Professional Documents
Culture Documents
STOP
DWS - 12
0+208 - (03)
PRS - 01
0+253 - (05)
STOP
STA: 0+420
STA: 0+400
STA: 0+38
STA: 0+36
STA: 0+34
STA: 0+32
STA: 0+30
0
STA: 0+280
0
STA: 0+260
0
STA: 0+200
STA: 0+240
STA: 0+220
0
0
DWS - 12 STOP
0+301 - (06)
STOP
PRS - 01
0+395 - (08)
PRS - 01
0+246- 04)
NAWALOKA CONSTRUCTION COMPANY REV. DESCRIPTION SECOND INTEGRATED ROAD INVESTMENT PROGRAM
EMPLOYER : CONTRACTOR: No.
DATE CONSULTANT: EGIS INTERNATIONAL & GREENTECH LTD
(pvt) Ltd REHABILITATION/ IMPROVEMENT AND MAINTENANCE OF 71.97 km
23/11/2021 94/50, Kirulapone Avenue, Colombo 05
00 First Submission RURAL ROADS IN AMPARA DISTRICT IN THE EASTERN
115, Sir James Peiris Mw, Colombo 02, Sri Lanka. Sri Lanka.
DEMOCRATIC SOCIALIST REPUBLIC OF Tel: 0112514285 PROVINCE - PACKAGE -05
Tel: 0115551111
SRI LANKA CONTRACT NO: RDA/ADB/iROAD-2(EP)/NCB/AM-05
MINISTRY OF ROADS & HIGHWAYS DESIGNED BY DRAWN BY SUBMITTED BY (PM/DPM) CHECKED BY(SURV./DRF) CHECKED BY (HDE) APPROVED BY (RE/ ARE) ROAD MARKING AND SIGN BOARD DESIGN
NAME L.S.S.L.P De Silva AAM. Razeen Eng.S. Aravinthan ROAD MARKING AND SIGN BOARD DESIGN
UDAYAR ROAD EAM 041 REVISION 00
ROAD DEVELOPMENT AUTHORITY SIGNATURE
CH : 0+000 to 0+930
DATE SCALE DRAWING No : iROAD-2(EP)/NCB/AM-05/EAM-041/RM/R-00/
23/11/2021 23/11/2021 23/11/2021
1:600 DATE : 23/12/2021