You are on page 1of 3

HAZARD CHECKLIST and PRODUCTION RISK ASSESSMENT

PRODUCTION COMPANY

PRODUCTION TITLE Solarise

PRODUCER Costa Macrides

CREW Costa Macrides, Bo Tavner, Man

FILMING LOCATION Brit Bar

ACTIVITY Filming

DATE TIME
START FILMING 13/5/22 6pm

FINISH FILMING 13/5/22 7pm

CONTACT DETAILS 07897652719

HAZARDS 
1 Audience or Public Safety X
2 Cables
3 Camera Cranes / Dolly / Slider / Drones
4 Covid - 19 X
5 Derelict Buildings
6 Electricity
7 Fire - Flammable materials etc
8 Hazardous Terrain - Slipping / Tripping / Falling
9 Noise / Sound levels
10 Medical Conditions – Allergies / Health problems etc
11 Physical Exertion
12 Public Transport X
13 Stunts / Dangerous activities
14 Theft of Equipment X
15 Weapons – Prop Guns / Knives / Swords etc
16 Weather Conditions - Hot / Cold / Rainy / Windy / Snow etc X
17 Working with Animals
18 Working with Children
19 Working with Disabled / Elderly
20 Working at Night X
21 Working on or near Water
22 Vehicle safety
22 Other -

PRODUCTION RISK ASSESSMENT Sheet 1 of 2

HAZARD IDENTIFIED PEOPLE AT RISK RISK CONTROL WHO’S


LEVEL MEASURES RESPONSIBLE
HML

Audience or Public Safety Everyone L Ensuring that the public are not Everyone
endangered by any of our acts,
as in the scene it’s only a slow
dance it should be okay.

Covid-19 Everyone M Wearing masks, sanitising, and Everyone


remaining socially distant.

Public Transport Everyone L Making sure all crew are getting Everyone
safe public transport

Theft of Equipment Camera Operator M It is unlikely, however we will / Costa Macrides


need to keep an eye on Camera Operator
equipment at all times.
Weather Everyone L While it is not predicted to be Everyone
raining, if it is we will ensure that
all crew have adequate shelter
and making sure no one slips
and hurts themselves.

PRODUCTION RISK ASSESSMENT Sheet 2 of 2

HAZARD IDENTIFIED PEOPLE AT RISK RISK CONTROL WHO’S RESPONSIBLE


LEVEL MEASURES
HML

Working at Night Everyone M We will stay in populated Costa Macrides /


areas so we are not left Producer
vulnerable in the dark.

I have read the above and I am happy that:

 It constitutes a proper and adequate risk assessment in respect of the programme


activity and that control measures identified are sufficient to control the risks.
 Adequate measures are in place to communicate the risk assessment findings and to
co-ordinate the safety arrangements of all those affected.
 Covid-19 protocols have been considered and are in-line with the latest government
advice.

Signed:
Producer

Date:

Signed:
Tutor or Technician

You might also like