Professional Documents
Culture Documents
PQCT and PFD New
PQCT and PFD New
SA B C R
ISSUING COMPANY [SUPPLIER] CONFIRMATION DEPARTMENT
Part LOT CONTROL
MODEL P-17
Designation REQUIRED-YES PROCESS QUALITY CONTROL TABLE ( 1 ) GROWTH ENGINE PVT. LTD. SUNBEAM AUTO PVT. LTD.
Process diagram (Attach the A3-sized sheet for more space, if necessary.)
COMPONENT PARTS SOURCING LIST
PROCESS SEQUENCE
SOURCE
S.NO. PART NO. PART NAME SUPPLIER NAME
10 RECEIVE ALUMINIUM ALLOYS INGOTS HS-1 H & MELTING PURCHASED INHOUSE
NAMO
AKSHAY
40 CASTING (GDC)
50 BENDSAW
60 GRINDING
70 FETTLING
80 LEAKAGE TESTING
90 FINAL INSPECTION
++++++++
100 PDIR
110 DESPATCH
Process diagram symbol: In accordance with JIS Z8206 (Compound symbol: Indicate primary job on outside, and secondary job inside.)
○
Executing quality
○ Processing □ Quantity inspection Intersection of flow line
◇ inspection while mainly
executing processing 1
S-: Safety Characteristics, A-: Critical Characteristics, B & C-: General characteristic, R-: Regulatry Legal characteristics
0
1
Page 2 of 18
77 1 2 3 4 5 6 7
COMPANY NAME:- GROWTH ENGINE PVT.LTD.
Every lot /
Copper 2.77 - 3.20 Every 3
month
Iron 0.6
Nickel 0.1
Manganese 0.2
Receive
10 Aluminium Alloy Zinc 0.20 - 0.40
Ingots & Melting
Titanium 0.2
Lead 0.1
Tin 0.1
Chromium 0.1
Aluminium Balance
SUP Hand
Temp. of alloy 760 ±100C Every heat Register 01
OPR Pyrometer
Metal cleaning Metal should be Clean OPR Visual Check Every Heat -
Hand
CHECK SHEET
3 Temp. of metal (725 ± 15)o C OPR Pyrometer Every heat GEPL:PRDC:02
/Dip type TC
Hand
Pyrometer/ CHECK SHEET
1 Temp. of metal 725±15°C OPR direct dip type
Every heat GEPL:PRDC:02
TC
2 Hyd. Pr 45± 10 Kgf/ Cm-2 OPR Pressure Gauge 24 hrs check sheet
CHECK
SHEET
6 CORE DEPTH 253.5- 1.0 INSPECTOR DEPTH VERNIER Every shift
GEPL:QA
C:01
AXLE BOSS
9 43.0±0.20 INSPECTOR VERNIER Every shift
WIDTH
CHECK
SHEET
1 Flash removal No extra material INSPECTOR Visually Each piece
GEPL:
60 Grinding QAG:01
REGISTER
70 Fettling 1 Extra flash No extra flashes INSPECTOR Visually Each piece
02
REGISTER
1 Free from leakage No leakage OPR Visually Each piece
03
80 Leakage Testing
Pressure
1 Air pressure 6-7 Kgf/cm2 OPR Each piece
gauge
CHECK
SHEET
90 Final Inspection 1 Casting Quality No visual defect as per master sample INSPECTOR Visually Each piece GEPL:QAF:
01
CORE PIN
1 253.50 -1.0 INSPECTOR DEPTH VERNIER 5 piece
DEPTH
OIL SEAL
2 23.0 -0.50 INSPECTOR DEPTH VERNIER 5 piece
FACING
F/ Boss DIAØ
3 15 -0.50 INSPECTOR DIGITAL VERNIER 5 piece
(RH)
UNDER
8 NO UNDER CUT INSPECTOR VISUAL 5 piece
GRINDING
Shipment to be made as
1 Safe shippment SUP Visually Each piece
per packing standard
110 Despatch -
350,500,450 SET/PER
2 Packing process OPR Visually Each piece
TROLLY
Insulat Exhaust
Protectio A
ion gas Identificatio Denotes- SAFETY
Complete vehilce's failure TURNING FUNCTION Stopping n CRITICAL
mode classification:-
1 RUNNING FUNCTION IS LOST 2 IS LOST
3 function failure 4 Gaurding function failure 5 functio 6 function 7 control 8 n function PROCESS/PARAMET PROCESS/PARAMETER
n function failure ER
failure S
failure failure
PAGE 1/1
SA B C R
ISSUING COMPANY [SUPPLIER] CONFIRMATION DEPARTMENT
Part LOT CONTROL
MODEL KWAG
Designation REQUIRED-YES PROCESS QUALITY CONTROL TABLE ( 1 ) GROWTH ENGINE PVT. LTD. SUNBEAM AUTO PVT. LTD.
Process diagram (Attach the A3-sized sheet for more space, if necessary.)
COMPONENT PARTS SOURCING LIST
PROCESS SEQUENCE
SOURCE
S.NO. PART NO. PART NAME SUPPLIER NAME
10 RECEIVE ALUMINIUM ALLOYS INGOTS HS-1 H & MELTING PURCHASED INHOUSE
NAMO
AKSHAY
40 CASTING (GDC)
50 BENDSAW
60 GRINDING
70 FETTLING
80 LEAKAGE TESTING
90 FINAL INSPECTION
++++++++
100 PDIR
110 DESPATCH
Process diagram symbol: In accordance with JIS Z8206 (Compound symbol: Indicate primary job on outside, and secondary job inside.)
○
Executing quality
○ Processing □ Quantity inspection Intersection of flow line
◇ inspection while mainly
executing processing
S-: Safety Characteristics, A-: Critical Characteristics, B & C-: General characteristic, R-: Regulatry Legal characteristics
0
1
Page 6 of 18
77 1 2 3 4 5 6 7
COMPANY NAME:- GROWTH ENGINE PVT.LTD.
Every lot /
Copper 2.77 - 3.20 Every 3
month
Iron 0.6
Nickel 0.1
Manganese 0.2
Receive
10 Aluminium Alloy Zinc 0.20 - 0.40
Ingots & Melting
Titanium 0.2
Lead 0.1
Tin 0.1
Chromium 0.1
Aluminium Balance
SUP Hand
Temp. of alloy 760 ±100C Every Heat Register 01
OPR Pyrometer
Metal cleaning Metal should be Clean OPR Visual Check Every Heat -
Hand
CHECK SHEET
3 Temp. of metal (725 ± 15)o C OPR Pyrometer Every heat GEPL:PRDC:02
/Dip type TC
Hand
Pyrometer/ CHECK SHEET
1 Temp. of metal 725±15°C OPR direct dip type
Every heat GEPL:PRDC:02
TC
2 Hyd. Pr 45± 10 Kgf/ Cm-2 OPR Pressure Gauge 24 hrs check sheet
9 Axle Pad Width (LH) 27.0 +0.20 INSPECTOR VERNIER Every shift
11 Axle Boss Width (RH) 46.0 +0.20 INSPECTOR VERNIER Every shift
CHECK
SHEET
1 Flash removal No extra material OPR Visually Each piece
GEPL:
60 Grinding QAG:01
70 Fettling 1 Extra flash No extra flashes OPR Visually Each piece Register 02
CHECK
SHEET
90 Final Inspection 1 Casting Quality No visual defect as per master sample INSPECTOR Visually Each piece GEPL:QAF:
01
CORE PIN
1 253.50 (-1.0) INSPECTOR DEPTH VERNIER 5 piece
DEPTH
OIL SEAL
2 21.50 -0.5 INSPECTOR DEPTH VERNIER 5 piece
FACING
UNDER
7 NO UNDER CUT INSPECTOR VISUAL 5 piece
GRINDING
Shipment to be made as
1 Safe shippment SUP Visually Each piece
per packing standard
110 Despatch -
Insulat Exhaust
Protectio A
ion gas Identificatio Denotes- SAFETY
Complete vehilce's failure TURNING FUNCTION Stopping n CRITICAL
mode classification:-
1 RUNNING FUNCTION IS LOST 2 IS LOST
3 function failure 4 Gaurding function failure 5 functio 6 function 7 control 8 n function PROCESS/PARAMET PROCESS/PARAMETER
n function failure ER
failure S
failure failure
PAGE 1/1
SA B C R
ISSUING COMPANY [SUPPLIER] CONFIRMATION DEPARTMENT
Part LOT CONTROL
MODEL P-90
Designation REQUIRED-YES PROCESS QUALITY CONTROL TABLE ( 1 ) GROWTH ENGINE PVT. LTD. SUNBEAM AUTO PVT. LTD.
Process diagram (Attach the A3-sized sheet for more space, if necessary.)
COMPONENT PARTS SOURCING LIST
PROCESS SEQUENCE
SOURCE
S.NO. PART NO. PART NAME SUPPLIER NAME
10 RECEIVE ALUMINIUM ALLOYS INGOTS HS-1 H & MELTING PURCHASED INHOUSE
NAMO
AKSHAY
40 CASTING (GDC)
50 BENDSAW
60 GRINDING
70 FETTLING
80 LEAKAGE TESTING
90 FINAL INSPECTION
++++++++
100 PDIR
110 DESPATCH
Process diagram symbol: In accordance with JIS Z8206 (Compound symbol: Indicate primary job on outside, and secondary job inside.)
○
Executing quality
○ Processing □ Quantity inspection Intersection of flow line
◇ inspection while mainly
executing processing
S-: Safety Characteristics, A-: Critical Characteristics, B & C-: General characteristic, R-: Regulatry Legal characteristics
0
1
Page 11 of 18
77 1 2 3 4 5 6 7
COMPANY NAME:- GROWTH ENGINE PVT.LTD.
Every lot /
Copper 2.77 - 3.20 Every 3
month
Iron 0.6
Nickel 0.1
Manganese 0.2
Receive
10 Aluminium Alloy Zinc 0.20 - 0.40
Ingots & Melting
Titanium 0.2
Lead 0.1
Tin 0.1
Chromium 0.1
Aluminium Balance
SUP Hand
Temp. of alloy 760 ±100C Every heat Register 01
OPR Pyrometer
Metal cleaning Metal should be Clean OPR Visual Check Every heat -
Hand
CHECK SHEET
3 Temp. of metal (725 ± 15)o C OPR Pyrometer Every HEAT GEPL:PRDC:02
/Dip type TC
Hand
Pyrometer/ CHECK SHEET
1 Temp. of metal 725±15°C OPR direct dip type
Every heat GEPL:PRDC:02
TC
2 Hyd. Pr 45± 10 Kgf/ Cm-2 OPR Pressure Gauge 24 hrs check sheet
CHECK
SHEET
7 WIDTH RH 23.5+0.5 INSPECTOR VERNIER Every shift
GEPL:QA
C:01
9 Axle Pad Width (LH) 27.0 +0.20 INSPECTOR VERNIER Every shift
AXLE BOSS
10 46.0+0.20 INSPECTOR VERNIER Every shift
WIDTH RH
DRUM LOCATOR
11 14.5-14.8 INSPECTOR VERNIER Every shift
SIZE
CHECK
SHEET
1 Flash removal No extra material OPR Visually Each piece
GEPL:
60 Grinding QAG:01
70 Fettling 1 Extra flash No extra flashes OPR Visually Each piece Register 02
CHECK
SHEET
90 Final Inspection 1 Casting Quality No visual defect as per master sample INSPECTOR Visually Each piece GEPL:QAF:
01
CORE PIN
1 253.50 (-1.0) INSPECTOR DEPTH VERNIER 5 piece
DEPTH
OIL SEAL
2 21.50 -0.5 INSPECTOR DEPTH VERNIER 5 piece
FACING
UNDER
7 NO UNDER CUT INSPECTOR VISUAL 5 piece
GRINDING
Shipment to be made as
1 Safe shippment SUP Visually Each piece
per packing standard
110 Despatch -
Insulat Exhaust
Protectio A
ion gas Identificatio Denotes- SAFETY
Complete vehilce's failure TURNING FUNCTION Stopping n CRITICAL
mode classification:-
1 RUNNING FUNCTION IS LOST 2 IS LOST
3 function failure 4 Gaurding function failure 5 functio 6 function 7 control 8 n function PROCESS/PARAMET PROCESS/PARAMETER
n function ER
failure
failure S
failure failure
PAGE 1/1
SA B C R
ISSUING COMPANY [SUPPLIER] CONFIRMATION DEPARTMENT
Part LOT CONTROL
MODEL KTEA
Designation REQUIRED-YES PROCESS QUALITY CONTROL TABLE ( 1 ) GROWTH ENGINE PVT. LTD. SUNBEAM AUTO PVT. LTD.
Process diagram (Attach the A3-sized sheet for more space, if necessary.)
COMPONENT PARTS SOURCING LIST
PROCESS SEQUENCE
SOURCE
S.NO. PART NO. PART NAME SUPPLIER NAME
10 RECEIVE ALUMINIUM ALLOYS INGOTS HS-1 H & MELTING PURCHASED INHOUSE
NAMO
AKSHAY
40 CASTING (GDC)
50 BENDSAW
60 GRINDING
70 FETTLING
80 LEAKAGE TESTING
90 FINAL INSPECTION
++++++++
100 PDIR
110 DESPATCH
Process diagram symbol: In accordance with JIS Z8206 (Compound symbol: Indicate primary job on outside, and secondary job inside.)
○
Executing quality
○ Processing □ Quantity inspection Intersection of flow line
◇ inspection while mainly
executing processing
S-: Safety Characteristics, A-: Critical Characteristics, B & C-: General characteristic, R-: Regulatry Legal characteristics
0
1
Page 15 of 18
77 1 2 3 4 5 6 7
COMPANY NAME:- GROWTH ENGINE PVT.LTD.
Every lot /
Copper 2.77 - 3.20 Every 3
month
Iron 0.6
Nickel 0.1
Manganese 0.2
Receive
10 Aluminium Alloy Zinc 0.20 - 0.40
Ingots & Melting
Titanium 0.2
Lead 0.1
Tin 0.1
Chromium 0.1
Aluminium Balance
SUP Hand
Temp. of alloy 760 ±100C Every Heat Register 01
OPR Pyrometer
Metal cleaning Metal should be Clean OPR Visual Check Every Heat -
Metal treatment
30
in H/FURNACE
Page 16 of 18
Hand
CHECK SHEET
3 Temp. of metal (725 ± 15)o C OPR Pyrometer Every heat GEPL:PRDC:02
/Dip type TC
Hand
Pyrometer/ CHECK SHEET
1 Temp. of metal 725±15°C OPR direct dip type
Every heat GEPL:PRDC:02
TC
2 Hyd. Pr 45± 10 Kgf/ Cm-2 OPR Pressure Gauge 24 hrs check sheet
CHECK
Width - LH 25.0 SHEET
9 INSPECTOR VERNIER Every shift
GEPL:QA
C:01
CHECK
SHEET
1 Flash removal No extra material OPR Visually Each piece
GEPL:
60 Grinding QAG:01
1100-1200 Check sheet
1 Condition of Belt change the belt OPR By production
pcs GEPL:PRDG:01
70 Fettling 1 Extra flash No extra flashes OPR Visually Each piece Register 02
CHECK
SHEET
90 Final Inspection 1 Casting Quality No visual defect as per master sample INSPECTOR Visually Each piece GEPL:QAF:
01
CORE PIN
1 289-0.30 INSPECTOR DEPTH VERNIER 5 piece
DEPTH
OIL SEAL
2 26 INSPECTOR DEPTH VERNIER 5 piece
FACING
UNDER
7 NO UNDER CUT INSPECTOR VISUAL 5 piece
GRINDING
Shipment to be made as
1 Safe shippment SUP Visually Each piece
per packing standard
110 Despatch -
550,500,400 SET/PER
2 Packing process OPR Visually Each piece
TROLLY
Insulat Exhaust
Protectio A
ion gas Identificatio Denotes- SAFETY
Complete vehilce's failure TURNING FUNCTION Stopping n CRITICAL
mode classification:-
1 RUNNING FUNCTION IS LOST 2 IS LOST
3 function failure 4 Gaurding function failure 5 functio 6 function 7 control 8 n function PROCESS/PARAMET PROCESS/PARAMETER
n function ER
failure
failure S
failure failure