Operation Dept.

PSE SHIFT HANDOVER LOGBOOK

Doc No. KLIC-OPE-LGB02-01


Date: 05-Jan-24 Record time 00:00-08:00
Shift: 3 Name: Mr Thonglone SIYALATH

XPXN-PSE Status MW MVar XPXN-PSE Status MW MVar


Line 1 Energize De-Energize -136.25 33.45 Line 2 Energize De-Energize -136.45 33.45

PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar


Line 1 Energize De-Energize 136.54 -34.78 Line 2 Energize De-Energize 136.70 -34.25

SHUNT REACTOR 1 Energize De-Energize 0.00 MVar SHUNT REACTOR 2 Energize De-Energize 0.00 MVar

CB 80212A DS 80215A CB 80232A DS 80235A

Close Open Close Open Close Open Close Open

CB 80112 CB 80122 CB 80132 CB 80312


Close Open Close Open Close Open Close Open
CB 80212 CB 80222 CB 80232 FUSE 601
Close Open Close Open Close Open Close Open

Service Voltage (kV) Current (A)


KW1A TR 21.24 0.9 12.33

Record Time Note


I. Transmission Line Status
00:00-08:00 Transmission line 230KV No.1 during Pakse substation to Xepian switchyard
00:00-08:00 Transmission line 230KV No.2 during Pakse substation to Xepian switchyard
00:00-08:00 Transmission line 230KV No.1 during Pakse substation to Ubon3 Substation
Normal Conditions
00:00-08:00 Transmission line 230KV No.2 during Pakse substation to Ubon3 Substation
II. Daily Activities
0:00 Receiving and Sending information to power house (call)
2:00 DCMS, Equipment Room inspection
4:00 DCMS, Equipment Room and Switch Yard inspecction
6:00 230kV Main Bus 1 230kV Main Bus 2
𝑈𝑎𝑏 = 237.0 kV 𝑈𝑎𝑏 = 237.0 kV
𝑈𝑏𝑐 = 238.0 kV 𝑈𝑏𝑐 = 238.0 kV
𝑈𝑐𝑎 = 236.0 kV 𝑈𝑐𝑎 = 236.0 kV
F = 50.0 Hz F = 50.0 Hz
III. Switching Order Activities
None

IV. Fault and Alarm Event Log


1. Analog Input 4-20 mA shows incorrectly data such as 230 kV TLS and High of Service Transformer // (Active power and Reactive power )
2. SICAM SCC event list of UPS inverter pannel No.2 is not showing data //02.12.2022
3. Air conditioner of the control room does not work

V. Special Activities
None

VI. Work Permit Activivties


No activities
VII. Issue Trouble Memo
No Issue
VIII. Handover Activities
1. Observation Scada, Protection systems, Voltage Transmission line 1&2
2. Follow to record daily record and check list

Management Notification

Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….


(Vanxai) (Thonglone )

Pakse Sub Operation Supervisor Signature: …………………………………………..


(Luelee)