The document describes the materials and facilities available at the Sheraton (Hyatt Regency) Hotel in Abuja. Concrete was extensively used as a construction material for the exterior, which has a beige finish with polka dots and ceramic tiles. Internally, a variety of materials were used including wallpaper, wood, marble, ceiling finishes, and carpets. Lighting includes recessed fixtures in the lobby and bedside lamps in guest rooms. The hotel has 671 rooms of various types, along with restaurants, bars, meeting rooms, a conference center, business center, and fitness facilities.
The document describes the materials and facilities available at the Sheraton (Hyatt Regency) Hotel in Abuja. Concrete was extensively used as a construction material for the exterior, which has a beige finish with polka dots and ceramic tiles. Internally, a variety of materials were used including wallpaper, wood, marble, ceiling finishes, and carpets. Lighting includes recessed fixtures in the lobby and bedside lamps in guest rooms. The hotel has 671 rooms of various types, along with restaurants, bars, meeting rooms, a conference center, business center, and fitness facilities.
The document describes the materials and facilities available at the Sheraton (Hyatt Regency) Hotel in Abuja. Concrete was extensively used as a construction material for the exterior, which has a beige finish with polka dots and ceramic tiles. Internally, a variety of materials were used including wallpaper, wood, marble, ceiling finishes, and carpets. Lighting includes recessed fixtures in the lobby and bedside lamps in guest rooms. The hotel has 671 rooms of various types, along with restaurants, bars, meeting rooms, a conference center, business center, and fitness facilities.
SHERATON (HYATT REGENCY) HOTEL, ABUJA ELEGBELEYE LEYE STEPHEN
Consequently, concrete was used extensively as a construction material. The exterior finishes of the DEPT: building is mainly beige, polka doted 2.5cm main finish and ceramic tiles. These tiles were extensively ARCHITECTURAL TECHNOLOGY LEVEL : used in the accommodation tower of the hotel and in the lower parts of the hotel building. Internally, HND 2 numerous materials were used: matt water-proof wall paper, wood finish, marble tiles, internal railed vermiculite ceiling finishes, carpet finishes etc. Also lighting used in the internal design of the hotel ranged from hollow submerged lighting fixture in the entrance lobby to bed side lamps in the guest PROJECT TOPIC: rooms. FACILITIES AVAILABLE: FIVE ∑ THE AVAILABLE SPACES AND FACILITIES IN THE HOTEL ARE AS FOLLOWS: 671 ROOMS STAR ∑ 16 DELUXE SUITES ∑ CAR RENTAL ∑ 2 AMBASSADORIAL SUITES ∑ STREAM ROOMS HOTEL ∑ BANK ∑ TENNIS COURTS ∑ 4 PRESIDENTIAL SUITES LOCATION: ∑ COURIER SERVICES JUICE BAR ∑ 32 EXECUTIVE SUITES ∑ NIGHT CLUB IYAMU ∑ 613 STANDARD ROOMS COMMUNITY ∑ CASINO ∑ 3 RESTAURANTS ∑ HAIRSTYLES LIST ∑ LUIGI'S RESTAURANT ∑ LAUNDRY MAT NO: ENV/2291740062 ∑ PAPILLION RESTAURANT ∑ 8 MEETING ROOMS (150 PERSONS EACH) COURSE ARCHITECTURAL DESIGN ∑ MIRABELLE RESTAURANT ∑ CONFERENCE CENTER (2500 PERSON'S CAPACITY) COURSE CODE ARC 302 ∑ 2 BARS ∑ BUSINESS CENTER DATE JUNE, 2019 ∑ ELEPHANT BAR ∑ HEALTH FITNESS CENTER SHEET TITTLE ∑ LOBBY BAR ∑ GYMNASIUM ∑ GIN SHOPS CASE STUDY ∑ SAUNAS 1