Professional Documents
Culture Documents
Page
Wrong answer summary
Correct answer: Oa es
'I
Repoli to relevant authorAies.
Page
Wrong answer summary
siC14-141:1A aNTIN
Page
Wrong answer summary
Don't know
Correct answer:
Only send a posime delivery notification (12014) to the sender if the sender requested, so in the
send menu
Onboard the foJlowing message is received on the DSC controller: DC10. 24532900.0 0116 , S
distress ack 24412310.0
Vorhat station sent the distress acknowledgement?
Selected answer (score 0): D-on't know
Correct answer:
245329000
■••••• PC
Correct an
ampe e x hours
r:.
A battery of 24 Volt supplies during 10 hours a current of ampere. What is the capacity
ppPied:
Selected answer (score 0):
D-on't know
Wrong answer summary
Correct answer: 50 Ah
41r 1
111
Selected answer (s -core 0):
Don't know
Correct aiswer:
One that employs more than one position fixing system
Correct newer:
You inform the NCS that the SES is available for comunications_ IC1,7 Mal:=Irolr
Page
Wrong answer summary
1110
Question asked (ePl4n# 5g0):
Every inflatable literati dnflaitable lifejacket and hydrostatic release units shall be seri! iced:
Selected answer (s-core 0): Don't know
Correct answer:
Every 12 months.
Page 8/10
Wrong answer summary
When conducting a risk assessment for a shipboard work activity, the two elements to be considered
are:
Selected answer (score 0):
Don't know
Correct answer:
The potential severity of harm and the likelihood that harm will occur.
A report giving the result of the Conformance Test issued by an Application Service Provider on MEW
behalf of an Administration
Page
Wrong answer summary