3.6 Have you modeled the HR as per requirement in Dwg? (TPO, MTO, Removable HR)
4.0 FRAME CONNECTION
4.1 Have you check the elevation of HBRACE in terms of BOLTS in EM connection? **
4.2 Have you checked WHITMORE in VERTICAL BRACE AND BP detail? **
4.3 Have you checked WHITMORE in HORIZONTAL BRACE AND adjacent beam connection? **
4.4 Are the correct connection inputted?
4.5
5.0 CLASH CHECK
5.1 Have you checked the clashing with the following? **
5.2 Have you checked Civil members VS PIPES? **
5.3 Have you checked Civil members VS E&I Cable Tray? **
5.4 Have you checked Civil members VS Equipment? **
5.5 Have you checked Steel members VS Foundation? **
5.6 Have you checked the HEAD ROOM Clearance? **
5.7 Are the OPENING free of any CLASH? **
5.8 Are trolley beams operation free from any obstruction?
6.0 CONDUCT “TO DO LIST”
LEGEND: OR – Originator / Engineer ALE - Asst. Lead Engineer LE - Lead Engineer TA – Technical Auditor