We are ‘HERE’
2
Dermaga Muara Jati I - III : 603 M / -5,5 sd -6 MLWs Lp. Linggarjati : 5.600 M
GUDANG
Dermaga Linggar Jati I -II : 171 M / -4,5 MLWs 2
Gudang Muarajati : 4.000 M
Dermaga Pelita I - III : 98 M / -5,5 MLWs 2
Gudang 101 : 1.806 M
Kade Khusus Pelra : 150 M / -2 MLWs : 1.500 M
2
Gudang 102
2
Total Panjang Dermaga : 1,201 M Gudang 103 : 306 M
2
Gudang 104 : 1.050 M
2
Gudang Terbuka Pelra : 1.200 M
1.600
2.000.000 1.400
1.200
1.500.000
1.000
800
1.000.000
600
500.000 400
200
- -
s/d Juli s/d Juli
2013 2014 2015 2016 2013 2014 2015 2016
2017 2017
GT 1.974.9 2.139.0 1.987.1 1.048.8 1.296.7 UNIT 1.407 1.536 1.329 788 934
3 Biggest Animal Feed Factory in Cirebon have average production 1.000.000 tonnes
1 annually, currently it is unloaded at Ciwandan dan Cigadeng Port in Banten
2 Fertilizer company around Cirebon have average production up to 50.000 tonnes annually
More than 20 textile company and other industries moved from Bandung, Jakata, and
3 Tangerang to Cirebon-Indramayu-Majalengka-Kuningan (CIAYUMAJAKUNING)
PKN
METROPOLITAN
BODEBEK
Kawasan
Industri
PKN
METRO
PKN CIREBON
PKW METRO
PELABUHAN BANDUNG
RATU
PKWp
RANCA
BUAYA PKNp
PANGANDA
RAN
Economic Growth
Strategic Region
(agro Ciledug
KABUPATEN KUNINGAN
Cirebon District Strategic Region) 10
Region Plan
(KSK Cirebon) Sumber : BAPPEDA Kabupaten Cirebon
Port of Cirebon
DLKR/DLKP Pelabuhan Cirebon
11
Port of Cirebon Development Plan
Fairway Developmen Plan
before -5.5mlws to be -12mlws
DATA SURVEI ARUS DAN
GELOMBANG
Pelabuhan
Cirebon
Gugusan
karang
CIREBON Palung
Alur Eksisting
BREBES
The development of Deep Sea Port that is integrated with Industrial estate to
accommodate the cargo throughput growth, industrial estate development, and potential
hinterland of Cirebon Port.
Informasi Proyek :
Project Information
IRR : 11,2 %
Capital Expenditure: Rp 8,9 Triliun; Phase One: Rp 3,8 Triliun