You are on page 1of 9

Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km

140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
182+845 LHS 1.4 30 1.5
182+875 LHS 1.6 130 2.0
182+915 LHS 0.5 120 1.9
182+945 LHS 1.0 100 1.8
182+975 LHS 1.0 110 1.7
182+990 LHS 0.7 150 2.0
183+020 LHS 1.3 140 2.0
183+050 LHS 1.7 130 1.9
183+080 LHS 1.5 140 1.8
183+110 LHS 0.5 90 2.0
183+145 LHS 1.4 110 2.0
183+185 LHS 1.5 90 2.1
183+225 LHS 1.5 87 2.0
183+265 LHS 1.0 100 2.0
183+308 LHS 1.3 130 2.0
183+338 LHS 0.5 120 2.0
183+370 LHS 1.0 150 2.0
183+400 LHS 1.4 160 2.0
183+435 LHS 1.2 120 1.8
183+470 LHS 0.5 100 2.0
183+510 LHS 1.5 78 2.0
183+540 LHS 1.5 90 2.0
183+578 LHS 0.5 120 1.9
183+620 LHS 0.5 140 2.0
183+650 LHS 1.0 130 2.0
183+695 LHS 1.5 120 2.0
183+730 LHS 1.2 100 1.9
183+765 LHS 0.5 100 2.0
183+800 LHS 0.5 100 2.0
183+845 LHS 1.5 150 2.0
183+875 LHS 1.5 120 2.0
183+910 LHS 1.4 130 2.0
183+955 LHS 1.2 118 2.1
183+985 LHS 1.0 110 1.9
184+025 LHS 0.6 110 1.9
184+055 LHS 1.3 120 1.9
184+090 LHS 1.4 120 2.0
184+130 LHS 1.3 135 2.0
184+165 LHS 1.3 100 2.0
184+200 LHS 1.4 125 2.0
184+245 LHS 1.5 110 2.0
184+295 LHS 1.4 130 2.0
184+335 LHS 1.3 140 1.9
184+370 LHS 0.7 140 2.0

Page 1 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
184+405 LHS 1.6 150 2.0
184+445 LHS 1.5 145 2.0
184+500 LHS 1.6 60 2.1
184+537 LHS 1.3 120 2.0
184+575 LHS 1.4 130 2.0

184+665 LHS 1.0 125 2.1


184+705 LHS 1.5 130 2.0
184+755 LHS 1.4 120 2.1
184+790 LHS 1.3 115 2.0
184+825 LHS 0.5 100 1.8

184+960 LHS 0.9 110 1.8


184+995 LHS 0.8 100 1.8
185+030 LHS 0.9 90 1.7
185+065 LHS 1.0 95 2.0
185+110 LHS 1.0 100 1.7
185+160 LHS 1.0 80 2.0
185+195 LHS 0.9 90 1.7
185+236 LHS 1.1 90 1.9
185+270 LHS 1.5 60 1.5
185+310 LHS 1.7 99 1.7
185+350 LHS 0.9 110 0.9
185+390 LHS 1.7 100 1.7
185+420 LHS 1.5 100 1.5
185+450 LHS 1.6 115 1.6
185+480 LHS 1.3 65 1.3
185+510 LHS 1.6 120 1.6
185+530 LHS 1.3 118 1.3
185+560 LHS 1.2 110 1.2
185+590 LHS 1.1 180 1.1
185+620 LHS 1.2 140 1.2
185+650 LHS 1.5 190 1.5
185+680 LHS 1.5 120 1.5
185+710 LHS 1.4 110 1.4
185+740 LHS 1.3 100 1.3

186+110 LHS 0.9 135 2.0


186+140 LHS 1.3 140 2.0
186+170 LHS 1.4 130 1.9
186+200 LHS 1.3 140 1.8

186+570 LHS 1.1 125 2.0

Page 2 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
186+630 LHS 1.0 123 2.0
186+660 LHS 1.0 140 2.0
186+690 LHS 1.0 125 1.9

187+970 LHS 1.1 70 2.0


188+000 LHS 1.0 170 2.0
188+030 LHS 1.0 120 1.8
188+050 LHS 0.7 130 1.5

188+115 LHS 1.0 180 1.9


188+145 LHS 1.2 120 2.0
188+175 LHS 1.4 115 1.9
188+205 LHS 1.2 120 2.0
188+235 LHS 1.1 140 1.9
188+265 LHS 1.0 115 2.0
188+280 LHS 1.1 110 1.9

189+545 LHS 1.1 120 2.0


189+575 LHS 1.2 128 2.0
189+605 LHS 1.0 100 1.9
189+625 LHS 1.1 145 1.9

189+690 LHS 1.0 100 1.9


189+720 LHS 1.1 105 2.0
189+750 LHS 0.9 175 2.2
189+780 LHS 1.0 120 2.0
189+810 LHS 1.2 95 1.9

190+200 LHS 0.9 115 1.9


190+230 LHS 1.1 120 2.0
190+260 LHS 0.9 145 1.9
190+290 LHS 1.0 118 1.9
190+320 LHS 1.3 100 1.9
190+350 LHS 1.3 130 1.9
190+390 LHS 0.9 145 2.0
190+420 LHS 1.0 110 2.0
190+450 LHS 1.0 95 2.0
190+480 LHS 0.8 100 2.0
190+510 LHS 0.9 92 2.0
190+540 LHS 0.6 110 2.0
190+570 LHS 0.8 100 1.9
190+600 LHS 0.9 108 1.9

190+735 LHS 0.9 40 2.0

Page 3 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
190+770 LHS 0.9 120 1.8
190+800 LHS 0.9 95 2.0
190+830 LHS 0.9 65 2.0
190+860 LHS 0.5 120 2.0
190+890 LHS 1.2 65 2.0
190+920 LHS 1.5 90 2.0
190+950 LHS 1.2 110 2.0
190+980 LHS 1.2 85 1.8
191+010 LHS 1.0 125 1.8
191+040 LHS 1.0 130 1.7
191+070 LHS 1.0 88 1.8
191+100 LHS 1.2 65 1.8
191+130 LHS 1.2 90 1.8
191+155 LHS 1.1 70 1.7

191+250 LHS 1.4 95 2.0


191+280 LHS 1.4 120 2.1
191+310 LHS 1.2 95 1.8
191+340 LHS 1.2 120 2.4

191+410 LHS 1.0 175 1.7


191+440 LHS 1.5 135 2.0
191+470 LHS 1.4 110 2.2
191+500 LHS 1.3 100 1.5
191+530 LHS 1.0 95 1.8
191+560 LHS 0.5 90 2.0
191+590 LHS 0.6 100 1.9
191+620 LHS 1.4 75 1.8
191+650 LHS 0.8 67 1.9
191+680 LHS 1.2 65 1.9
191+710 LHS 0.9 130 1.8
191+740 LHS 1.0 95 1.9
191+770 LHS 0.4 115 1.9

192+180 LHS 1.0 70 2.0


192+210 LHS 1.0 130 1.9
192+240 LHS 1.0 120 1.9
192+270 LHS 0.6 125 1.9
192+300 LHS 1.2 135 2.0

192+420 LHS 1.0 63 2.0


192+450 LHS 1.2 137 1.8
192+480 LHS 1.2 100 1.9
192+510 LHS 1.1 115 2.0

Page 4 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
192+540 LHS 0.9 115 2.0
192+570 LHS 1.2 70 1.9
192+600 LHS 1.1 110 1.8
192+630 LHS 1.2 115 2.0
192+660 LHS 1.1 100 2.0
192+690 LHS 1.2 110 2.0
192+720 LHS 1.0 115 1.9
192+750 LHS 1.0 118 2.0
192+780 LHS 1.6 77 2.0
192+810 LHS 1.3 105 2.0
192+840 LHS 1.1 120 2.0
192+870 LHS 1.3 105 2.0
192+900 LHS 1.2 110 2.1
192+930 LHS 1.0 114 2.0
192+960 LHS 1.1 100 1.9
192+990 LHS 1.2 115 2.0
193+020 LHS 1.2 115 1.9
193+050 LHS 1.6 75 2.0
193+080 LHS 1.0 128 2.1
193+110 LHS 1.1 135 2.0
193+140 LHS 1.2 142 2.0
193+170 LHS 1.3 155 2.0
193+200 LHS 1.3 112 2.0
193+230 LHS 1.5 220 2.0
193+260 LHS 0.8 100 2.0
193+290 LHS 1.4 105 2.0
193+320 LHS 1.0 60 2.0
193+350 LHS 1.1 135 1.8
193+380 LHS 1.1 150 1.7
193+410 LHS 0.9 145 1.8
193+440 LHS 1.3 130 2.0
193+470 LHS 1.0 125 2.2
193+500 LHS 0.4 100 2.0

193+560 LHS 1.0 125 2.3


193+590 LHS 1.0 130 2.2
193+620 LHS 1.1 150 1.7
193+640 LHS 1.0 80 1.8
193+670 LHS 1.2 90 2.1
193+700 LHS 1.0 95 1.8
193+730 LHS 1.3 80 1.9
193+760 LHS 1.2 95 1.9
193+790 LHS 1.1 65 2.0
193+820 LHS 1.1 85 2.0

Page 5 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
193+850 LHS 1.3 60 2.0
193+880 LHS 1.3 90 2.0
193+910 LHS 1.0 245 2.1
193+940 LHS 0.7 85 2.2
193+980 LHS 1.1 140 2.0
194+010 LHS 0.5 120 2.1
194+040 LHS 1.5 145 2.1
194+070 LHS 1.4 65 2.0
194+100 LHS 1.0 130 2.0
194+130 LHS 1.1 110 2.0
194+160 LHS 1.2 90 1.9
194+190 LHS 1.3 10 2.0
194+220 LHS 1.0 52 2.0
194+250 LHS 0.8 80 2.0
194+280 LHS 1.0 70 1.9
194+310 LHS 1.1 100 1.8

194+400 LHS 0.8 70 1.8


194+430 LHS 1.0 80 1.9
194+460 LHS 0.9 95 1.8
194+490 LHS 1.0 150 2.0
194+520 LHS 1.0 120 1.8
194+550 LHS 0.9 110 1.8

194+740 LHS 0.9 132 2.0


194+770 LHS 1.1 105 1.8
194+800 LHS 1.0 155 2.0
194+830 LHS 1.1 180 2.0
194+860 LHS 0.5 170 2.0

207+920 LHS 0.8 148 1.9


207+970 LHS 0.8 65 2.2
208+020 LHS 0.9 113 2.0
208+070 LHS 0.8 92 2.0
208+120 LHS 1.0 105 2.0
208+170 LHS 0.9 130 2.0
208+220 LHS 1.1 95 1.9

208+290 LHS 0.9 110 2.1


208+340 LHS 1.5 140 2.1
208+390 LHS 1.4 145 2.1
208+440 LHS 1.4 100 2.0
208+490 LHS 1.5 110 2.0
208+540 LHS 1.1 130 2.0

Page 6 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)

209+180 LHS 0.7 120 2.2


209+230 LHS 0.8 93 2.0
209+280 LHS 0.7 120 2.2
209+330 LHS 0.7 120 2.2
209+380 LHS 0.8 120 2.2
209+430 LHS 0.5 148 2.0
209+480 LHS 1.2 95 2.0
209+530 LHS 1.0 80 2.1
209+580 LHS 1.2 120 2.0
209+630 LHS 1.5 100 2.2
209+680 LHS 0.9 145 2.1
209+730 LHS 1.0 150 2.1
209+780 LHS 1.5 150 2.1
209+830 LHS 0.6 142 2.2
209+880 LHS 0.5 150 2.1
209+930 LHS 0.5 135 2.1
209+980 LHS 1.5 110 2.2
210+030 LHS 0.45 112 2.2
210+080 LHS 0.9 140 2.2
210+130 LHS 1.5 163 2.1
210+180 LHS 0.4 160 2.2
210+230 LHS 1.0 150 2.2
210+280 LHS 0.9 148 2.1
210+330 LHS 0.6 130 2.3
210+380 LHS 0.9 148 2.1
210+430 LHS 0.9 145 2.1
210+480 LHS 0.8 150 2.0
210+530 LHS 0.8 140 2.0
210+580 LHS 0.7 130 2.1
210+630 LHS 1.5 153 2.2
210+680 LHS 0.6 155 2.1
210+730 LHS 1.0 138 2.1
210+780 LHS 0.5 145 2.0
210+830 LHS 0.9 95 2.2
210+880 LHS 0.6 160 2.1
210+930 LHS 0.7 146 2.1
210+980 LHS 1.5 130 2.2
211+030 LHS 0.6 112 2.2
211+080 LHS 1.4 90 2.1
211+130 LHS 0.7 240 2.1
211+180 LHS 1.2 108 2.2
211+230 LHS 0.45 180 2.3
211+280 LHS 0.8 155 2.2

Page 7 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
211+330 LHS 1.0 132 2.2
211+380 LHS 1.2 130 2.3
211+430 LHS 0.9 145 2.1
211+480 LHS 0.7 110 2.1
211+530 LHS 0.6 145 2.0
211+580 LHS 0.5 132 2.0
211+630 LHS 0.7 125 2.2

211+770 LHS 0.7 100 1.9


211+820 LHS 1.0 190 2.0
211+870 LHS 0.5 130 2.0
211+920 LHS 0.9 135 2.0
211+970 LHS 0.6 160 2.0
212+020 LHS 0.6 145 2.0
212+070 LHS 0.7 120 2.0
212+120 LHS 0.7 120 2.0
212+170 LHS 0.9 105 2.0
212+220 LHS 0.8 140 2.0
212+270 LHS 1.4 145 2.1
212+320 LHS 1.5 140 2.1
212+370 LHS 1.5 150 2.1
212+420 LHS 1.7 110 2.1

212+870 LHS 1.5 95 2.0


212+910 LHS 1.0 90 1.8

214+560 LHS 1.0 195 2.0


214+610 LHS 0.9 135 2.2
214+660 LHS 0.6 145 2.1
214+710 LHS 1.4 142 2.0
214+760 LHS 1.0 135 2.1
214+810 LHS 1.0 150 2.0
214+860 LHS 0.4 140 2.1
214+910 LHS 1.1 140 2.1
214+960 LHS 1.0 120 2.2
215+010 LHS 0.6 180 2.1
215+060 LHS 1.0 145 2.1
215+110 LHS 0.9 120 2.0
215+160 LHS 1.5 120 2.1
215+210 LHS 0.4 140 2.1
215+260 LHS 0.6 190 2.0
215+310 LHS 1.0 155 2.2
215+360 LHS 0.7 150 2.0

Page 8 of 9
Name of Project:-"Balance work of four/six laning Ranchi-Rargoan section of NH-33 from km
140.000 to km 217.300 (77.300 km length) in the state of Jharkhand under the NHDP Phase-
III on EPC Mode Package-II"

GSB Shoulder Inventory Reports


Offset from black top
Thickness Width
Location Side Edge Remarks
(mm) (m)
(m)
215+440 LHS 1.5 190 2.1
215+490 LHS 0.6 165 2.1
215+540 LHS 1.1 135 2.1
215+590 LHS 0.6 145 2.1
215+640 LHS 0.8 180 2.0
215+690 LHS 0.5 120 2.0
215+740 LHS 0.8 145 2.1
215+790 LHS 0.6 150 2.2
215+840 LHS 1.2 135 2.0
215+890 LHS 1.1 125 2.1

216+180 LHS 1.4 100 2.1


216+230 LHS 0.5 145 2.0
216+280 LHS 0.7 150 2.1
216+330 LHS 0.9 135 2.1
216+380 LHS 1.1 125 2.0
216+430 LHS 1.0 130 2.1
216+480 LHS 0.9 150 2.1

216+640 LHS 1.0 100 2.2


216+690 LHS 0.7 125 2.0
216+740 LHS 1.5 100 2.2
216+790 LHS 1.0 125 2.0
216+840 LHS 0.9 110 2.1

Page 9 of 9