You are on page 1of 1

KEY PLAN

PLUMBING GENERAL NOTES :


1. ALL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
B
NEW CENTRAL WASTE AREA (PHASE 1) 2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWING AND SPECIFICATION.
3. ALL PIPE PENETRATING THRU WALLS, CEILING, FLOORS SHALL BE ACOUSTICALLY-
SEALED WITH SOUND TRANSMISSION CLASS FIRE RATED MATERIALS.
4. THE CONTRACTOR SHALL PERFORM A LEAKAGE TEST OFF ALL UNDERGROUND PIPES-
PRIOR TO BACKFILLING OF SAND.
5. INSTALL ALL MATERIAL IN ACCORDANCE WITH MANUFACTURERS RECOMENDATION.

PLANT BATAKO BUILDING (R3) INCINERATOR BUILDING (R4) SG STORAGE BUILDING (R6) 6. SEE ARCHITECTURAL DRAWING FOR EXACT LOCATION AND INSTALLATION HEIGHT -
OF ALL PLUMBING FIXTURES AND EXACT BUILDING DIMENSION.
7. CONTRACTOR TO COORDINATE AND VERIFY SERVICE CONNECTIONS ON ALL FIXTURES.
8. PROVIDE CHROME - PLATE STEEL ESCUTCHEONS FOR PIPES AT WALL PENETRATIONS.
9. UNLESS OTHERWISE SPECIFIED THE MINIMUM SIZES OF ALL COLD & HOT WATER PIPES SERVING-
BV.25 BV.25 BV.25 BV.25 THE INDIVIDUAL FIXTURES SHALL BE AS FOLLOWS :
BATTERY LIMIT BATTERY LIMIT BATTERY LIMIT A). LAVATORY - 15mm DIA.
GENERAL USE GENERAL USE GENERAL USE B). SHOWER - 15mm DIA.
C). WATER CLOSED - 15mm DIA. (FLUSH TANK)
D). WATER CLOSED - 25mm DIA. (FLUSH VALVE)
D). URINAL - 20mm DIA.
F). SINK - 15mm DIA.
G). FAUCET - 15mm DIA. NOTES AND LEGEND
10. SHOP DRAWINGS SHOWING LOCATION OF PIPE SLEEVES SHALL BE SUBMITTED BEFORE CONSTRUCTION.
DN25-DW-GSP

DN25-DW-GSP

DN25-DW-GSP
- THIS DRAWING IS NOT A SHOP DRAWING
- ANY DIMENSIONS AND TECHNICAL SOLUTIONS DEPICTED ARE PURPOSE FOR
ES
DESIGN INTENT ONLY AND NEED TO BE DEVELOPED FURTHER ON CONTRACTOR
SHOP DRAWINGS AND SUBJECT TO VERIFICATION AND APPROVAL BY A/E AND
OWNER AND FIELD VERIFICATION PRIOR TO CONSTRUCTION
-THE CONTRACTOR SHALL CHECK ALL DRAWINGS, VERIFY LEVEL AND
BOX VALVE BOX VALVE BOX VALVE
DIMENSIONS ON SITE PRIOR TO COMMENCEMENT WORK HE SHALL REPORT
DN25-DW-GSP DN40-DW-GSP DISCREPANCIES IT ANY TO OWNER'S REPRESENTATIVE BEFORE
COMMENCEMENT OF WORKS
- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
- ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
B DW
GUARD HOUSE & NEW LOCKER BUILDING (PHASE II) = DOMESTIC WATER SUPPLY PIPE - MEDIUM CLASS
FUTURE CONNECTION
= BALL VALVE (BV)
= CHECK VALVE (CV)
GUARD HOUSE BUILDING (B8) AREA SLUDGE (R5) AREA LIMBAH CAIR (R5) TPS GENERAL = FLEXIBLE JOINT (FJ)
= STRAINER (STR)
DN32-DW-GSP
= GATE VALVE (GV)

DN40-DW-GSP
WM = WATER METER
BV.25 BV.25 BV.25 BV.25
GSP = GALVANIZED STEEL PIPE
BATTERY LIMIT BATTERY LIMIT
GENERAL USE GENERAL USE FC = FAUCET
BV.25 LV = LAVATORY
SK = SINK
TOILET UR = URINAL
Fix. Units QTY WC = WATER CLOSET
DN25-DW-GSP

DN32-DW-GSP
WC 1 NC = NORMALLY CLOSE
LV 1 ES = EMERGENCY SHOWER
ES ES

BOX VALVE BOX VALVE BOX VALVE


DN25-DW-GSP DN40-DW-GSP

A = REVISION MARK = REVISION CLOUD

A - ADD. NOTE FOR PHASE 1 & PHASE 2


-
-
-
- - - - - -
DN25
- - - - - -
RWT-01 - - - - - -
FRP - VOL. 5 M3 - - - - - -
DN25 B REVISION ES TS BA 13-02-2020
A FIRST ISSUED ES TS BA 03-02-2020
DRAIN

DN50-DW-GSP
NO. DESCRIPTION BY CHKD APVD DATE
EXISTING WTP 2 BUILDING

NEW LOCKER BUILDING (R2)


APPROVED BY CLIENT
DN100-RO-EXISTING DN100-RO-EXISTING
FROM EXISTING RO PUMPS TO FACTORY PLANT
DN40-DW-GSP DN25-DW-GSP
EXISTING RO PUMPS
agribusiness and food
LOCATION WTP 02

DN50-RO-EXISTING
DN50-DW-GSP

CAPACITY
HEAD 50 Meter H2O
TYPE CENTRIFUGAL END SUCTION
BV.25 BV.25
GROUP
MALE TOILET FEMALE TOILET
DN50-RO-EXISTING DN50-RO-EXISTING
Fix. Units QTY Fix. Units QTY M TO KLINIK, MINI LAB & BEA CUKAI BUILDING
UR 3 LV 1
PT. SMART Tbk.
LV 3 FC 1 TIE-IN POINT
FC 1 TO EXISTING PIPE DRAWING TITLE :
WATER SUPPLY FROM WATER TRUCK
00. GENERAL
SCHEMATIC - DOMESTIC WATER SUPPLY SYSTEM
-
SCALE : NTS FORMAT SIZE : A1
SCHEMATIC - DOMESTIC WATER SUPPLY SYSTEM PROJECT DRAWING NO. REV
SCALE : N.T.S
P-19-028 SMT-DWG-DD-ME-00-DW-6001 B -

You might also like