The document is a site test report for a 6.6kV surge arrester that tests the functionality of an automatic transfer switch (ATS). The test results show that the ATS successfully switched from Incomer-1 to Incomer-2 within 6-15 seconds when Incomer-1 lost voltage, and that all circuit breakers, fuses, and bus tie components were operating properly during the transfer. Key personnel signed off to verify that the ATS test was properly conducted and witnessed.
The document is a site test report for a 6.6kV surge arrester that tests the functionality of an automatic transfer switch (ATS). The test results show that the ATS successfully switched from Incomer-1 to Incomer-2 within 6-15 seconds when Incomer-1 lost voltage, and that all circuit breakers, fuses, and bus tie components were operating properly during the transfer. Key personnel signed off to verify that the ATS test was properly conducted and witnessed.
The document is a site test report for a 6.6kV surge arrester that tests the functionality of an automatic transfer switch (ATS). The test results show that the ATS successfully switched from Incomer-1 to Incomer-2 within 6-15 seconds when Incomer-1 lost voltage, and that all circuit breakers, fuses, and bus tie components were operating properly during the transfer. Key personnel signed off to verify that the ATS test was properly conducted and witnessed.
ATS Ready ATS ON Healthy Healthy Trip Com Trip Com L-L>0.8Un CB1 ON Status CB2 ON Status PT-1 Fuse Healthy PT-2 Fuse Healthy PT-1 Fuse MCB ON PT-2 Fuse MCB ON UL-UL<0.25 Incomer-1 No fault Incomer-2 No fault Incomer-1 Current
I<0.06In Incomer-2 Current
I<0.06In Incomer-1
Voltage Lost Incomer-2
Voltage Lost ATS Ready Incomer-1 Healthy Incomer-2 Healthy Bus Tie CB2 Off Bus Tie CB2
service Position Opration Time 6-
15S ATS on Funcation Incomer-1 CB off Incomer-2 CB off