TROUBLE MEMO REPORT

Mr. Thonglone
Reported By: Reported Date: 06-Sep-2021
(Pakse substation)
Report to: Line Manager Department/Section Operation Team
Reviewed by Mr. Chantachone Doc. No. KLIC_OPE_TM_****
Approved by

 Date: 06-Sep-2021
 Unit/Facility: Transmission line during Pakse Substation to Xepian-Xenamnoy line No1&2 was
tripped by distance relay protection trip then CB 80112, 80122,80222, 80232 was tripped.
 Summary:
 Distance relay TL Pakse-Xepian line1 trip at 79.3 Km and Pakse-Xepian line2 trip at 94.3 Km
protection system worked by commanding to trip CB 80112, 80122,80222, 80232 after that Auto-
Recloser 3 pole worked by commanding CB 80122 reclosed.
 Events (time-based):
- 22:47:17 Relay General trip command
- 22:47:17 Diff.General trip
- 22:47:17 Diff.Fault Detection of I-diff High stage
- 22:47:17 87L and DDT Block CB 80222, 80232 Close
- 22:47:17 I. Trip. Sending at Prot.interface 1 phase C
- 22:47:17 OPS01HC207 Line Diff. Prot Trip
- 22:47:17 Diff.General trip
- 22:47:17 I. Trip. Received at Prot.interface 1 phase C
- 22:47:17 Block CB 80122, 80112 Close
- 22:47:17 I. Trip. Sending at Prot.interface 1 phase B
- 22:47:17 F871 Line DIFF and F211 Line DIST Prot Reclose Start
- 22:47:17 F871 Line DIFF Prot 50BF Start phase B, C
- 22:47:17 OPS01HC201 Line Diff. Prot Trip
- 22:47:17 F871 Line DIFF Prot 50BF Start phase A
- 22:47:17 F211 Line Distance and F871 Line DIFF Prot reclose Start
- 22:47:17 I. Trip. Received at Prot.interface 1 phase B
- 22:47:17 XE-NAMNOY Line 1 DIST and DIFF Prot 50BF Start Phase A, C
- 22:47:17 F871 Line Diff Prot Auto Reclose Start
- 22:47:17 XE-NAMNOY Line 1 DIST and DIFF Prot 50BF Start Phase B
- 22:47:17 DEF Teleprot Earth Fault send
- 22:47:17 Earth Fault Telep. Carrier Send Signal
- 22:47:17 Line Distance and DIFF Prot Reclose Start
- 22:47:17 XE-NAMNOY Line 1 DIST and DIFF Prot 50BF Start Phase B, C
- 22:47:17 DEF Teleprot Earth Fault Received
- 22:47:17 XE-NAMNOY Line 1 DIST and DIFF Prot 50BF Start Phase A
- 22:47:17 Block CB 80222, 80232 Close
- 22:47:17 Low Stage Earth Fault Carrier Reception and Channel2, 1
- 22:47:17 Diff.Fault Detection of I-Diff Low Stage
- 22:47:17 F211 Line DIST Prot 50BF Start Phase B
- 22:47:17 PTT Teleprot Distance Received Phase C
-
- 23:31 Call inform Power house
-

 Solution and Action:


- 01:35:35:986 Reset protection panel Line PSE-XPXN line 2 at Pakse Substation.
- 01:37:08:940 Close CB 80232
- 01:37:26:070 Close 80222 to Energization TL PSE-XPXN Line 2
 Attachment:
1. Alarm List Showed During Tripping
3.Resetting protection panel.

Reset alarm
action

Reset alarm Reset lockout


action alarm action

Note: Reset by pushing to the Lockout reset button at Protection Panel.


Then we can command to close CB on SCADA step by step.

4.Troubleshoting

Before
After

Note: After Reset protection panel Line PSE-XPXN line 2 and then we Close CB 80232, CB 80222 to
Energized PSE-XPXN Line 2 Normally.