POUR CARD - Concrete

Project:............................... Contractor:..................... Date: .....................

Floor: ............................... Location: ......................... (attach plan if required)

FORMWORK OF...................

Verticality........................... Twisting of Shuttering…………………………

Face Support/Bracing............................ Line / Level:.................


Type / Clean / Oiled:.............................. Joints in Form: ..............................

Key / w-bar / joints: ............................ Blockouts / fixings: ........................

SERVICES (to be signed off by services contractors)

Mechanical: ....................... Electrical:..................... Plumbing:.....................

REINFORCEMENT

Type / Size / Clean:............................... Fixing / Chairs: ..........


Spacing: ............................................... Cover: .............................................

PRE-CONCRETING

Pour height: ................................. Final clean:.......................................

Placing arrangements: .....................................

Contractor's Eng: ……..…… Contractor's Proj Mgr:S …………… SAHITI: ……………

DURING CONCRETING

Slump: ………… Ambient temp: ……… 0C Concrete temp: ..… 0C Cubes: ………

Compaction: ………. Alignment: ………… Level: ……………… Curing: ………….

POST CONCRETING

Clean up: ............................................. Cubes: ...................................

Stripping:

Curing: ............................................. Making good: .................................

Comments (if any): .........................................................................................


..........................................................................................................................

Contractor's Eng: ……..…… Contractor's Proj Mgr: …………… SAHITI: ……………

Project: ...............................Contractor: ..................... Date: .....................


STEEL & SHURRETING CHECKLIST
Floor: ............................... GRID: ………………………………………………………….

FORMWORK

Type / Clean / Oiled


 Correct type used for the required finish (eg fair-faced slab soffit)
……………………………..

 ………………………………………………………………………………………………………..

 Faces of formwork cleaned………………………………………………………………………..

 Formwork release oil has been applied to formwork. ………………………………………….

Line / Level

 Alignment: Particular care required for:


- outside face of perimeter beams and columns (check tolerances against external
stonework and curtain walling)…………………………………………………………….

- …………………………………………………………………………………………………

- lift shafts (internal dimensions, including diagonals; check verticality of every lift)

…………………………………………………………………………………………………..
- columns (adequate bracing to prevent twisting).

- ………………………………………………………………………………………………

 Level: Suspended slabs to be precambered (allow +4mm overall for settlement, then
camber between columns, then additional camber at middle of slab panel eg for 9 x 9
grid, +4 at columns, +11 at midspan (ie +4+7) +18 at midpanel (ie 11+7)).

…………………………………………………………………………………………………………
 Level - staircases: Particular care required to ensure level for top of treads suits depth
of

floor finishes………………………………………………………………………………………..

Joints / Security

 Joints to be tight. Joints in slab formwork to be taped / M.S Patty ………………………….

……………………………………………………………………………………………………….

 Joints to be secure eg adequate clamps beam / column………………………………………

………………………………………………………………………………………………………..

 Ties tightened……………………………………………………………………………………….

 Stair risers to be securely


fixed……………………………………………………………………

11.11.00 Sheet 2 of
STEEL & SHURRETING CHECKLIST

Key / w-bar / Joints

 Adequate key provided to previous pour (slab edge or top of kicker scabbled.

………………………………………………………………………………………..
 Water bar provided if specified.

……………………………………………………………………………………….
 Construction joint is in approved position (one-third span).

………………………………………………………………………………………..
 Expansion joints provided if shown on drawings.

…………………………………………………………………………………………

Blockouts / fixings

 Blockouts provided to suit builder's work drawings and potential future requirements.

…………………………………………………………………………………………………
 Cast-in fixings or anchor bolts.

………………………………………………………………………………………………

 Back Propping at Lower Slabs

………………………………………………………………………………………………

CONTRACTOR COMMENTS...................................................................................................
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
……………………………………………………………………………………………………………

SAHITI INSTRUCTIONS

..................................................................................................................................................
……………………………………………………………………………………………………………
..................................................................................................................................................

Completed: .................................. Approved to start:…………………..................................


Contractor SAHITI Project Mgr

11.11.00 Sheet 3 of
STEEL & SHURRETING CHECKLIST
REINFORCEMENT

Type / Size / Clean

 High yield v mild…………………………………………………………………………..


 Diameter, length and shape as per drawings…………………………………………
 To be free from rust, dust or oil……………………………………………………….

Fixing / Chairs

 Reinforcement is securely fixed…………………………………………………


 Adequate number of chairs provided……………………………………………

Spacing

 As per drawings (minimum spacing = aggregate diameter + 5mm; if not achieved, bars to
be in pairs)…………………………………………………………………………………………..

Cover

 Approved cover blocks used……………………………………………………………………


 To starter bars (to be securely fixed in position)…………………………………………….
 To sleeves and box-outs……………………………………………………………………….

CONTRACTOR COMMENTS...................................................................................................
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

SAHITI INSTRUCTIONS

..................................................................................................................................................
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………
..................................................................................................................................................

Completed: .................................. Approved to start:…………………..................................


Contractor SAHITI Project Mgr

11.11.00 Sheet 4 of