Date: 14-Jan-21 Record time 8:00-16:00 Shift: 3 Name: Mr vanxai SYLAPHET XPXN-PSE Status MW MVar XPXN-PSE Status MW MVar Line 1 Energize De-Energize -82.36 36.52 Line 2 Energize De-Energize -82.57 36.17
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 82.65 -36.54 Line 2 Energize De-Energize 82.55 -36.10
Energize De-Energize Energize De-Energize
SHUNT REACTOR 1 0.00 SHUNT REACTOR 2 0.00
CB 80212A DS 80215A CB 80232A DS 80235A
Close Open Close Open Close Open Close Open
CB 80112 CB 80122 CB 80132 CB 80312
Close Open Close Open Close Open Close Open CB 80212 CB 80222 CB 80232 FUSE 603 Close Open Close Open Close Open Close Open
Service Voltage (kV) Current (A)
KW1A TR 21.14 0.6
Record Time Note
I. Transmission Line Status 8:00-16:00 Pakse Substation Energization Line1 XPXN-PSE 8:00-16:00 Pakse Substation Energization Line2 XPXN-PSE 8:00-16:00 Pakse Substation Energization Line 1 PSE-UB3 8:00-16:00 Pakse Substation Energization Line 2 PSE-UB3 II. Daily Activities 8:30 Receiving and Sending information to power house (call) 12:30 DCMS, Equipment Room Check (No problem) 15:00 DCMS, Equipment Room and Switch Yard Check (No problem) 15:30 230kV Main Bus 1 230kV Main Bus 2 𝑈𝑎𝑏 = 239.7 kV 𝑈𝑎𝑏 = 239.7 kV 𝑈𝑏𝑐 = 240.1 kV 𝑈𝑏𝑐 = 240.1 kV 𝑈𝑐𝑎 = 238.7 kV 𝑈𝑐𝑎 = 238.5 kV F = 50.00 Hz F = 50.00 Hz III. Switching Order Activities No have IV. Fault and Alarm Event Log Fault Recorder system panel start fallback mode (ongoing) V. Special Activities Inspection and checking CB counter (Finish) Checking Air conditioner A2 (Finish) VI. Work Permit Activivties No have VII. Issue Trouble Memo No have VIII. Handover Activities Observe Transmission line No. 1&2
Management Notification
Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….
Pakse Sub Operation Supervisor Signature: ………………………………