National Water Supply & Drainage Board
OHQOS EQS - HNESAS SMA dE aden Omaas
Sail) LSS - UISSBIUT Qaninambs Gr APuTas DLLw
KANDY NORTH PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT
g6mda0 / Telephone : 081 2492287 / 081 2500864
coxa | Fax : 081 2492286 dner8 gone earn,
email : kandynorhpiwsp@gmail.com 256 eantioucda, fossaa0
ncx8 oOo" 1. og aco504 a Project Director's Of,
Project Director ahala Kongadeniya, Katugastota
7 : E ani ahaa Konsdadeniya, Katuga
ae al ‘C/Kandy-North/03-B_ (C1410) /ez081 MI!) aft Ag
Date
MyNo Mfr. Shi Zhifeng, :
Project Manager,
Mis Sinohydro Corporation Ltd,
Hotel Sunrich,
Hedeniya, Kandy,
Dear Sir,
ROADS DAMAGES DURING PROJECT CONSTRUCTION WORKS
KANDY NORTH - PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT.
CONTRACT NO. P&P/DB/PATHADUMBARA/2013,
This has reference to your letter no L-KNPIWSP-PD-2021-1887 dated 6 November 2021
regarding above subject.
We highly condemn the points that you mentioned in the above letter avoiding liability in
accordance with the contract agreement, According to the contract agreement it is clearly
mentioned that the contractor shall be responsible for the any damages which occurred as a
result of construction work along the roads within construction period and also in two years
maintenance period. Further, existing road conditions shall be re-established before handing
over of the completion section back to relevant authority. As per the clause 8,2.1.7.1.43 it is
clearly mentioned “The contractor obligation shall terminate on completion of the
maintenance period as described in clause 1” (for farther detail refer Contract document
clause 8.2.1.7.1 for RDA conditions).
Also, in clause 8.2.1.7.3 under specifications it is mentioned that “The contractor shall
include in his price for all materials and labour which he may bi;
e to employ and other
expense in reinstating such trenches and surfaces to their original condition to the
satisfaction of the Engineer and responsible Authority concerned”, Hence you are not
allowed to rectify those damages together with permanent reinstatement work.
Except the permanent reinstatement of trenches, you are given approval for the additional
reinstatement work on some shoulder areas on selected roads to prevent sequence damages
with considering existing condition prior to execution of trenching.
>o OEHGS Talcphones SS moa 9 Bie Bas ON TGRIET 3) GT
Head Ofc Telephone: Chrinman 11263488 General Manager N26 Te 2635247 2635096 2634531
ei00, guse ogszs wages edeom ‘Telex: 21482 NWSDB CE
Adésess : P.O, Box IS Mi Lavinia Galle Rosd__Rstnalna, Sei Lanka Fax: 2636149 /263718
‘MINISTRY OF WATER SUPPLY
“water- Every Drop is Precious”Bo 8d CAd-ma~826 EMAL de aBoreH Omei6o
Baring Lb - LOMDABBAOUT Qsinomamidgs sr AiGBusrefs CLAD
Kandy North-Pathadumbara Integrated Water Supply Project
RSC-C/Kandy-North/03-B__/C11910)/cs02/-H11)) 2021.12.15
Hence, we are not in an any position to accept this kind of statement from you as a major
company in the construction field. Also, our officials have already identified the damages
occurred by your construction work considering conditional survey taken at the beginning of
the execution of work. Hence you are advised to attend for the road damages occurred by
trenching works along all type of roads without requesting to do together with permeant
reinstatement work.
And if you not attend for the work, we will get strict action accordingly to maintain the quality
of future construction work.
Your carly attention in this regard is highly expected.
Yours faithfully,
Kandy North - Pathadumbara Integrated Water Supply Project
a
Eng. D V Medawatte
Project Director
Ce:
01. Eng. HP K D Henakaarachchi, SE, KNPIWSP