Gao Ge
Tsinghua University
China Railway BIM Alliance
Content
2
Content
3
Introduction
5
Beijing-Shanghai HSR
6
Harbin-Dalian HSR
7
China Railway BIM (CRBIM) Alliance
• The CRBIM was established in December 2013.
• Its purpose is to promote the application of BIM technology in the China railway field.
• Directing members:
8
Content
9
Design
(2D-based)
10
Design
Station Architecture
11
Design
Station Structure
12
Station MEP
Design 13
Tunnel
14
4-Electric integration
• Traction, communication, signal,
electricity
• Cooperative layout and simulation
15
Tunnel excavation process simulation
Simulation&Planning 16
Assembly
• Digital pre-assembly steel bridge construction
• Construction management based on the pre-
assembly modules
组装过程中的全桥模型
17
Fabrication
• Integrated manufacturing of steel beam
• Data exchange between BIM models and NC
machine tool G-code
18
Construction
• Digital construction for subgrade using BIM
• Data exchange between BIM models and construction machinery
19
Coordination
• Terrain,
alignment,
subgrade, track,
bridge, tunnel,
station
• Design check
• QTO
• Simulation
• Finite element
analysis
20
Content
21
China Railway BIM Standard
• China Railway BIM Standard is composed of three parts:
• Part 1: Railway BIM Classification Standard
• Refer to ISO 12006-2
• Was completed in December 2014.
• Part 2: Railway BIM Data Standard
• Based on ISO 16739
• A draft version was accomplished in June 2015.
• The public version was expected to be available in December 2015.
• Part 3: Railway BIM Delivery Standard
• Based on ISO 29481, started in July 2015, expected to be available in 2016.
• Led by the Third Railway Survey and Design Institute
& Tsinghua University, all direct members involved.
22
Spatial structure Assembly Physical element component
Data standard
Architecture
Property Set
System
23
Alignment Track Subgrade
Railway
Disciplines
Bridge Tunnel
27
Bridge
28
Tunnel
29
Systems of Railway
• IfcSystem
• IfcRailwaySystem
• IfcRailwaySignalSystem
• IfcRailwayDrainageSystem
• IfcRailwayElectircSystem
30
Property Set for Railway eg. Pset_TrackCommon
32
Challenges and Future work
• To continue the development of the Railway BIM standard
• Following the principles of the international standard
• Integration with the IfcAlignment, IfcRoad, IfcTunnel and IfcBridge
• Hope to contribute to the development of bSI as well as ISO standards
• To promote Railway BIM software development
• Hope the major software vendors to support the CRBIM standards
• To develop BIM software to meet the needs of the China railway
• To continue to carry out BIM applications in China
• To further explore the applications of BIM technologies in various engineering
conditions
• To develop the management system and implementation standards of Railway
BIM
33
Thanks!