Group No : 03
• On 22nd June 2022 , we had our ILE class in which we visited two different sites , the Margalla
Railway Station at I-9 , Islamabad while second one I-9 underpass piling construction area.
Objective:
• To understand the concept taught at class and their implications at industries or fields.
• To get the knowledge about different operation and functions perform at construction site.
• In recent years the Federal Govt decided the rehabilitation of Islamabad infrastructure ,
piling work at I-9 is one of them.
• Wet piling/wet bored pile and dry piling/dry bored pile are undergoing.
• Before drilling surveys are performed initially to check the level surface.
• After all such measures , pile cap is placed as funnel for filling of concrete
mixture.
• To check the depth before hardening of mixture a free-fall stone is used for that
purpose.
Pictorial representation of
piling
• Figure shows the piling cage
and bentonite chemical
Site 2: Visit to Margalla Railway Station :
• When one train is occupying a section of track other trains are not allowed to enter.
Station Master
Office
Cabins Points
• Control system give instruction to station master about signaling.
• BKFC trucks are used for loading and unloading of the ballast.
Departure signals:
• Starter signals.
• Advance starter signals.
Reception signals:
• Outer signals.
• Home signals.
• In every case the home signals down first then the starter signals downs.
Co-related topics covered in ILE:
Transportation engineering:
Structure Analysis:
Design of piling cage.
Material Engineering:
• Soil testing for evaluating strata.
• Aggregate Material for ballast.
• Compressive strength test and tensile strength test.
Application of concepts:
Driven cast-in-situ:
Stops signals
• Its purpose is to keep other trains from colliding with it and to notify that
moveable infrastructure components are in the proper place.
Shunting signals
Routing signals
• The routing signal is used to tell driver which of two or more divergent
routes are assigned to him.
Pictorial view of signals
Lever system:
• The depleting assets have led us to import spare parts due to few factories and
workshops.
Solution
• Countries like India, Bangladesh etc. are also adopting according to the world-
wide standards , but we fail to modernize our infrastructure.
Poor Infrastructure:
• Physical infrastructure have been used to their full potential and are no
longer productive, seriously disrupting the effectiveness of the work.
Consumer dissatisfaction:
• Generally, the complaints are due to the low-quality services provided,
disrespectful attitude of employees.
Integrated Signaling :
Solar trains:
• Solar can be used with trains to make them even more eco-friendly as
a form of transport.
• Solar power will help to make train travel even more sustainable.
Rail Automation: