PSE-XPXN Status MW MVar PSE-XPXN Status MW MVar
Line 1 Energize De-Energize -134.16 19.82 Line 2 Energize De-Energize -134.06 19.91
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 134.29 -20.20 Line 2 Energize De-Energize 134.93 -20.51
Shunt Reactor 1 Energize De-Energize Shunt Reactor 2 Energize De-Energize

CB 80112 CB 80122 CB 80132 CB 80312


Close Open Close Open Close Open Close Open

CB 80212 CB 80222 CB 80232 FUSE 603


Close Open Close Open Close Open Close Open

Service Voltage (kV) Current (A)


KW1A TR 21.6 0.80

Record Time Note


I. Transmission Line Status
08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.1
08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.2
08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.1
08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.2
II. Daily Activities
08:00 Receiving and Sending information to power house (call)
12:20 DCMS, Equipment Room, Switch yard Check (No problem)
15:00 DCMS, Equipment Room Check (No problem)
230kV Main Bus 1 230kV Main Bus 2
𝑈𝑎𝑏 = 238.8 kV 𝑈𝑎𝑏 = 238.6 kV
𝑈𝑏𝑐 = 238.1 kV 𝑈𝑏𝑐 = 238.0 kV
𝑈𝑐𝑎 = 237.9 kV 𝑈𝑐𝑎 = 237.8 kV
F = 50.0 Hz F = 50.0 Hz

III. Switching Order Activities


09:56 Pakse Substation has de-Energization Pakse-XPXN Line No.1
13:23 Pakse Substation has Energization Pakse-XPXN Line No.1
IV. Fault and Alarm Event Log
08:00-16:00 1.Air chiller in control room building does not cool
08:00-16:00 2. Silica gel colors of SR2 was abnormal
08:00-16:00 3.The value of SR1 oil temperture BT2 was incorrect
08:00-16:00 4.The F-531 device of SR1&SR2 was errored
V. Special Activities
Don't have
VI. Work Permit Activivties
Don't have
VII. Issue Trouble Memo
Don't have
VIII. Handover Activities
Observe Transmission line No. 1&2
Observe DCMS

Management Notification

Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….


(Chanthachone) (Sengsouvanh)
Pakse Sub Operation Supervisor Signature: ………………………………
(Chanthachone)

You might also like