Operation Dept.

PSE SHIFT HANDOVER LOGBOOK

Doc No. KLIC-OPE-LGB02-01


Date: 1/16/2024 Record time 16:00-24:00
Shift: 3 Name: Mr Thonglone SIYALATH

XPXN-PSE Status MW MVar XPXN-PSE Status MW MVar


Line 1 Energize De-Energize -118.58 26.58 Line 2 Energize De-Energize -119.57 26.58

PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar


Line 1 Energize De-Energize 119.80 26.58 Line 2 Energize De-Energize 119.00 26.77

SHUNT REACTOR 1 Energize De-Energize 0.00 SHUNT REACTOR 2 Energize De-Energize 0.00

CB 80212A DS 80215A CB 80232A DS 80235A

Close Open Close Open Close Open Close Open

CB 80112 CB 80122 CB 80132 CB 80312


Close Open Close Open Close Open Close Open
CB 80212 CB 80222 CB 80232 FUSE 601
Close Open Close Open Close Open Close Open

Service Voltage (kV) Current (A)


KW1A TR 21.32 0.9 12.31

Record Time Note


I. Transmission Line Status
16:00-24:00 Transmission line 230KV No.1 during Pakse substation to Xepian switchyard
Normal condition
16:00-24:00 Transmission line 230KV No.2 during Pakse substation to Xepian switchyard
16:00-24:00 Transmission line 230KV No.1 during Pakse substation to Ubon3 Substation
16:00-24:00 Transmission line 230KV No.2 during Pakse substation to Ubon3 Substation
II. Daily Activities
16:00 Receiving and Sending information to power house (call)
18:00 DCMS, Equipment Room inspection
20:00 DCMS, Equipment Room and Switch Yard inspecction
22:00 230kV Main Bus 1 230kV Main Bus 2
𝑈𝑎𝑏 = 238.0 kV 𝑈𝑎𝑏 = 238.0 kV
𝑈𝑏𝑐 = 239.0 kV 𝑈𝑏𝑐 = 239.0 kV
𝑈𝑐𝑎 = 237.0 kV 𝑈𝑐𝑎 = 237.0 kV
F = 50.0 Hz F = 50.0 Hz
III. Switching Order Activities
None

IV. Fault and Alarm Event Log


1. Analog Input 4-20 mA shows incorrectly data such as 230 kV TLS and High of Service Transformer // (Active power and Reactive power )
2. SICAM SCC event list of UPS inverter pannel No.2 is not showing data //02.12.2022
3. Air conditioner of control room does not work

V. Special Activities
No activities
VI. Work Permit Activivties
None
VII. Issue Trouble Memo
No Issue
23:55 VIII. Handover Activities
1. Observation Scada, protection systems, voltage Transmission line 1&2
2. Follow to record daily record and check list

Management Notification

Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….


(Sompong) (Thonglone)

Pakse Sub Operator admin Signature: …………………………………………..


(Luelee)