INDEX
1 GLOSARY …................................................................................. 3
2 EXECUTIVE SUMMARY …................................................................................. 4
3 QUARTERLY RESULTS
3.1 Quaterly performance …......................................................... 5
3.2 Inception to date performance …......................................................... 5
4 ANUAL RESULTS
4.1 Energy meter vs monthly reference (kWh) …......................................................... 8
4.2 Monthly OPR / IPR, results EPC references …......................................................... 8
5 AVAILABLE CALCULATIONS …................................................................................. 9
6 SUMMARY OF ACTUAL SERVICES PERFORMED
6.1 Summary - System losses …......................................................... 12
6.2 Summary - Preventive & Corrective actions …......................................................... 15
6.3 Preventive maintenance schedule …......................................................... 17
7 SUMMARY OF MATERIAL SAFETY ISSUES/CONCERNS
7.1 Organization chart …......................................................... 23
7.2 O&M Staff …......................................................... 23
7.3 Quarterly O&M Man-hours …......................................................... 23
7.4 Quarterly incidents information …......................................................... 24
7.5 HSE Incident Summary …......................................................... 24
8 ANNEXS
8.1 Summary of external failures …......................................................... 26
8.2 Summary manual curtailments …......................................................... 27
8.3 Summary of hourly power injection …......................................................... 28
8.4 Summary of insolation …......................................................... 31
8.5 Summary of module temperature …......................................................... 34
8.6 Summary Spare Parts …......................................................... 37
1 GLOSARY
SC Substantial Completion
PR Performance Ratio
OPR Operating Performance Ratio
IPR Investment Performance Ratio
WPR Weather Performance Ratio
FM Force Majeure
HAMA Hours of acceptable maintenance activities
HUNA Hours of unavailability
HPER Period hours
2 EXECUTIVE SUMARY
During the third quarter of 2020, Maria Elena's energy production was 40,7 GWh; 6,7% less than expected for the
quarter. Part of the energy gas lost by lack of generation in CT26, lack of cleaning which just compensante at this
stage and at least 500 PV modules which are being replaced and block string current.
CT26 transformer installation was delayed while COVID19 reported were extremely high in Calama and Maria Elena.
The replacement is programend to November 20th.
PV module replacement is ongoing, so far maintain its schedule to be ready by December 15th.
In the EHS sector, by the end of September all teams are available and working under COVID19 protocols.
A cleanning process is planified by october first with Greentech, usual provider.
3 QUARTELY RESULTS
Actual Expected
Net Generation (KWh) 61,866,340 59,946,854
Performance Ratio (%) 78.0% 75.6%
Yield (KWh/KWp) 850 823
Irradiation (KWh/m2) 1089 1089
Availability (%) 99.1% 99.30%
PR actual
Insolation Insolation (Irr>75
Year Month raw reference Energy Actual Energy Reference PR actual W/m2 PR Ref. OPR IPR WPR
kwh/m2 kwh/m2 (kWh) (kWh) without FM
events)
2014 Dec 380.5 372.4 20,436,820 21,158,390 74.1% 78.5% 94.4% 96.6% 102.2%
2015 Jan 344.5 350.7 17,587,285 19,925,477 74.8% 78.5% 95.3% 88.3% 98.2%
2015 Feb 293.6 304.9 15,901,459 17,301,445 76.3% 78.4% 97.3% 91.9% 96.3%
2015 Mar 282.0 307.3 14,552,699 17,547,718 74.7% 78.9% 94.7% 82.9% 91.8%
2015 Apr 256.1 265.0 14,248,756 15,379,091 76.8% 80.2% 95.8% 92.7% 96.7%
2015 May 225.3 229.6 13,016,981 13,472,728 79.8% 81.1% 98.4% 96.6% 98.1%
2015 Jun 197.2 199.0 11,317,681 11,876,756 79.5% 82.5% 96.4% 95.3% 99.1%
2015 Jul 213.8 214.5 12,477,014 12,709,620 80.6% 81.9% 98.4% 98.2% 99.7%
2015 Aug 242.2 257.4 13,938,926 15,048,682 79.6% 80.8% 98.5% 92.6% 94.1%
2015 Sep 302.1 297.0 16,970,445 17,023,396 77.8% 79.2% 98.2% 99.7% 101.7%
2015 Oct 330.2 352.7 17,495,679 19,963,299 75.8% 78.2% 96.9% 87.6% 93.6%
2015 Nov 360.0 363.5 19,333,460 20,471,678 75.9% 77.8% 97.6% 94.4% 99.0%
2015 Dec 374.8 372.4 16,186,527 21,052,510 72.2% 78.1% 92.4% 76.9% 100.6%
PR actual
Insolation Insolation (Irr>75
Year Month raw reference Energy Actual Energy Reference PR actual W/m2 PR OPR IPR WPR
kwh/m2 kwh/m2 (kWh) (kWh) without FM Reference
events)
2016 Jan 366.9 350.7 19,662,487 19,825,725 74.0% 78.1% 94.8% 99.2% 104.6%
2016 Feb 307.2 304.9 16,372,511 17,214,793 73.7% 78.0% 94.5% 95.1% 100.8%
2016 Mar 314.6 307.3 17,592,218 17,459,796 77.2% 78.5% 98.3% 100.8% 102.4%
2016 Apr 248.5 265.0 13,752,211 15,450,306 76.5% 80.6% 94.9% 89.0% 93.8%
2016 May 220.0 229.6 12,603,172 13,543,458 79.2% 81.5% 97.2% 93.1% 95.8%
2016 Jun 197.7 199.0 11,193,567 11,956,628 78.2% 83.0% 94.2% 93.6% 99.4%
2016 Jul 214.0 214.5 12,191,373 12,645,833 78.9% 81.5% 96.8% 96.4% 99.8%
2016 Aug 263.8 257.4 14,750,116 14,973,124 77.6% 80.4% 96.5% 98.5% 102.5%
2016 Sep 297.1 297.0 16,754,994 16,937,887 78.5% 78.8% 99.6% 98.9% 100.0%
2016 Oct 339.3 352.7 19,256,232 19,862,981 78.5% 77.4% 101.4% 96.9% 96.2%
2016 Nov 344.2 363.5 19,396,467 20,368,762 77.4% 77.0% 100.5% 95.2% 94.7%
2016 Dec 351.8 372.4 19,956,116 20,946,630 78.0% 77.3% 100.9% 95.3% 94.5%
2017 Jan 333.2 350.7 17,779,642 19,725,973 72.7% 77.3% 94.0% 90.1% 95.0%
2017 Feb 290.4 304.9 15,700,628 17,128,142 74.5% 77.2% 96.5% 91.7% 95.2%
2017 Mar 305.3 307.3 16,764,547 17,371,875 75.6% 77.7% 97.3% 96.5% 99.4%
2017 Apr 254.8 265.0 14,867,018 15,224,914 80.2% 78.9% 101.6% 97.6% 96.1%
2017 May 199.5 229.6 11,815,521 13,337,607 81.8% 79.8% 102.5% 88.6% 86.9%
2017 Jun 192.3 199.0 11,333,533 11,757,592 81.1% 81.2% 99.9% 96.4% 96.6%
2017 Jul 219.2 214.5 12,761,397 12,656,629 80.0% 81.1% 98.6% 100.8% 102.1%
2017 Aug 256.8 257.4 15,218,694 14,985,875 81.4% 80.0% 101.8% 101.6% 99.8%
2017 Sep 290.3 297.0 16,806,448 16,952,276 79.5% 78.4% 101.4% 99.1% 97.7%
2017 Oct 353.6 352.7 19,369,745 19,762,663 75.2% 77.0% 97.7% 98.0% 100.3%
2017 Nov 360.2 363.5 19,019,925 20,265,846 72.5% 76.6% 94.6% 93.9% 99.1%
2017 Dec 373.6 372.4 20,192,067 20,840,750 74.2% 76.9% 96.5% 96.9% 100.3%
2018 Jan 340.2 350.7 19,003,387 19,742,561 76.7% 77.3% 99.2% 96.3% 97.0%
2018 Feb 268.7 304.9 14,998,414 17,142,508 76.7% 77.2% 99.4% 87.5% 88.1%
2018 Mar 319.1 307.3 16,879,016 17,386,408 72.7% 77.7% 93.6% 97.1% 103.8%
2018 Apr 247.5 265.0 14,079,011 15,237,619 78.2% 78.2% 79.0% 99.0% 92.4% 93.3%
2018 May 226.3 229.6 13,330,085 13,348,708 80.9% 80.9% 79.9% 101.3% 99.9% 98.6%
2018 Jun 181.3 199.0 10,863,812 11,767,352 82.3% 82.5% 81.2% 101.4% 92.3% 91.1%
2018 Jul 166.9 214.5 10,866,539 12,592,464 80.8% 80.9% 80.6% 100.2% 86.3% 77.8%
2018 Ago 245.9 257.4 13,609,041 14,909,869 76.0% 77.2% 79.6% 95.5% 91.3% 95.6%
2018 Sept 291.8 297.0 16,136,009 16,866,260 76.0% 76.3% 78.0% 97.4% 95.7% 98.2%
2018 Oct 344.2 352.7 18,488,004 19,778,899 73.8% 74.5% 77.0% 95.8% 93.5% 97.5%
2018 Nov 369.9 363.5 19,620,968 20,282,452 72.9% 73.4% 76.6% 95.2% 96.7% 101.6%
2018 Dec 373.1 372.4 19,686,427 20,857,782 72.5% 73.0% 76.9% 94.3% 94.4% 100.1%
PR actual
Insolation Insolation (Irr>75
Year Month raw Ref. Actual Energy Energy Ref. PR actual W/m2 PR Ref. OPR IPR WPR
kwh/m2 kwh/m2 (kWh) (kWh) without FM
events)
2020 Jan 348.7 350.7 18,710,396 19,427,340 73.7% 73.7% 76.1% 96.9% 96.3% 99.4%
2020 Feb Err:508 304.9 16,123,586 16,868,909 Err:508 Err:508 76.0% Err:508 95.6% Err:508
2020 Mar 370.2 307.3 16,474,514 17,109,025 61.1% 61.1% 76.5% 79.9% 96.3% 120.5%
2020 Apr 263.7 264.9 14,093,732 14,994,327 73.4% 73.4% 77.8% 94.4% 94.0% 99.5%
2020 May 231.3 225.1 12,464,365 13,135,659 74.0% 74.0% 80.2% 92.3% 94.9% 102.8%
2020 Jun 196.4 187.6 10,993,920 11,579,616 76.9% 76.9% 84.8% 90.7% 94.9% 104.7%
2020 Jul 223.0 214.5 12,103,324 12,391,406 74.6% 74.6% 79.4% 93.9% 97.7% 104.0%
2020 Aug 251.7 257.4 13,311,541 14,671,904 72.6% 72.6% 78.3% 92.8% 90.7% 97.8%
2020 Sep 295.6 297.0 15,323,115 16,597,176 71.2% 71.2% 76.8% 92.8% 92.3% 99.5%
2020 Oct Err:508 352.7 Err:508 19,463,098 Err:508 Err:508 75.8% Err:508 Err:508 Err:508
2020 Nov Err:508 363.5 Err:508 19,958,739 Err:508 Err:508 75.4% Err:508 Err:508 Err:508
2020 Dec Err:508 372.4 Err:508 20,525,018 Err:508 Err:508 75.7% Err:508 Err:508 Err:508
TOTAL Err:508 21,052 1,130,190,681 1,197,334,606 Err:508 Err:508 78.5% Err:508 Err:508 Err:508
(1) OPR (Operating Performance Ratio) = Actual Production / Expected Production Considering Irradiation.
Describes the Performance of the Plant versus the Irradiation Corrected Expected Performance.
(2) IPR (Investment Performance Ratio) = Actual Production / Reference Production Yield.
Describes the Performance of the Plant versus the Reference Production.
(3) WPR: (Weather Performance Ratio) = Actual Insolation / Reference Insolation.
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
120.0%
Dec/2014
Oct/2015 Mar/2015
Dec/2015 Apr/2015
May/2015
Feb/2016
Jun/2015
Apr/2016
Jul/2015
Jun/2016
Aug/2015
Aug/2016
Sep/2015
Oct/2016
Oct/2015
Dec/2016 Nov/2015
Feb/2017 Dec/2015
Apr/2017 Jan/2016
4.1 Energy meter vs monthly reference (kWh)
OPR
Oct/2017 Apr/2016
Dec/2017 May/2016
Q4 - 2020
Feb/2018 Jun/2016
Jul/2016
Apr/2018
IPR
Aug/2016
Jun/2018
GENERACIÓN SOLAR SPA
Sep/2016
Aug/2018
Feb/2019 Jan/2017
Apr/2019 Feb/2017
Jun/2019 Mar/2017
Aug/2019 Apr/2017
Oct/2019 May/2017
Dec/2019 Jun/2017
Feb/2020 Jul/2017
Apr/2020 Aug/2017
Sep/2017
Monthly Energy production (GWh-month)
Jun/2020
Oct/2017
Aug/2020
Nov/2017
Oct/2020
Dec/2017
Dec/2020
Jan/2018
Feb/2018
Mar/2018
Apr/2018
May/2018
Jun/2018
DELTA ESTRELLA - SOUTH ENERGY
Jul/2018
Página 8
Aug/2018
Energy production reference
May/2018
Jun/2018
Jul/2018
Aug/2018
Sep/2018
Oct/2018
Nov/2018
Dec/2018
Jan/2019
reference (GWh-month)
Feb/2019
5 AVAILABILITY CALCULATIONS
The Availability Ratio during the period was calculated as indicated in the O&M Contract Exhibit D, and was 98,63%
below the contractual obligations set to 99.00%.
Availability
Fecha Daily HPER Daily HDOWN Daily Hgrace Availability with Force
Majeuor
(Grid
(Total losses /
(Sun hours) energy) losses /
energy)
10/1/2020 11 - 24.15 100.0% 96.1%
10/2/2020 11 - - 100.0% 100.0%
10/3/2020 11 - - 100.0% 100.0%
10/4/2020 11 - - 100.0% 100.0%
10/5/2020 11 - - 100.0% 100.0%
10/6/2020 11 - - 100.0% 100.0%
10/7/2020 11 - - 100.0% 100.0%
10/8/2020 11 1.20 - 99.8% 99.8%
10/9/2020 11 - - 100.0% 100.0%
10/10/2020 11 - 2.89 100.0% 99.6%
10/11/2020 11 - - 100.0% 100.0%
10/12/2020 11 - 12.93 100.0% 98.0%
10/13/2020 11 - 29.53 100.0% 95.6%
10/14/2020 11 - - 100.0% 100.0%
10/15/2020 11 - - 100.0% 100.0%
10/16/2020 11 - 2.90 100.0% 99.6%
10/17/2020 11 - - 100.0% 100.0%
10/18/2020 11 - - 100.0% 100.0%
10/19/2020 11 - - 100.0% 100.0%
10/20/2020 11 - - 100.0% 100.0%
10/21/2020 11 - - 100.0% 100.0%
10/22/2020 11 - - 100.0% 100.0%
10/23/2020 11 - - 100.0% 100.0%
10/24/2020 11 - - 100.0% 100.0%
10/25/2020 11 - - 100.0% 100.0%
10/26/2020 11 - - 100.0% 100.0%
10/27/2020 11 - - 100.0% 100.0%
10/28/2020 11 - - 100.0% 100.0%
10/29/2020 11 - - 100.0% 100.0%
10/30/2020 11 - - 100.0% 100.0%
10/31/2020 11 - - 100.0% 100.0%
Availability
Fecha Daily HPER Daily HDOWN Daily Hgrace Availability with Force
Majeuor
Availability
Fecha Daily HPER Daily HDOWN Daily Hgrace Availability with Force
Majeuor
3 10/7/2020 08:00:00 AM 09:30:00 AM CT 17, E2, E4, E5, RESET OF INVERTERS E2, E4, E5, E6, E7 AND E8 IN CT 1000 KW/H
E6, E7, E8 17, REST OF THE INVERTER MODULE OPERATING
5 10/8/2020 08:00:00 AM 09:30:00 AM CT 25 INOPERATIVE COMPLETE INVERTERS MODULE START 1200 KW/H
UP IN CT 15
8 10/14/2020 08:00:00 AM 08:55:00 AM CT 48 INOPERATIVE COMPLETE INVERTERS MODULE START 1100 KW/H
UP IN CT 48
16 10/27/2020 08:00:00 AM 10:30:00 AM CT 45 RESET OF INVERTERS E6, E7, AND E8 IN CT 45, REST 600 KW/H
OF THE INVERTER MODULE OPERATING
20 10/28/2020 08:00:00 AM 11:20:00 AM CT 20 RESET OF INVERTERS E2, E3, E4 AND E7 IN CT 20, 600 KW/H
REST OF THE INVERTER MODULE OPERATING
22 11/5/2020 08:00:00 AM 09:30:00 AM CT 17 INOPERATIVE COMPLETE INVERTERS MODULE START 1150 KW/H
UP IN CT 17
23 11/10/2020 08:00:00 AM 09:00:00 AM CT 40 INOPERATIVE COMPLETE INVERTERS MODULE START 1150 KW/H
UP IN CT 40
32 11/23/2020 08:00:00 AM 09:00:00 AM CT 45 INOPERATIVE COMPLETE INVERTERS MODULE START 1150 KW/H
UP IN CT 45
34 11/25/2020 08:00:00 AM 09:15:00 AM CT 27 INOPERATIVE COMPLETE INVERTERS MODULE START 1150 KW/H
UP IN CT 27
35 11/25/2020 08:00:00 AM 10:00:00 AM CT 45 INOPERATIVE COMPLETE INVERTERS MODULE START 1200 KW/H
UP IN CT 45
44 12/11/2020 08:00:00 AM 10:30:00 AM CT 35 INOPERATIVE COMPLETE INVERTERS MODULE START 1150 KW/H
UP IN CT 35
45 12/15/2020 08:00:00 AM 09:00:00 AM CT 30 INOPERATIVE COMPLETE INVERTERS MODULE START 1150 KW/H
UP IN CT 30
Q4 - 2020
40 41 42 43 44 45 46 47 48 49 50 51 52
Revision Browning and Yellowing effect X X X X X
Panel cleaning X X X X X
Visual checks of the gap distance from the bottom part of the module to the terrain X X X X X
Laboratory flash test
Revision of possible damage on the surface of the panels Semi-annual OK OK OK OK OK
Revision of shadows on the panels and remove if necessary X X X X X
Visual Revision of junction boxes OK OK OK OK OK
Visual check of connectors and cables OK OK OK OK OK
Visual check of stability, rigidity and fixing of the panels X X X X X
Thermography
Yearly
Open circuit voltage measurement
MAINTENANCE PLANNING FOR SECONDARY ELECTRICAL PANELS LEVEL 1 OCTOBER NOVEMBER DECEMBER
Visual inspection of pilot signals of fuses OK OK OK
Monthly
Check the control panel lights and indicators OK OK OK
Checking for proper fastening, impacts, breaks or deformations
Visual inspection of terminals, panels and conductors
Grounding condition checking
Insulation measurement of bus bars with respect to grounding
Circuit-breaker trip check
Check the condition of the thermal magnet circuit-breakers
Check for proper sealing
Semi-annual
Visual inspection of the enclosure
Visual check for loose connections
Location of switches and circuit breakers with deficiencies
Check the condition of the surge arresters
Check for possible heating
Thermographic analysis of electrical control panels
Electrical control panel voltages check
Electrical panels general clearing
Check the door and lock
Check the plates and identifying elements in the control panel
Yearly
Apply the contact cleaner
Retightening of the screws
Retightening of the switchboard's ring terminals
MAINTENANCE PLANNING FOR SECONDARY ELECTRICAL PANELS LEVEL 2 OCTOBER NOVEMBER DECEMBER
Checking the panel lights and indicators OK OK OK
Monthly
Visual inspection of pilot signals of fuses OK OK OK
Visual inspection of terminals, panels and conductors X
Checking for proper fastening, possible impacts, breaks or deformations X
Checking for possible excessive overheating X
Grounding condition checking X
Visually check for possible loose connections X
Location of switches or circuit-breakers with possible deficiencies X
Checking the correct state of voltage dischargers Semi-annual X
Checking for proper sealing, absence of humidity X
Visual inspection of the enclosure X
Circuit-breaker trip check X
Inspection of the condition of the thermal magnetic circuit-breakers X
Thermographic analysis of the switchboard X
Checking the voltages of the switchboard X
Insulation measurement of bus bars with respect to grounding
Check the door and lock
Check the good condition of the plates and identifying elements in the control panel
Applying contact cleaner Yearly
Re-tighten the panel protection device screws
Re-tighten the panel ring terminals
Electrical panels general clearing
MAINTENANCE PLANNING FOR INVERTER OCTOBER NOVEMBER DECEMBER
01.- General inspection of the equipment OK OK OK
02.- Check the condition of cables and terminals OK OK OK
05.- Check the proper condition and operation of th lighting of the building replacing lamps or tubes i OK OK OK
necessary Monthly OK OK OK
11.- Verify the absence of alarms in the control equipment OK OK OK
13.- Dust cleaning into the inverters cabins X X X
15.- Checking the functional grounding (Bender Isometer PV) X
08.- Check the correct ventilation of the equipment X
09.- Check the proper state of front air grate and rearwards filters Semi-annual X
04.- Visual check of connections
06.- Check the lack of humidity inside the cabinet
07.- Check the proper anchoring of equipment (upper and lower)
10.- Check the environment condition
Yearly
12.- Thermography: correct the detected hot spots
14.- Checking the grounding of the inverter
03.- Check the proper tightening of screws works and cables
Check air dryer (Replacement of silica gel when its color is pink) of the power transformer.
MAINTENANCE PLANNING FOR HARDWARE (PERIMETER FENCE AND ACCESS GATES) OCTOBER NOVEMBER DECEMBER
01.- Status checking of perimeter fence
02.- Status checking of access gates
03.- Functioning statuses of latches and hinges
04.- Lubrication of gates Semi-anual
05.- Checking of fence corrosion status, proceeding to paint if necessary
06.- Status checking of vegetation, removing if necessary
07.- Apply herbicides in areas of fencing
08.- Chemical analysis of three water wells (Ph. Hardness, etc..) Yearly
MAINTENANCE PLANNING FOR CONTROL BUILDING OCTOBER NOVEMBER DECEMBER
01.- Cleaning of control panel
02.- Review of operation of signal lamps on the control panel
03.- Function Testing relay of control panel
04.- Test cuts from the relay control panel.
05.- Checking of the operation of electromechanical relays of the control panel
06.- Review and tighten of terminals at the control panel
07.- Manoeuvres making with control panels remote controls.
08.-Review of operation of automatic and differential Auxiliary Service Yearly
09.- Review of operation of the remote control and lamp signalling on control panel and auxiliary serv
10.- Review and tighten the terminals of the Auxiliary Service
11.- Review DC battery
12.- Check of the high-voltage safety
13.- Fire protection material testing
14.- Regular lighting testing
15.- Emergency lighting testing
MAINTENANCE PLANNING FOR LOW VOLTAGE POWER LINES OCTOBER NOVEMBER DECEMBER
03.- Visual check of the MULTI-CONTACTs Semi-annual
01.- Check the condition of pipelines and grounding of metal parts (trays).
02.- Comprobar las bridas de sujeción de los conductores.
04.- Visual inspection of insulation, covering a splices
05.- Inspection of the critical points that appear in the electrical switchboards Yearly
06.- Inspection of the splices in the boxes.
07.- Maintenance of the communications wiring.
08.- Measurement of grounding resistance.
MAINTENANCE PLANNING FOR LOW VOLTAGE CHANNELING OCTOBER NOVEMBER DECEMBER
01.- Metal tray: treating parts affected by corrosion and correct earth connection.
02.- PVC tray: treating sections that may be in bad state. Semi-annual
03.- Tray channelling: inspection to avoid rodents.
04.- Buried channelling: verify sealing of tubes. Yearly
Technical Non
Company Turn Male Female Staff Technical Total
Staff
SunEdison Day - - - - -
Reycon Day 7 2 9 - 9
EECC PV
Module Day - - - - -
cleaner
Occupational Occupational
Health and Health and
No. Jul Aug Sept Safety
Safety Incident
Incidents Details
Total number of
1 workers (hired 14 12 15 No comments
workers)
2 Total man-hours 1344 2041 1902 Total man-hours worked this reporting period
worked
Number of
3 fatalities 0 0 0 None
Number of (non-
fatal) lost time
4 occupational 0 0 0 None
injuries
Total number of
5 lost workdays due 0 0 0 None
to injuries
Number of new
6 occupational 0 0 0 None
disease cases
Number of vehicle
7 colisions resulting 0 0 0 None
in injuries
Severity rate of
9 new cases 0 0 0 None
Date of Incident
No. incident Type severity Description
01 cleaning staff company Siac Ltda reports evident symptoms of Covid infection
1 7/1/2020 Near Miss N°001 Mid potential 19. Preventive quarantine is implemented. Until 07-15-20. / Temporary
replacement is contracted and health evolution is monitored.
Deviation detected: LOTO procedure not applied correctly, does not comply with
sub standard the 5 golden rules. (1. De-energization: OK; 2. Prevent re-energization: Does not
6 8/28/2020 condition High potential comply; 3. Verify energy 0: Does not comply; 4. Grounding: OK (CN-1 and Structure
grounded); 5. Signal danger in the area: No complies. // Leaves no lockout or de-
energization record.
8. ANNEXES
Instalación /
Fecha / Hora Inicio Pérdida Causa Fecha / Hora Término Nº CEN
Equipo
PLANT LIMITATION TO 20 MW / H
1/1/2021 8:14 REQUESTED BY ENOR-CHILE; BY 15 MW/H 1/1/2021 9:09 55
CONTROLLED RISE OF GENERATION DUE MINUTES
TO LOW DEMAND IN THE SEN
PLANT LIMITATION TO 39 MW / H
REQUESTED BY ENOR-CHILE; BY
39
1/1/2021 9:09 GENERALIZED PRO-RATE DUE TO EXCESS 16 MW/H 1/1/2021 9:48 MINUTES
OF GENERATION IN THE SYSTEM.
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 55 MW / H
REQUESTED BY ENOR-CHILE; BY
1/10/2021 12:07 GENERALIZED PRO-RATE DUE TO EXCESS 3 MW/H 1/10/2021 12:40 33
MINUTES
OF GENERATION IN THE SYSTEM.
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 57 MW / H
REQUESTED BY ENOR-CHILE; BY
1/10/2021 12:40 GENERALIZED PRO-RATE DUE TO EXCESS 1 MW/H 1/10/2021 12:50 10
OF GENERATION IN THE SYSTEM. MINUTES
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 57 MW / H
REQUESTED BY ENOR-CHILE; BY 1 HOUR
1/10/2021 15:17 GENERALIZED PRO-RATE DUE TO EXCESS 1 MW/H 1/10/2021 16:21 AND 4
OF GENERATION IN THE SYSTEM. MINUTES
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 45 MW / H
REQUESTED BY ENOR-CHILE; BY TRANSFER 1 HOUR
1/13/2021 15:32 CONTROL LT 500 KV NVA PAN DE AZUCAR - 12 MW/H 1/13/2021 17:18 AND 46
POLPAICO CIRCUIT 1 AND 2 BY LINE MINUTES
CAPACITY
PLANT LIMITATION TO 43 MW / H
REQUESTED BY ENOR-CHILE; BY TRANSFER
1/13/2021 17:18 CONTROL LT 500 KV NVA PAN DE AZUCAR - 10 MW/H 1/13/2021 18:08 50
MINUTES
POLPAICO CIRCUIT 1 AND 2 BY LINE
CAPACITY
PLANT LIMITATION TO 55 MW / H
REQUESTED BY ENOR-CHILE; BY
1/16/2021 16:24 GENERALIZED PRO-RATE DUE TO EXCESS 3 MW/H 1/16/2021 17:22 58
OF GENERATION IN THE SYSTEM. MINUTES
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 54 MW / H
REQUESTED BY ENOR-CHILE; BY 28
2/7/2021 12:58 GENERALIZED PRO-RATE DUE TO EXCESS 4 MW/H 2/7/2021 13:26
OF GENERATION IN THE SYSTEM. MINUTES
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 52 MW / H
REQUESTED BY ENOR-CHILE; BY 1 HOUR
2/7/2021 16:23 GENERALIZED PRO-RATE DUE TO EXCESS 3 MW/H 2/7/2021 17:41 AND 18
OF GENERATION IN THE SYSTEM. MINUTES
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 47 MW / H
REQUESTED BY ENOR-CHILE; BY
2/7/2021 17:41 GENERALIZED PRO-RATE DUE TO EXCESS 3 MW/H 2/7/2021 18:15 34
MINUTES
OF GENERATION IN THE SYSTEM.
MARGINAL COST 0 USD / MWh
PLANT LIMITATION TO 20 MW / H
2/14/2021 8:32 REQUESTED BY ENOR-CHILE; BY WAITING 5 MW/H 2/14/2021 9:08 36
PERIOD DUE TO REDUCTION OF MINUTES
GENERATION OF THERMAL POWER PLANTS
PLANT LIMITATION TO 21 MW / H
2/28/2021 8:57 REQUESTED BY ENOR-CHILE; BY WAITING 7 MW/H 2/28/2021 9:28 31
PERIOD DUE TO REDUCTION OF MINUTES
GENERATION OF THERMAL POWER PLANTS
Err:508
Err:508
Err:508
CAJAS DE NIVEL 1.
MEINS (C.T)
MEINS (C.T)
- TERMINALES 10 CU 17 - I3
JUEGOS DE SONDAS PARA EL
- TRANSFORMADOR IKI 30 E 4 - I3
- RELÉ DE PROTECCIÓN CELDAS MT IKI 30 3 - H3
UNIDAD COMPLETA DE RELÉ SIEMENS 230 V.
- AC RT3A4T30 2 - H3
8
- JUNTAS DE VENTILACIÓN DE GOMA - K1 Y L1
CAJAS
VARIAD
AS
SUBESTACIÓN (SAESA)
- JUNTAS DE GOMA:
_VÁLVULA DE RADIADORES 90 - M2
_CÚPULA AT 12 - M2
_AISLADOR AT 6 - M2
_VÁVULA 2 12 - M2
_CONMUTADOR 2 - M2
_TAPA TANQUE CONSERVADOR 4 - M2
_VÁLVULA 1 20 - M2
_AISLADOR BT 3 - M2
_AISLADOR NAT 2 - M2
_MANHOLE 200 2 - M2
_MANHOLE 300 2 - M2
_MANHOLE 400 4 - M2
_VÁLVULA DN 80 12 - M2
_VÁLVULA DE SOBREPRESIÓN 6 - M2
_VÁLVULA DE 1/2" 8 - M2
_TUBO DE 3" 3 - M2
_TUBERÍA DESFOGUE 13 - M2
_SUJECIÓN PA 10 - M2
_JUNCTION BLOCK ATERRIZAJE 6 - M2
20
- CABLE COAXIAL RG 58 METRO - M2
S
INTERRUPTOR MAGNETOTÉRMICO
- SCHNEIDER 2 POLOS 2A. 1 - N2
INTERRUPTOR MAGNETOTÉRMICO
- SCHNEIDER 2 POLOS 3A. 1 - N2
- INTERRUPTOR MAGNETOTÉRMICO 1 - N2
SCHNEIDER 2 POLOS 4A.
INTERRUPTOR MAGNETOTÉRMICO
- 1 - N2
SCHNEIDER 2 POLOS 10A.
- INTERRUPTOR MAGNETOTÉRMICO 1 - N2
SCHNEIDER 2 POLOS 16A.
- INTERRUPTOR MAGNETOTÉRMICO 1 - N2
SCHNEIDER 2 POLOS 20A.
INTERRUPTOR MAGNETOTÉRMICO
- SCHNEIDER 2 POLOS 25A. 1 - N2
- INTERRUPTOR MAGNETOTÉRMICO 0 - N2
SCHNEIDER 2 POLOS 32A.
INTERRUPTOR MAGNETOTÉRMICO
- SCHNEIDER 4 POLOS 2A. 1 - N2
- INTERRUPTOR MAGNETOTÉRMICO 1 - N2
SCHNEIDER 4 POLOS 10A.
INTERRUPTOR MAGNETOTÉRMICO
- SCHNEIDER 4 POLOS 16A. 1 - N2
INTERRUPTOR MAGNETOTÉRMICO
- SCHNEIDER 4 POLOS 20A. 0 -
BONFIGLIOLI (INVERSORES)
MÓDULO POWERBLOCK INVERSOR
- BONFIGLIOLI. 0 - BODEGA DE BATERÍAS
- FUSIBLES ETI O SIBA 400 A. 1000 V. 6 - O3
- PORTA FUSIBLES ETI 400A. 1000V 30