You are on page 1of 2
Haw s@sSeen o) SQsdnn OsIAEG BsFur By aupexssd, oulgesnorsm.0iity s6n11 National Water Supply & Drainage Board ©0QOd CAS - HDEGSAd SMDED SE Borg OnoaBo Sai ILS - UN SEUT Qsienamnbs Gr AGG Brad KANDY NORTH PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT. gémOmo / Telephone : 081 2492287 / 081 2500364 coutbe Fax: 081 2492286 dnc gone sarge E-mail: kandynorthpiwsp@gmail.com 256 sanitouesia, ri = J. pasos Tropa Decors Ofce Project Director Pahala Kondadeniya, Katugnstota fxs ums} RSC-CIKandy North 03-8 1€11320)1 (800198732. pee} 2021.11.01 My No Date Mr. Shi Zhifeng, Project Manager, M/s Sinohydro Corpor: Hotel Sunrich, Hedeniya, Kandy. Dear Sir, ND BARIGAMA ROAD: ra Integrated Water Suppl ‘This has with reference to meeting held on 29% October 2021 with Sinohydro Hariasapattuwa team and Kent engineering pvt (Ltd) regarding barigama and gohgoda RDA roads, Following descensions were taken on above meeting 1. Agreed to put two permanent reinstatement gangs and two rectification gang for above roads from 31# October 2021 2, Sample collecting of every 100m for ABC and gravel to be complete before 02m November 2021and Total test reports with summery of both roads should submit within two weeks. ‘Two compaction team should utilized both roads. 4, Instruct to complete damage drain and continue the surface drain (at Gohgoda road Galwanguwa) up to where necessary. Site inspection to be arrange regarding finalized the length. 5. Sample Asphalt rectification work will do on 03rd november2021. ‘Therefore, you are requested to pay your attention & make necessary arrangement to establish a system for proper planning, monitoring, managing & coordination of the work by re-structuring the team for the successful project out comes rn SeaESS a ata TOT TAT Reetomee ®” Tesh: Chman O11 2634488 GenealMarmper 01126364 aaron 286} ee “Telex 21489 NWSDBCE antec al item ranma ledaaa prvenGSbeson os SAR dg giO20 2078 sohagode_chandia docx MINISTRY OF WATER SUPPLY "Water - Every Drop is Precious” @OM0d CRI-CIDLBAS EMAL de oBmrem ONEAGS F657 OG - LOMMbaHiT qeinenoompy Gr oAPCusrags gud Kandy North-Pathadumbara Integrated Water Supply Project RSC-CiKandy-North/ 03-B L'/320)/ @on1B97Z8) 2021.11.01 Your immediate action in this regard is Highly appreciated. Yours faithfully, Kandy North - Pathaudmbara Integrated Water Supply Project — 0 Eng. DV Medawatte Project Director CC O1 Eng. Dhananjaya Henakaarachchi, SE, KNIWSP 02, Project manager. KENT Engineering \\192.168.1.26\1-draft document\chandima\letter\2021\october\29_oct_2021_ea kushan_meeting an barigama ‘gohagds_chandima.doce

You might also like