Site : TECHNICOLOR (data Activity: - Termination of Location: Ground floor Date: 07/01/2021
Risk Assessment No: centre cable creator building ITPL
jointer.
• Ensure that hydraulic
crimping tool to be
used is calibrated and
functional
• Ensure that crimping
toot must be
compatible or same
size with the lugs or
connectors
2. TESTING •using damaged hand tools 3 2 6 • All hand tools must 3 2 6
be in good condition,
Continuity •Using damaged testing no homemade hand
Test equipment.
Insulation tools to be used at site,
Testing group • Bad housekeeping, supervisor to check
Resistance Test Personnel may slip, trip and
Phase • Access towards to the
fall testing area to be
Orientation
check
•at the same ground barricaded and
•Unauthorized person. watchman to be
posted.
•Electrocution • Testing area to be
•Unauthorized workers barricaded and proper
sign boards to be
•Slip 'Trip / Fall same level placed which read
"TESTING IN PROGRESS
KEEP AWAY".
•Avoid cable joint.
• Ensure that all power
sources to be
connected with ELCB.
HAZARD IDENTIFICATION RISK ASEESSMENT (HIRA) WORK SHEET
Site : TECHNICOLOR (data Activity: - Termination of Location: Ground floor Date: 07/01/2021
Risk Assessment No: centre cable creator building ITPL
• All testing
equipments must be in
good condition and
with valid test
calibration.
gangway to be kept
free of obstruction.
• All temporary cable
should be properly
organized.
Likelihood
Severity