firm.
图 11 Figure 11
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
After the rectification with right connection, reconfirm the switch(S01) to the “electric emergency operation"state.
b) 封星功能确认,使用手动机械松闸装置,人为松开曳引机制动器,确认曳引轮缓慢旋转,确认完毕后,
恢复原状。
Electromagnetic braking function confirming, use the manual mechine brake-releaseing device, artifical loosen the
brake of T/M, make sure that the traction wheel can be run slowly, after the confirmation, restore the original state.
Open the safety lock of switch(Q00) in the controller, and removie the lock, listing and padlock mechanism, pull the
switch(Q00), make sure that the elevator can be run under the electric emergency operation.
Rotate the switch(S01) to the “normal" state, make sure that the elevator can be run in the normal operation.
Turn to normal mode without load, register car call instruction, and make K06.2 can’t close (remove K06.2 coil control
wiring), elevator system will keep stop with TCM system error code ‘7200‘.
Recover K06.2 coil control wiring, operate the elevator in normal mode without load. Simulate the situation that
contacts of K06.2 cannot open, elevator further movement of the car should be prevented with TCM system error
code ‘7100‘.
g) 操作电梯空载快车上下运行若干次(建议 30 次左右),确认电梯无故障;
Run elevator up and down for several times in normal mode without load, ensure system has no fault.
h) 在随机文件中放入图纸《主拖动电路图》、《安全回路电路图》和《主控制回路电路图》。
Attach the drawing ‘Traction Circuit‘ ,‘Safety Circuit‘& ‘Travel Contactors Circuit‘ to the random file into the
randwom files.
i) 将此次整改内容记入现场《维修保养记录表》中;
Record this rectification in the maintenance table.
j) 至候客厅,将安全围栏及轿厢中安全警示牌收回,恢复电梯使用。
Go to the landing hall, recover the elevator after taking back the safety warning signs and the safety fence.
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
4.1 图纸 Drawings
4.1.1 主拖动电路图(CPI、CPIK 系列) Traction Circuit(CPI ,CPIK Series)
3
2
1
1
3
2
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
14 1
53
54
13
14
13
14
13
61
62
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
14 1
53
54
13
14
13
14
13
61
62
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
5 备注 Notes
Electromagnetic braking function after the install, must be conducted once every three months verification of
electromagnetic braking function. With reference to the following steps.
a) 将电梯呼至一楼候客厅,确认所有乘客离开轿厢后,在候客厅厅门前放置安全围栏,并在轿厢中放置安
全警示牌;
Call the car to the first of landing hall, Placing the safety fence in front of the landing hall after releasing all the
passengers, and add safety warning sign in car.
Go to the machine room, confirming that there is no passengers in the car by intercom, then rotate the switch(S01)
to the “electric emergency operation "state.
c) 按照《TKEC 员工安全手册》第五章中的“上锁挂牌使用步骤”进行上锁挂牌作业;
According to the "TKEC employee safety manual", which in the fifth chapter: "lock listing use steps" for the lock
listing operation.
Please follow the Service and Safety Department’s requiremtns about safety opearation. If you have questions,
further contact thyssenkrupp elevator China.
e) 封星功能确认,使用手动机械松闸装置,人为松开曳引机制动器,确认曳引轮缓慢旋转,确认完毕
后,恢复原状;
Electromagnetic braking function confirming, use the manual mechine brake-releasing device, artifical loosen
the brake of T/M, make sure that the traction wheel can be run slowly, after the confirmation, restore the original
state.
Open the safety lock of switch(Q00) in the inverter Ctr. , and removie the lock, listing and padlock mechanism,
pull the switch(Q00), make sure that the elevator can be run under the electric emergency operation.
Rotate the switch(SAP) to the “normal" state, make sure that the elevator can be run in the normal operation.
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
h) 操作电梯空载快车上下运行若干次(建议 30 次左右),确认电梯无故障;
Run elevator up and down for several times in normal mode without load, ensure system has no fault.
i) 至候客厅,将安全围栏及轿厢中安全警示牌收回,恢复电梯使用。
Go to the landing hall, recover the elevator after taking back the safety warning signs and the safety fence.
This guide is only applicable to in strict accordance with the PDC standard configuration ARD function of elevator
(the elevator is still controlled by TCM system at ARD mode), ARD device information please see table4.
表 4 Table 4
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
For the non-standard ARD solution provided by other parties( the elevator is controlled by ARD system at ARD
mode), currenty this technical instruction is Not suitable.
Electromagnetic braking Function Assy. No. 330238195 contained material, see table 5.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330107693 1 PC LC1-D098MDC
Braking Contactor
整流桥
2 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
3 Controller Control 330125836 1 SET
330238195 Cable
卡轨
4 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
5 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
6 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
7 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 5 Table 5
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330125839 contained material, see table 6.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330105689 1 PC LC1-D128MDC
Braking Contactor
整流桥
2 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
3 Controller Control 330125836 1 SET
330125839 Cable
卡轨
4 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
5 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
6 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
7 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 6 Table 6
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330125840 contained material, see table 7.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330105687 1 PC LC1-D188MDC
Braking Contactor
整流桥
2 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
3 Controller Control 330125836 1 SET
330125840 Cable
卡轨
4 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
5 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
6 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
7 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 7 Table 7
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330125841 contained material, see table 8.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330105688 1 PC LC1-D258MDC
Braking Contactor
整流桥
2 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
3 Controller Control 330125836 1 SET
330125841 Cable
卡轨
4 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
5 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
6 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
7 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 8 Table 8
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330125842 contained material, see table 9.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330125835 1 PC LP1-D40008MD
Braking Contactor
辅助触点
2 200006078 1 PC LA1-DN11C
Auxiliary Contact
整流桥
3 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
330125842 4 Controller Control 330125837 1 SET
Cable
卡轨
5 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
6 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
7 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
8 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 9 Table 9
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330238196 contained material, see table 10.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330193773 1 PC 3RT2518-1BM40
Braking Contactor
辅助触点
2 330193743 1 PC 3RH2911-1HA11
Auxiliary Contact
整流桥
3 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
330238196 4 Controller Control 330125836 1 SET
Cable
卡轨
5 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
6 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
7 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
8 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 10 Table 10
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330238196 contained material, see table 11.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330193775 1 PC 3RT2526-1BM40
Braking Contactor
整流桥
2 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
3 Controller Control 330125836 1 SET
330238197 Cable
卡轨
4 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
5 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
6 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
7 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 11 Table 11
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Electromagnetic braking Function Assy. No. 330238198 contained material, see table 12.
序号 品名 物料号 数量 规格
No. Material Material Num. Qty Specification
封星接触器 K06.2
1 Electromagnetic 330193777 1 PC 3RT2535-1NP30
Braking Contactor
整流桥
2 200006070 1 PC QL 15A/1000V
Rectifier Bridge
控制柜控制线缆
3 Controller Control 330125836 1 SET
330238198 Cable
卡轨
4 200207346 1 PC TL35 100*35*75
Clamping Rail
六角法兰面螺母
5 Hexagon Nut with 200000521 3 PC M4 8 GB/TT6177.1
Flange
紧固件组合
6 200000518 3 PC M4*16 GB9074.4
Fastener Assy.
辅助触点
7 200006079 1 PC LA1-DN22C
Auxiliary Contact
表 12 Table 12
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
Solution)
产品整改指引——有机房主机追加封星功能(aa 版)已发布数月,在此期间收到一些分公司现场问题反馈。
本附录整理收录了这些现场问题反馈及解决方案。
“R000055291(Ver. aa): Technical Instruction for Product Rectification – Add Electromagnetic Braking Function for
MR T/M” has been released for months. After months of Field implementation, some issues have been reported from
branch companies. This file is released to provide supplementary instruction for these common issues raised by branches.
Issue: The controller is equipped with ARD function on the jobsites ( Beijing & Zhengzhou &
Nanchang)
解决方案 Solution:
○
1 《R000002161 ARD 技术条件》;
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
○
2 《R000045883 380V-自动救援装置(DL1-ARD490T)技术条件》;
○
3 《R000045884 220V-自动救援装置(ARD-1P-××-××)技术条件》。
2. 问题类型:工地上的电气原理图与整改指引的设计有冲突(广州&南宁&天津)
Issue: The electrical circuit drawings on jobsites are different from the drawings of the technical
instrction (Guangzhou & Nanning & Tianjin):
解决方案 Solution:
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
图 2-1 整改前 Figure2-1 Before correction 图 2-2 整改后 Figure 2-2 After correction
002 天津:按照电气原理图,正确的接法如下:
Tianjin: According to the electrical circuit drawing, the normal wiring forms are:
① K06-22 应接到 K06.1-21;
K06-22 should be connected with K06.1-21;
② K06.1-14 应接到 K01.1-53。
K06.1-14 should be connected with K01.1-53.
但我们发现数个项目的控制柜实际接线与电气原理图不符:
But we have found there are several projects that have wiring differences:
① K06-22 接到 K06.1-22;
K06-22 is connected with K06.1-22;
② K06.1-13 接到 K01.1-53。
K06.1-13 is connected with K01.1-53.
解决方案 Solution:
1) 根据工厂发放的电气原理图,修正控制柜的接线;
To re-wiring the controller cables according to the factory electrical drawing;
2) 其余部分仍按本指引处理。
The rest part of the instruction please follow this technical instruction.
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
3. 问题类型:现场电梯安装带有能量反馈功能的变频器(合肥):
Issue: The inverters on jobsites are with energy feedback function (Hefei):
005 合肥:合肥要素大市场的梯台为非标配置,带有能量反馈功能。
Hefei: The inverters on Yaosu Supermarket are non-standard with energy feedback function.
解决方案 Solution:
According to the electrical circuit drawing provided by field personnel, this project can be added with
electromagnetic braking function according to this technical instrction.
4. 问题类型:封星接触器无法在控制柜中固定(北京):
008 北京 Beijing:
① 封星接触器无法在控制柜底板固定;
The contactor can not be fixed on the soleplate of the controller;
② 固定卡规与封星接触器尺寸不匹配(型号:LP1D40008MD)(如图 4-1);
The fix guide rail is not suitable with the contactor (LP1D40008MD type); (Figure 4-1);
③ 封星接触器不能固定在控制柜右上角,因为相关电缆长度不够(如图 4-2)。
MG contactor is not available on the top right corner because of the insufficient length of relevant
cable .(Figure 4-2)
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
解决方案 Solution:
MG contactor (LP1D40008MD type) can be installed on the side plate of controller (Figure 4-3), we can use three
screws and three nuts to fix the contactor (Figure 4-4).
5. 问题类型:电梯变频器端标注如果加装封星接触器,需要加延时电路(CPIC-II 类型变频器)(宁
波)
Issue: Caution on the inverter notes that time-delay circuit is needed if there is MG contactor (CPIC-
II Inverter) (Ningbo)
产品整改技术指引---有机房(MC2)追加封星功能 ac
Technical Instruction for Product Rectification Version
---Add Electromagnetic Braking Function for MR(MC2)
2017-07-31
R000055291 Effective Date
解决方案 Solution:
For CPIC-II inverter, please add MG circuit according to this technical instruction.