The document is a shift handover logbook for Pakse Substation covering from 08:00 to 16:00 on July 1st. It summarizes the status of transmission lines connecting the substation, daily maintenance activities, switching orders that de-energized and re-energized a transmission line, voltage and frequency readings on the main buses, and some faults detected including issues with an air chiller, silica gel colors, and a device error. The logbook is signed off by the incoming and outgoing shift operators and supervisor.
The document is a shift handover logbook for Pakse Substation covering from 08:00 to 16:00 on July 1st. It summarizes the status of transmission lines connecting the substation, daily maintenance activities, switching orders that de-energized and re-energized a transmission line, voltage and frequency readings on the main buses, and some faults detected including issues with an air chiller, silica gel colors, and a device error. The logbook is signed off by the incoming and outgoing shift operators and supervisor.
The document is a shift handover logbook for Pakse Substation covering from 08:00 to 16:00 on July 1st. It summarizes the status of transmission lines connecting the substation, daily maintenance activities, switching orders that de-energized and re-energized a transmission line, voltage and frequency readings on the main buses, and some faults detected including issues with an air chiller, silica gel colors, and a device error. The logbook is signed off by the incoming and outgoing shift operators and supervisor.
Doc No. KLIC-OPE-LGB02-01 Date: 01-Jul-21 Record time 08:00 - 16:00 Shift: 1 Name: Mr. Sengsouvanh PSE-XPXN Status MW MVar PSE-XPXN Status MW MVar Line 1 Energize De-Energize -134.16 19.82 Line 2 Energize De-Energize -134.06 19.91 PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar Line 1 Energize De-Energize 134.29 -20.20 Line 2 Energize De-Energize 134.93 -20.51 Shunt Reactor 1 Energize De-Energize Shunt Reactor 2 Energize De-Energize
CB 80112 CB 80122 CB 80132 CB 80312
Close Open Close Open Close Open Close Open
CB 80212 CB 80222 CB 80232 FUSE 603
Close Open Close Open Close Open Close Open
Service Voltage (kV) Current (A)
KW1A TR 21.6 0.80
Record Time Note
I. Transmission Line Status 08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.1 08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.2 08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.1 08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.2 II. Daily Activities 08:00 Receiving and Sending information to power house (call) 12:20 DCMS, Equipment Room, Switch yard Check (No problem) 15:00 DCMS, Equipment Room Check (No problem) 230kV Main Bus 1 230kV Main Bus 2 𝑈𝑎𝑏 = 238.8 kV 𝑈𝑎𝑏 = 238.6 kV 𝑈𝑏𝑐 = 238.1 kV 𝑈𝑏𝑐 = 238.0 kV 𝑈𝑐𝑎 = 237.9 kV 𝑈𝑐𝑎 = 237.8 kV F = 50.0 Hz F = 50.0 Hz
III. Switching Order Activities
09:56 Pakse Substation has de-Energization Pakse-XPXN Line No.1 13:23 Pakse Substation has Energization Pakse-XPXN Line No.1 IV. Fault and Alarm Event Log 08:00-16:00 1.Air chiller in control room building does not cool 08:00-16:00 2. Silica gel colors of SR2 was abnormal 08:00-16:00 3.The value of SR1 oil temperture BT2 was incorrect 08:00-16:00 4.The F-531 device of SR1&SR2 was errored V. Special Activities Don't have VI. Work Permit Activivties Don't have VII. Issue Trouble Memo Don't have VIII. Handover Activities Observe Transmission line No. 1&2 Observe DCMS
Management Notification
Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….
(Chanthachone) (Sengsouvanh) Pakse Sub Operation Supervisor Signature: ……………………………… (Chanthachone)