NOTES:

CL 1. PHILOSOPHY AND EXTENT OF PASSIVE FIREPROOFING


A
(NOTE 7) CL CL SHALL BE IN ACCORDANCE WITH S-0000-1241-003. A
CL
2. SECTION DETAILS OF FIREPROOFING SHALL BE REFERED
TO STANDARD DWG FIREPROOFING (2/2)
(FP) (FP)
3. THE MINIMUM THICKNESS OF FIREPROOFING MATERIALS
FOR STRUCTURAL MEMBERS SHALL BE INSTALLED WITH
A THICKNESS TO PROVIDE A MINIMUM FIRE-RESISTANCE
RATING OF TWO (2) HOURS WHEN SUBJECTED TO A TEST
FURNACE ENVIRONMENT IN ACCORDANCE WITH UL 1709
OR AN EQUIVALENT FIRE EXPOSURE TEST PROCEDURE
ACCEPTED BY PURCHASER. FOR INDICATION SHALL BE
FP

B B
FP OR (FP).

FP
FP
4. FIREPROOFING MATERIAL TYPE SHALL BE LIGHTWEIGHT
(FP) SPECIFIED EL OF TOP OF FP CEMENTITIOUS.
5. FOR THE DETAIL OF EXPANSION JOINT, SEE STANDARD
DWG D-0000-1330-040.
6. FIREPROOFING SHALL NOT BE PROVIDED AROUND STEEL
STRUCTURE CONNECTION WITH SLOT HOLES.

FP
7. THICKNESS OF FIREPROOFING SHALL BE MEASURED
C C
FROM OF THE BOLT.
02

FP

FP
8. REGARDLESS OF FIREPROOF REQUIRED AREA, COLUMN
(NOTE 7) AND MAIN BEAM OF A16ES01, C10ES02 AND C10SH02
(FP) (FP) SHALL BE APPLIED 3 HOURS FIRE RESISTANCE IN

FP
ACCORDANCE WITH ISO 834 AND ASTM E119 OR
EQUIVALENT BASED ON "BUILDING CONTROL ACT,
B.E 2522". FOR INDICATION SHALL BE FP3 OR (FP3).
FP

D D

FP
FP
E (FP) E
(NOTE 7)

(FP)
(FP)
(FP)
A
-

FP

FP
FP
FP

F F

BRACING CONNECTION BEAM TO BEAM CONNECTION SECTION A


(ELEVATION) (PLAN)
-

(FP)
G G
FP
FP

(NOTE 7)
FP

(FP)
(TYP)
FP

FP

(FP)

FP
(FP)

H H
FP

PEDESTAL WIDTH
(TYP) POST BASE PLATE AND BEAM TO BEAM CONNECTION
COLUMN BASE COLUMN SPLICE HANGER GUSSET PLATE BRACING
(ELEVATION) (PLAN)
CL CL CL
I I

(FP) (FP)
Owner has Owner has
FP

FP

FP

J DATE: BY: DATE: BY: J


AREA : JV COMMON NON-JV KURARAY GC ADVANCED MATERIALS CO., LTD KURARAY ADVANCED CHEMICALS(THAILAND) CO., LTD

NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF


JGC CORPORATION, JAPAN AND SHALL NOT BE TRACED, PHOTOGRAPHED,
SIZE
A1 DRAWING TITLE
STANDARD DRAWING FOR
(FP) (FP) PHOTOSTATED OR REPRODUCED IN ANY MANNER, NOR USED FOR ANY SCALE FIREPROOFING (1/2)
PURPOSE WHATEVER EXCEPT BY WRITTEN PERMISSION OF JGC CORPORATION. NONE
APPD F.ASANO
CHKD M.OOZEKI
PREP N.YOKOYAMA
OWNER DWG No.

PROJECT HARMONY
K KURARAY GC ADVANCED MATERIALS CO., LTD K
2 ISSUED FOR CONSTRUCTION 10-May-2019 KURARAY ADVANCED CHEMICALS(THAILAND) CO., LTD
1 ISSUED FOR CONSTRUCTION 05-Apr-2019
JGC CORPORATION
EXPANSION JOINT (NOTE 5) 0 ISSUED FOR APPROVAL 31-Jan-2019
COLUMN AND BEAM REV JOB CODE DWG NO REV NO
NO REVISION DESCRIPTION DATE 0-8008 D-0000-1330-075 2

DM20S19