EXTERNAL DIMENSIONS

MEES22K009
Note 1.Please refer to the next page for information regarding necessary
spacing around the unit and foundation work.
2.The detachable leg can be removed at site.

740
3.At brazing of pipes, wrap the refrigerant service valve

600=150×4
2×5-ø4.6 Hole with wet cloth and keep the temperature of refrigerant

150
(Make hole at the plastic fan guard service valve under 120°C.
for snow hood attachment)
<Snow hood attachment hole>
19.5 881 19.5

70
920
Top view
Discharge air
2. EXTERNAL DIMENSIONS

303
Connecting pipe specifications
Diameter
Model Refrigerant pipe Service valve
Liquid Gas Liquid Gas
P200 ø9.52 Brazed
Intake Intake Intake Intake ø9.52 Brazed
PUHY-P200, 250, 300YNW-A2 (-BS)

air air air air P250 ø9.52 ø22.2


(ø12.7 Brazed) *1,*3 ø22.2 Brazed
ø9.52 Brazed
P300
0000006778.BOOK 29 ページ 2022年5月24日 火曜日 午後3時19分

(ø12.7 Brazed) *1,*2,*4


Service

1798
1858
panel *1 Connect the refrigerant pipe to the service valve
Refrigerant according to the Installation Manual.

1495
service valve *2 Indicates dimensions and connection specifications
<liquid> Control box Control box
(INV Box) in the case the unit is used in combination with
Refrigerant (MAIN Box) other outdoor units.
service valve
<gas> 7 4 3 *3 Furthest piping length (OU from IU)•90m
1
*4 Furthest piping length (OU from IU)•40m

84

35
116
110
125

71
56 20 20 56 Sling hole 132

90
54 592 54 Detachable leg 125 148 207

(60)
(60)
(front and back, 2 points) 256 NO. Usage Specifications
Rear view Left side view Note 2* Front view 1 Front through hole 148 × 84 Knockout hole
For pipes
2 Bottom through hole 150 × 94 Knockout hole
128 150 216 3 Front through hole ø65 or ø40 Knockout hole
243 172 4 Front through hole ø52 or ø27 Knockout hole
For wires
5 Bottom through hole ø65 Knockout hole
29.5

79
160 152 110

181
5

166
6 Bottom through hole ø52 Knockout hole
7 Front through hole ø34 Knockout hole
For transmission cables

198
185

8 Bottom through hole ø34 Knockout hole

2 6

94
8
Refrigerant
service valve
(740)

<liquid>
Refrigerant
681(678~684)
(Mounting pitch)

service valve
<gas>
2×2-14×31 Oval hole
2×2-14×20 Oval hole(without detachable leg) 80 760 80
29.5

(Mounting pitch)
Bottom view
Unit: mm
Y-Series

29
PUHY-P-Y(S)NW-A2
PUHY-P-Y(S)NW-A2

1.Required space around the unit Ɣ,QFDVHRIFROOHFWLYHLQVWDOODWLRQ

MEES22K009
1 When multiple units are installed adjacent to each other, secure enough space to allow
Ɣ,QFDVHRIVLQJOHLQVWDOODWLRQ for air circulation and walkway between groups of units as shown in the figures below.
1 Secure enough space around the unit as shown in the figure below.
2 At least two sides must be left open.
· With a space of at least · With a space of at least
300mm to the wall on 100mm to the wall on 3 As with the single installation, add the height that exceeds the height limit<h>
the back of the unit the back of the unit to the figures that are marked with an asterisk.
,IWKHUHLVDZDOODWERWKWKHIURQWDQGWKHUHDURIWKHXQLWLQVWDOOXSWRVL[XQLWV
consecutively in the side direction and provide a space of 1000mm or more as inlet space/
passage space for each six units.
Front
Front

450 min.* 100 min.*


Wall <H> <To be left open>
Wall <H>

450 min.* 300 min.*


300 min.*
100 min.*
2. EXTERNAL DIMENSIONS

15 min.* 15 min.* 50 min.* 50 min.*

Front
Front
<Top view> <Top view> Front
<Unit:mm> Front

Wall <H>
Wall <H>

Front
2 When the height of the walls on the front, back or on the sides<H>

<To be left open>


<To be left open>
<To be left open>
<To be left open>
exceeds the wall height limit as defined below Wall <H>
add the height that exceeds the height limit <h> to the figures that 30 min. Wall <H> 100 min. 450 min.* 450 min. 450 min. 100 min.*
PUHY-P200, 250, 300YNW-A2 (-BS)

450 min.*
are marked with an asterisk.

450 min.*
<To be left open>

h
h
<Wall height limit> Front : Up to the unit height
Wall <H> Wall <H>

300 min.*
300 min.*

Back : Up to the unit height Wall <H>

15 min.*
0000006778.BOOK 30 ページ 2022年5月24日 火曜日 午後3時19分

H
H
Side : Up to the unit height

Front

Unit height
Unit height
Front
Front
Front
Front Front
900 min.

900 min.
<Side view>
450 min. 450 min.

<To be left open>


<To be left open>
<To be left open>

2.Foundation work
<To be left open>
1 Take into consideration the surface strength, water drainage route, Wall <H>
piping route, and wiring route when preparing the installation site. 1000 min.* <Unit:mm>
300 min.*

30mm max.
<Note that the drain water comes out of the unit during operation.>
2 Build the foundation in such way that the corner of the installation leg is
securely supported as shown in the right figure.(Fig.A,B)
M10 anchor bolt
When using a rubber isolating cushion, please ensure it is large enough
<field supply required>
to cover the entire width of each of the unit's legs.
3 The protrusion length of the anchor bolt must not exceed 30mm.(Fig.A,B) Fig.A (without detachable legs) Detachable leg
4 Use four fixing plates as shown in the right figure <field supply required> Fixing plate Fixing plate
<field supply required> <field supply required>
when using M12 hole-in anchor bolts <field supply required>.(Fig.C,D)
5 To prevent small animals and water and snow from entering the unit and damaging its parts,
30mm max.
close the gap around the edges of through holes for pipes and wires with Detachable leg Fig.C (without detachable legs) Fig.D (with detachable legs)
filler plates <field supply required>.
6 When the pipes or cables are routed at the bottom of the unit,
make sure that the through hole at the base of the unit does not get blocked M10 anchor bolt
with the installation base. <field supply required>
5HIHUWRWKH,QVWDOODWLRQ0DQXDOZKHQLQVWDOOLQJXQLWVRQDQLQVWDOODWLRQEDVH
Fig.B (with detachable legs)
Unit: mm
Y-Series

30