SHUNT REACTOR 1 Energize De-Energize 0.00 SHUNT REACTOR 2 Energize De-Energize 0.00
1. Analog Input 4-20 mA shows incorrectly data such as 230 kV TLS and High of Service Transformer // (Active power and Reactive power )
2. SICAM SCC event list of UPS inverter pannel No.2 is not showing data //02.12.2022
3. Air conditioner of control room does not work
V. Special Activities
None
Management Notification
Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….
(Vanxai) (Thonglone)
Pakse Sub Operation Supervisor Signature: …………………………………………..
(Vongkham)