You are on page 1of 1

Duration

No Start Finish Time Remarks


(days)
1 HAZOP 16-May 20-May 3
2 Basic LOPA 28-May 29-May 2
3 P&ID 3-Jun 17-Jun 2 08.00 - 09.00 OFF 4-Jun - 16-Jun
4 Control System, Basic Logic 18-Jun 18-Jun 1 08.00 - 09.00
5 Numbering System 19-Jun 19-Jun 1 08.00 - 09.00
6 Calculate a system pressure drop - Use Cranes with system that includes height change, valves, and vessels. 20-Jun 21-Jun 2 08.00 - 09.00
7 Size line diameters – Know standard velocities & Max Velocities. 24-Jun 25-Jun 2 08.00 - 09.00
8 PSSR 26-Jun 27-Jun 2 08.00 - 09.00
9 Rating pump - affinity law, Be able to read a pump curve, check head and NPSH available and required 28-Jun 2-Jul 3 08.00 - 09.00
10 Size a relief valve – by ASME Standards. 3-Jul 5-Jul 3 08.00 - 09.00
11 Design consideration of Presssure relieving System 8-Jul 10-Jul 3 08.00 - 09.00
12 Size a control valve from Fisher/masoneilan Book 11-Jul 15-Jul 3 08.00 - 09.00
13 Rating Existing Control valve - Calculate a flow from the percent of a control valve opening. 16-Jul 18-Jul 3 08.00 - 09.00
14 Size a flow orifice – from Cranes. 19-Jul 23-Jul 3 08.00 - 09.00
During TAM
15 Size a restriction orifice – from Cranes. 24-Jul 26-Jul 3 08.00 - 09.00
16 Design of Pump 29-Jul 31-Jul 3 08.00 - 09.00
17 Understanding of Moillier Charts & Winsteam software- for turbine and steam system calculation 1-Aug 5-Aug 3 08.00 - 09.00
18 Size a tank containment area, meet API codes. 6-Aug 8-Aug 3 08.00 - 09.00
19 Hysys training #1 9-Aug 13-Aug 3 08.00 - 09.00