NOTES
1. All dimensions are in mm.
2. Drawings are developed based upon existing site C1
conditions. The crack stitching is to be carried out C1 C1
according to site conditions at the time. 500 +201
500
3. Structural cracks should be stitched with SS rod 551.5705
870.0000 1045.0000 900.0000
1000
before carrying out crack stitching using SS rods. 900.0000
D3 2014.1275
+184
5. In case of required rod lengths higher than
1000mm, minimum overlap between
corresponding SS rods should be 400mm.
C2
2819.6329
C2
1280.0000 1020.0000 515.0000
548.4295
C4
+195 +174
1000
448.4295
500 C6
500
PROPOSED C5 D2
SS ROD 10Ø
500
+124
500
PLINTH HIGHLIGHTING PROPOSED
CRACK STITCHING
ROOM 2 PLAN W4
NOT TO SCALE -495 -523 -524
HIGHLIGHTING THE
SOUTH WALL WITH
C1
CRACKS 551.5705
870.0000 1045.0000
+201
900.0000
900.0000
D3 ROOM 2 2014.1275
+184
2819.6329
548.4295
C4
W2 +195 +174
448.4295
C6
D2
+105
200 (min.) C5
C3
+170 +157 +141
+124
180.0000 1020.0000 1850.0000 900.0000 600.0000
4550.0000
1700.0000
1000
+142
PROPOSED PROPOSED
2990.0000
4500.0000 4500.0000
+69
OF BRICK OF BRICK +158
+125
MASONRY 1000 MASONRY 600.0000
T1
500
+130
THE EXTERIOR THE INTERIOR 910.0000
4550.0000
COURSES COURSES
1320.0000 370.0000
+100
5550.0000
FL
PROPOSED CRACK STITCHING (C1 , C2 & C3) - PROPOSED CRACK STITCHING (C4) - KEY PLAN HIGHLIGHTING THE STRUCTURAL CRACKS
SOUTH WALL - INTERIOR (ROOM 1 AND ROOM 2) SOUTH WALL - EXTERIOR NOT TO SCALE
DATE: SCALE:
PROJECT: INTERVENTION DRAWINGS 07.02.2022 0M 0.5