4.

1Raw Water

The raw water supply for the Power plant will be through borewells dug within the
plant premises and through Municipal water supply. This raw water will be used
after treatment as a make up for the leakage losses in the steam, boiler blow down,
cooling system, service water, etc. The design of the water treatment system will be
based on the water quality tested for the ground water collected from the site and
from Narmada river (Source for Kachcch municipal water suppy).